X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424023408000

Well Details

Well ID: 0424023408000
Loading map...
Location: 00/08-34-042-02W4/0
Location Alias: 00/08-34-42-02 W4M
Location Alias 2: 00/08-34-042-02 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 02
Section: 34
County/Municipality: Municipal District of Wainwright No. 61
Well Name: CINABAR CHAUVS 8-34-42-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0006326
License Date: 1953-04-20
License Status: RecCertified
Spud Date: 1953-04-23
Final Drill Date: 1953-04-30
Well Total Depth: 710.80 m
Surface Hole Latitude: 52.658703
Surface Hole Longitude: -110.201589

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-04-20 Obtained License
1953-04-28 Drill Stem Test Performed
1953-04-30 Drill Stem Test Performed
1953-04-30 Finished Drilling
1953-04-30 Well Mode changed to Drilled and Cased
1953-05-03 Production Casing Operation Performed
1953-05-06 Well Began Production
1953-05-06 Well Fluid changed to Crude Oil
1953-05-06 Well Mode changed to Pumping
1953-05-07 Perforation Treatment Performed - Jet Perforation
1987-10-26 Well Log Performed
1991-01-01 Well Fluid changed to Crude Oil
1991-01-01 Well Mode changed to Suspended
1992-04-22 Well Fluid changed to Crude Oil
1992-04-22 Well Mode changed to Pumping
1998-01-08 Well Fluid changed to Crude Oil
1998-01-08 Well Mode changed to Closed
1998-06-30 Well Fluid changed to Crude Oil
1998-06-30 Well Mode changed to Pumping
1999-09-30 Well Fluid changed to Crude Oil
1999-09-30 Well Mode changed to Suspended
2001-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-24 Plug Back Performed
2001-02-25 Perforation Treatment Performed - Jet Perforation
2001-02-25 Well Log Performed
2001-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-01 Perforation Treatment Performed - Jet Perforation
2001-03-01 Plug Back Performed
2001-03-01 Well Log Performed
2001-03-02 Perforation Treatment Performed - Cement Squeeze
2001-03-03 Perforation Treatment Performed - Cement Plug
2001-05-25 Well Abandoned
2001-05-25 Well Fluid changed to Crude Oil
2001-05-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-05-07 Perforation 683.40 685.20 13
2001-02-24 Packing Device Capped w/Cement 672.00 680.00 0
2001-02-25 Perforation 626.00 629.00 17
2001-03-01 Packing Device Capped w/Cement 607.00 615.00 0
2001-03-01 Perforation 152.00 153.00 17
2001-03-02 Cement Squeeze 152.00 153.00 0
2001-03-03 Cement Plug 112.30 153.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 708 0.0 0.0 0.0
1968 1461 0.0 0.0 0.0
1969 8567 0.0 0.0 0.0
1970 7962 0.0 0.0 0.0
1971 8644 0.0 0.0 0.0
1972 7682 0.0 0.0 0.0
1973 7977 0.0 0.0 0.0
1974 7465 0.0 0.0 0.0
1975 7792 0.0 0.0 0.0
1976 8368 0.0 0.0 0.0
1977 7221 0.0 0.0 0.0
1978 7836 0.0 0.0 0.0
1979 7572 0.0 0.0 0.0
1980 8616 0.0 0.0 0.0
1981 8735 0.0 0.0 0.0
1982 8759 0.0 0.0 0.0
1983 8087 0.0 0.0 0.0
1984 8060 0.0 0.0 0.0
1985 6617 0.0 0.0 0.0
1986 7522 0.0 0.0 0.0
1987 6353 0.0 0.0 0.0
1988 6656 0.0 0.0 0.0
1989 7811 0.0 0.0 0.0
1990 7443 0.0 0.0 0.0
1992 5927 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8591 0.0 0.0 0.0
1995 8735 0.0 0.0 0.0
1996 5255 0.0 0.0 0.0
1997 7659 0.0 0.0 0.0
1998 4298 0.0 0.0 0.0
1999 6110 0.0 0.0 0.0

For data sources see[5]

References