X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424032611032

Well Details

Well ID: 0424032611032
Loading map...
Location: 03/11-26-042-03W4/2
Location Alias: 03/11-26-42-03 W4M
Location Alias 2: 03/11-26-042-03 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 03
Section: 26
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN 11B CHAUVS 11-26-42-3
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0183631
License Date: 1995-12-18
License Status: Suspension
Spud Date: 1996-02-28
Final Drill Date: 1996-02-29
Well Total Depth: 672.00 m
Surface Hole Latitude: 52.645974
Surface Hole Longitude: -110.334250

For data sources see[1][2]

Well History

Date Event
1995-12-18 Obtained License
1996-02-29 Finished Drilling
1996-02-29 Surface Casing Operation Performed
1996-02-29 Well Mode changed to Drilled and Cased
1996-03-01 Production Casing Operation Performed
1996-03-01 Rig Released
1996-03-01 Well Log Performed
1996-03-04 Perforation Treatment Performed - Jet Perforation
1996-03-04 Well Log Performed
1996-03-10 Perforation Treatment Performed - Fractured
1996-03-11 Perforation Treatment Performed - Jet Perforation
1996-03-11 Well Log Performed
2002-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-11 Well Log Performed
2002-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-12 Perforation Treatment Performed - Jet Perforation
2002-04-02 Well Began Production
2002-04-02 Well Fluid changed to Gas
2002-04-02 Well Mode changed to Flowing
2018-04-04 Well Fluid changed to Gas
2018-04-04 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-04 Perforation 638.40 641.00 13
1996-03-10 Fracture 638.40 641.00 0
1996-03-11 Perforation 648.00 651.00 26
2002-01-11 Packing Device Capped w/Cement 639.00 647.00 0
2002-01-12 Packing Device Capped w/Cement 622.00 630.00 0
2002-01-12 Perforation 544.00 547.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 6456 0.0 0.0 0.0
2003 8676 0.0 0.0 0.0
2004 8649 0.0 0.0 0.0
2005 8374 0.0 0.0 0.0
2006 8155 0.0 0.0 0.0
2007 8310 0.0 0.0 0.0
2008 8521 0.0 0.0 0.0
2009 8405 0.0 0.0 0.0
2010 8293 0.0 0.0 0.0
2011 8315 0.0 0.0 0.0
2012 8571 0.0 0.0 0.0
2013 7277 0.0 0.0 0.0
2014 4518 0.0 0.0 0.0
2015 6942 0.0 0.0 0.0
2016 1845 0.0 0.0 0.0

For data sources see[5]

References