If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424022514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.650614,"lon":-110.166078,"icon":""}]} |
Location: 00/14-25-042-02W4/0 | |
Location Alias: 00/14-25-42-02 W4M | |
Location Alias 2: 00/14-25-042-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 02 | |
Section: 25 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: TALISMAN CHAUVIN SOUTH 14-25-42-2 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0172832 | |
License Date: 1994-11-21 | |
License Status: Issued | |
Spud Date: 1994-12-09 | |
Final Drill Date: 1994-12-12 | |
Well Total Depth: 671.00 m | |
Surface Hole Latitude: 52.650614 | |
Surface Hole Longitude: -110.166078 |
Date | Event |
---|---|
1994-11-21 | Obtained License |
1994-12-10 | Surface Casing Operation Performed |
1994-12-12 | Finished Drilling |
1994-12-12 | Well Log Performed |
1994-12-12 | Well Mode changed to Drilled and Cased |
1994-12-13 | Drill Stem Test Performed |
1994-12-14 | Production Casing Operation Performed |
1994-12-14 | Rig Released |
1994-12-22 | Perforation Treatment Performed - Jet Perforation |
1994-12-22 | Well Log Performed |
1994-12-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-01-01 | Well Began Production |
1995-01-01 | Well Fluid changed to Crude Oil |
1995-01-01 | Well Mode changed to Pumping |
1995-04-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-04-20 | Perforation Treatment Performed - Jet Perforation |
1995-04-20 | Plug Back Performed |
1995-04-20 | Well Log Performed |
1995-06-10 | Well Fluid changed to Crude Oil |
1995-06-10 | Well Mode changed to Suspended |
1995-06-13 | Well Fluid changed to Crude Oil |
1995-06-13 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-12-22 | Perforation | 657.00 | 660.00 | 17 |
1994-12-29 | Acid Treatment | 657.00 | 660.00 | 0 |
1995-04-20 | Packing Device Capped w/Cement | 651.00 | 654.00 | 0 |
1995-04-20 | Perforation | 529.00 | 531.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 1735 | 0.0 | 0.0 | 0.0 |
For data sources see[5]