If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415073104000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.582369,"lon":-115.002882,"icon":""}]} |
Location: 00/04-31-041-07W5/0 | |
Location Alias: 00/04-31-41-07 W5M | |
Location Alias 2: 00/04-31-041-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 07 | |
Section: 31 | |
County/Municipality: Clearwater County | |
Well Name: ANDERSON HZ WILLGR 4-31-41-7 | |
Operator Name: InPlay Oil Corp. | |
License Number: 0435605 | |
License Date: 2011-07-28 | |
License Status: Amended | |
Spud Date: 2011-08-31 | |
Final Drill Date: 2011-09-11 | |
Well Total Depth: 3530.00 m | |
Surface Hole Latitude: 52.582369 | |
Surface Hole Longitude: -115.002882 |
Date | Event |
---|---|
2011-07-28 | Obtained License |
2011-09-02 | Surface Casing Operation Performed |
2011-09-04 | Direction Drilling Operation Performed - Horizontal |
2011-09-06 | Well Log Performed |
2011-09-11 | Finished Drilling |
2011-09-11 | Well Mode changed to Drilled and Cased |
2011-09-12 | Production Casing Operation Performed |
2011-09-13 | Rig Released |
2011-09-17 | Well Log Performed |
2011-09-20 | Perforation Treatment Performed - Jet Perforation |
2011-09-25 | Perforation Treatment Performed - Jet Perforation |
2011-09-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-25 | Well Log Performed |
2011-09-26 | Well Log Performed |
2011-10-01 | Well Began Production |
2011-10-01 | Well Fluid changed to Crude Oil |
2011-10-01 | Well Mode changed to Flowing |
2011-10-03 | Well Fluid changed to Crude Oil |
2011-10-03 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-04 | 1462.40 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-20 | Perforation | 3420.00 | 3420.50 | 3 |
2011-09-25 | Multi-Stage Fracture | 3340.00 | 3340.50 | 0 |
2011-09-25 | Multi-Stage Fracture | 3260.00 | 3260.50 | 0 |
2011-09-25 | Multi-Stage Fracture | 3180.00 | 3180.50 | 0 |
2011-09-25 | Multi-Stage Fracture | 3100.00 | 3100.50 | 0 |
2011-09-25 | Multi-Stage Fracture | 3020.00 | 3020.50 | 0 |
2011-09-25 | Multi-Stage Fracture | 2940.00 | 2940.50 | 0 |
2011-09-25 | Multi-Stage Fracture | 2860.00 | 2860.50 | 0 |
2011-09-25 | Perforation | 2710.00 | 2710.50 | 3 |
2011-09-25 | Perforation | 2630.00 | 2630.50 | 3 |
2011-09-25 | Perforation | 2550.00 | 2550.50 | 3 |
2011-09-20 | Perforation | 3340.00 | 3340.50 | 3 |
2011-09-25 | Perforation | 2470.00 | 2470.50 | 3 |
2011-09-25 | Perforation | 2390.00 | 2390.50 | 3 |
2011-09-25 | Perforation | 2310.00 | 2310.50 | 3 |
2011-09-25 | Perforation | 2230.00 | 2230.50 | 3 |
2011-09-25 | Multi-Stage Fracture | 2710.00 | 2710.50 | 0 |
2011-09-25 | Multi-Stage Fracture | 2630.00 | 2630.50 | 0 |
2011-09-25 | Multi-Stage Fracture | 2550.00 | 2550.50 | 0 |
2011-09-25 | Multi-Stage Fracture | 2470.00 | 2470.50 | 0 |
2011-09-25 | Multi-Stage Fracture | 2390.00 | 2390.50 | 0 |
2011-09-25 | Multi-Stage Fracture | 2310.00 | 2310.50 | 0 |
2011-09-20 | Perforation | 3260.00 | 3260.50 | 3 |
2011-09-25 | Multi-Stage Fracture | 2230.00 | 2230.50 | 0 |
2011-09-20 | Perforation | 3180.00 | 3180.50 | 3 |
2011-09-20 | Perforation | 3100.00 | 3100.50 | 3 |
2011-09-20 | Perforation | 3020.00 | 3020.50 | 3 |
2011-09-20 | Perforation | 2940.00 | 2940.50 | 3 |
2011-09-20 | Perforation | 2860.00 | 2860.50 | 3 |
2011-09-25 | Multi-Stage Fracture | 3420.00 | 3420.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 869 | 0.0 | 0.0 | 0.0 |
2012 | 8679 | 0.0 | 0.0 | 0.0 |
2013 | 8395 | 0.0 | 0.0 | 0.0 |
2014 | 8524 | 0.0 | 0.0 | 0.0 |
2015 | 6623 | 0.0 | 0.0 | 0.0 |
2016 | 7340 | 0.0 | 0.0 | 0.0 |
2017 | 8511 | 0.0 | 0.0 | 0.0 |
2018 | 7813 | 0.0 | 0.0 | 0.0 |
2019 | 7896 | 0.0 | 0.0 | 0.0 |
2020 | 1344 | 0.0 | 0.0 | 0.0 |
For data sources see[6]