X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424023213000

Well Details

Well ID: 0424023213000
Loading map...
Location: 00/13-32-042-02W4/0
Location Alias: 00/13-32-42-02 W4M
Location Alias 2: 00/13-32-042-02 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 02
Section: 32
County/Municipality: Municipal District of Wainwright No. 61
Well Name: BP CHAUVS 13-32-42-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0091501
License Date: 1981-07-30
License Status: RecCertified
Spud Date: 1981-08-04
Final Drill Date: 1981-08-08
Well Total Depth: 695.00 m
Surface Hole Latitude: 52.665186
Surface Hole Longitude: -110.264528

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-07-30 Obtained License
1981-08-04 Surface Casing Operation Performed
1981-08-08 Drill Stem Test Performed
1981-08-08 Finished Drilling
1981-08-08 Rig Released
1981-08-09 Well Abandoned
1981-08-09 Well Mode changed to Abandoned
2011-08-08 Direction Drilling Operation Performed - Sidetrack Fish
2011-08-11 Perforation Treatment Performed - Cement Plug
2011-08-11 Plug Back Performed
2011-08-12 Production Casing Operation Performed
2011-11-07 Perforation Treatment Performed - Cement Plug
2011-11-07 Perforation Treatment Performed - Cement Squeeze
2011-11-07 Perforation Treatment Performed - Jet Perforation
2011-11-07 Well Log Performed
2013-09-28 Perforation Treatment Performed - Jet Perforation
2013-09-28 Well Log Performed
2013-09-29 Perforation Treatment Performed - Cement Plug
2013-09-29 Perforation Treatment Performed - Cement Squeeze
2013-09-29 Plug Back Performed
2014-08-09 Perforation Treatment Performed - Jet Perforation
2015-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-08-10 Plug Back Performed
2015-08-11 Perforation Treatment Performed - Abrasa-Jet Perforation
2015-08-11 Perforation Treatment Performed - Jet Perforation
2015-08-11 Perforation Treatment Performed - Remedial Casing
2015-08-11 Well Log Performed
2015-08-12 Perforation Treatment Performed - Cement Plug
2015-08-12 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-08 435.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-11 Cement Plug 435.00 484.00 0
2013-09-29 Cement Plug 289.90 340.50 0
2014-08-09 Perforation 314.50 316.00 20
2015-08-10 Packing Device Capped w/Cement 297.00 305.00 0
2015-08-11 Hydra Jet Perforation 239.00 239.50 0
2015-08-11 Perforation 238.50 239.50 20
2015-08-11 Remedial Casing Cementing 238.50 239.50 0
2015-08-12 Cement Plug 222.00 239.50 0
2011-11-07 Perforation 413.00 415.00 20
2011-11-07 Cement Squeeze 413.00 415.00 0
2011-11-07 Cement Plug 392.00 408.00 0
2011-11-07 Perforation 314.50 316.00 20
2011-11-07 Cement Squeeze 314.50 316.00 0
2011-11-07 Cement Plug 284.00 300.00 0
2013-09-28 Perforation 314.50 315.50 13
2013-09-29 Cement Squeeze 314.50 315.50 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-11-07 No Incident Encountered 0.00 0.00
2013-10-17 No Incident Encountered 0.00 0.00
2014-08-14 No Incident Encountered 0.00 0.00
2015-08-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References