X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424022004000

Well Details

Well ID: 0424022004000
Loading map...
Location: 00/04-20-042-02W4/0
Location Alias: 00/04-20-42-02 W4M
Location Alias 2: 00/04-20-042-02 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 02
Section: 20
County/Municipality: Municipal District of Wainwright No. 61
Well Name: BP CHAUVS 4-20-42-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0075994
License Date: 1979-05-30
License Status: Suspension
Spud Date: 1979-07-05
Final Drill Date: 1979-07-14
Well Total Depth: 695.00 m
Surface Hole Latitude: 52.625386
Surface Hole Longitude: -110.266559

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-05-30 Obtained License
1979-07-14 Finished Drilling
1979-07-14 Well Mode changed to Drilled and Cased
1979-07-18 Production Casing Operation Performed
1979-08-28 Perforation Treatment Performed - Jet Perforation
1979-09-12 Well Began Production
1979-09-12 Well Fluid changed to Crude Oil
1979-09-12 Well Mode changed to Pumping
1980-04-01 Well Fluid changed to Crude Oil
1980-04-01 Well Mode changed to Suspended
1981-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-06-17 Plug Back Performed
1981-06-18 Perforation Treatment Performed - Jet Perforation
1981-06-18 Well Fluid changed to Crude Oil
1981-06-18 Well Mode changed to Abandoned Zone
1981-06-19 Perforation Treatment Performed - Jet Perforation
2002-08-07 Well Log Performed
2002-08-11 Perforation Treatment Performed - Jet Perforation
2002-08-11 Well Log Performed
2002-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-15 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-08-28 Perforation 651.00 652.00 14
1981-06-17 Packing Device Capped w/Cement 648.00 648.00 0
1981-06-18 Perforation 629.70 631.00 13
1981-06-19 Perforation 623.00 624.50 13
2002-08-11 Perforation 230.50 232.00 17
2002-08-15 Acid Treatment 230.50 232.00 0
2002-08-15 Remedial Casing Cementing 230.50 232.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 2064 0.0 0.0 0.0
1980 1344 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References