X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415093110002

Well Details

Well ID: 0415093110002
Loading map...
Location: 00/10-31-041-09W5/2
Location Alias: 00/10-31-41-09 W5M
Location Alias 2: 00/10-31-041-09 W5/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 09
Section: 31
County/Municipality: Clearwater County
Well Name: SUNCOR FERRIER 10-31-41-9
Operator Name: Suncor Energy Inc.
License Number: 0088564
License Date: 1981-01-27
License Status: RecCertified
Spud Date: 1981-02-26
Final Drill Date: 1981-04-15
Well Total Depth: 3015.00 m
Surface Hole Latitude: 52.576375
Surface Hole Longitude: -115.278982

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-01-27 Obtained License
1981-03-07 Lost Circulation Occurred
1981-03-21 Drill Stem Test Performed
1981-04-03 Kick Occurred
1981-04-15 Finished Drilling
1981-04-15 Well Log Performed
1981-04-15 Well Mode changed to Drilled and Cased
1981-04-17 Drill Stem Test Performed
1981-04-24 Production Casing Operation Performed
1981-04-26 Perforation Treatment Performed - Jet Perforation
1981-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-08-29 Perforation Treatment Performed - Jet Perforation
1981-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-09-03 Perforation Treatment Performed - Jet Perforation
1981-09-08 Perforation Treatment Performed - Fractured
1981-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-12-04 Perforation Treatment Performed - Jet Perforation
1981-12-05 Perforation Treatment Performed - Fractured
1982-01-01 Well Fluid changed to Crude Oil
1982-01-01 Well Mode changed to Potential
1982-02-01 Well Began Production
1982-02-01 Well Fluid changed to Crude Oil
1982-02-01 Well Mode changed to Flowing
1983-08-09 Well Fluid changed to Crude Oil
1983-08-09 Well Mode changed to Suspended
1988-05-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-05-19 Plug Back Performed
1988-05-19 Well Abandoned
1988-05-19 Well Fluid changed to Crude Oil
1988-05-19 Well Log Performed
1988-05-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-04-26 Perforation 2484.00 2494.00 7
1981-12-04 Perforation 1799.50 1803.00 7
1981-12-05 Fracture 1799.50 1803.00 0
1988-05-19 Packing Device Capped w/Cement 1782.00 1790.00 0
1981-08-25 Acid Treatment 2484.00 2494.00 0
1981-08-29 Perforation 2479.00 2484.00 7
1981-08-29 Perforation 2462.00 2471.00 7
1981-08-31 Acid Treatment 2462.00 2494.00 0
1981-09-03 Packing Device Capped w/Cement 2455.00 2455.00 0
1981-09-03 Perforation 2229.20 2234.10 7
1981-09-08 Fracture 2229.20 2234.10 0
1981-12-03 Packing Device Capped w/Cement 2225.00 2225.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2172 0.0 0.0 0.0
1983 1484 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-03-07 Lost Circulation 1090.00 1142.00
1981-04-03 Kick 2760.00 2760.00

For data sources see[6]

References