X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424021912000

Well Details

Well ID: 0424021912000
Loading map...
Location: 00/12-19-042-02W4/0
Location Alias: 00/12-19-42-02 W4M
Location Alias 2: 00/12-19-042-02 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 02
Section: 19
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TRIAD BP CRESTHILL 12-19-42-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0035743
License Date: 1969-02-04
License Status: Suspension
Spud Date: 1969-02-07
Final Drill Date: 1969-02-10
Well Total Depth: 665.10 m
Surface Hole Latitude: 52.632620
Surface Hole Longitude: -110.289588

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-02-04 Obtained License
1969-02-10 Finished Drilling
1969-02-10 Well Mode changed to Drilled and Cased
1969-02-11 Drill Stem Test Performed
1969-02-12 Drill Stem Test Performed
1969-02-12 Production Casing Operation Performed
1969-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-02-18 Perforation Treatment Performed - Jet Perforation
1969-02-18 Well Log Performed
1969-02-20 Well Began Production
1969-02-20 Well Fluid changed to Crude Oil
1969-02-20 Well Mode changed to Pumping
2001-07-13 Well Log Performed
2002-07-11 Perforation Treatment Performed - Jet Perforation
2002-07-25 Perforation Treatment Performed - Fractured
2002-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-09-11 Perforation Treatment Performed - Jet Perforation
2002-09-11 Well Log Performed
2002-09-18 Perforation Treatment Performed - Cement Squeeze
2018-02-15 Well Fluid changed to Crude Oil
2018-02-15 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-02-18 Perforation 636.40 639.50 7
1969-02-18 Acid Treatment 636.40 639.50 0
2002-07-11 Perforation 624.50 627.50 13
2002-07-11 Perforation 618.50 619.50 13
2002-07-25 Fracture 618.50 619.50 0
2002-07-25 Fracture 624.50 627.50 0
2002-09-11 Perforation 327.50 328.50 20
2002-09-11 Acid Treatment 327.50 328.50 0
2002-09-18 Cement Squeeze 327.50 328.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 5135 0.0 0.0 0.0
1970 5907 0.0 0.0 0.0
1971 6463 0.0 0.0 0.0
1972 8101 0.0 0.0 0.0
1973 8531 0.0 0.0 0.0
1974 8593 0.0 0.0 0.0
1975 8677 0.0 0.0 0.0
1976 8759 0.0 0.0 0.0
1977 8645 0.0 0.0 0.0
1978 8572 0.0 0.0 0.0
1979 8590 0.0 0.0 0.0
1980 8635 0.0 0.0 0.0
1981 8735 0.0 0.0 0.0
1982 8028 0.0 0.0 0.0
1983 8185 0.0 0.0 0.0
1984 8158 0.0 0.0 0.0
1985 8061 0.0 0.0 0.0
1986 453 0.0 0.0 0.0
1987 1403 0.0 0.0 0.0
1988 8618 0.0 0.0 0.0
1989 8556 0.0 0.0 0.0
1990 8656 0.0 0.0 0.0
1991 8111 0.0 0.0 0.0
1992 8337 0.0 0.0 0.0
1993 8625 0.0 0.0 0.0
1994 8693 0.0 0.0 0.0
1995 8688 0.0 0.0 0.0
1996 7762 0.0 0.0 0.0
1997 8302 0.0 0.0 0.0
1998 8423 0.0 0.0 0.0
1999 8436 0.0 0.0 0.0
2000 8291 0.0 0.0 0.0
2001 8642 0.0 0.0 0.0
2002 7754 0.0 0.0 0.0
2003 8354 0.0 0.0 0.0
2004 8175 0.0 0.0 0.0
2005 8529 0.0 0.0 0.0
2006 7676 0.0 0.0 0.0
2007 8466 0.0 0.0 0.0
2008 8226 0.0 0.0 0.0
2009 7924 0.0 0.0 0.0
2010 662 0.0 0.0 0.0
2012 804 0.0 0.0 0.0
2013 5878 0.0 0.0 0.0
2014 4151 0.0 0.0 0.0
2015 6939 0.0 0.0 0.0
2016 1016 0.0 0.0 0.0

For data sources see[5]

References