X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415072907003

Well Details

Well ID: 0415072907003
Loading map...
Location: 00/07-29-041-07W5/3
Location Alias: 00/07-29-41-07 W5M
Location Alias 2: 00/07-29-041-07 W5/03
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 07
Section: 29
County/Municipality: Clearwater County
Well Name: PC WILLGR 7-29-41-7
Operator Name: Obsidian Energy Ltd.
License Number: 0089570
License Date: 1981-03-17
License Status: Issued
Spud Date: 1981-03-23
Final Drill Date: 1981-04-17
Well Total Depth: 2550.00 m
Surface Hole Latitude: 52.557287
Surface Hole Longitude: -114.969071

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-03-17 Obtained License
1981-03-23 Lost Circulation Occurred
1981-04-17 Finished Drilling
1981-04-17 Well Mode changed to Drilled and Cased
1981-04-19 Drill Stem Test Performed
1981-04-20 Drill Stem Test Performed
1981-04-22 Production Casing Operation Performed
1981-04-27 Perforation Treatment Performed - Fractured
1981-04-27 Perforation Treatment Performed - Jet Perforation
1981-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-06-17 Perforation Treatment Performed - Jet Perforation
1981-06-18 Perforation Treatment Performed - Fractured
1982-07-15 Perforation Treatment Performed - Cement Squeeze
1982-07-15 Plug Back Performed
1982-07-19 Perforation Treatment Performed - Jet Perforation
1982-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-07-21 Plug Back Performed
1982-07-23 Perforation Treatment Performed - Jet Perforation
1982-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-07-26 Plug Back Performed
1982-07-27 Perforation Treatment Performed - Jet Perforation
1982-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-06 Perforation Treatment Performed - Selective Jet Perforations
1982-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-09 Perforation Treatment Performed - Cement Squeeze
1982-08-13 Perforation Treatment Performed - Jet Perforation
1982-08-16 Perforation Treatment Performed - Acid Wash - No Pressure
1982-08-16 Plug Back Performed
1982-08-17 Perforation Treatment Performed - Fractured
1982-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-15 Perforation Treatment Performed - Jet Perforation
2000-11-15 Well Log Performed
2000-11-15 Well Mode changed to Drilled and Cased
2000-11-16 Well Log Performed
2000-11-19 Perforation Treatment Performed - Fractured
2003-11-06 Well Began Production
2003-11-06 Well Fluid changed to Crude Oil
2003-11-06 Well Mode changed to Pumping
2020-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-04-27 Perforation 2512.00 2516.00 13
1982-07-23 Perforation 2490.00 2494.00 13
1982-07-24 Acid Treatment 2481.00 2494.00 0
1982-07-26 Packing Device Capped w/Cement 2242.00 2250.00 0
1982-07-27 Perforation 2139.00 2156.00 13
1982-07-29 Acid Treatment 2139.00 2156.00 0
1982-08-04 Acid Treatment 2139.00 2156.00 0
1982-08-06 Selective Jet Perforations 2173.00 2173.00 0
1982-08-09 Acid Treatment 2173.00 2173.00 0
1982-08-09 Cement Squeeze 2139.00 2173.00 0
1982-08-13 Perforation 2142.00 2146.00 13
1981-04-27 Fracture 2512.00 2516.00 0
1982-08-13 Perforation 2150.00 2154.00 13
1982-08-16 Acid Wash 2142.00 2154.00 0
1982-08-17 Fracture 2142.00 2154.00 0
1982-08-26 Packing Device Capped w/Cement 2130.00 2137.00 0
2000-11-15 Perforation 1970.00 1976.00 17
2000-11-19 Fracture 1970.00 1976.00 0
2020-01-22 Acid Treatment 1970.00 1976.00 0
1981-06-16 Packing Device Capped w/Cement 2397.00 2400.00 0
1981-06-17 Perforation 2285.00 2289.00 13
1981-06-18 Fracture 2285.00 2289.00 0
1982-07-15 Cement Squeeze 2285.00 2289.00 0
1982-07-19 Perforation 2512.00 2516.00 13
1982-07-21 Packing Device Capped w/Cement 2497.00 2505.00 0
1982-07-23 Perforation 2481.00 2485.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1066 0.0 0.0 0.0
2004 8308 0.0 0.0 0.0
2005 8427 0.0 0.0 0.0
2006 8173 0.0 0.0 0.0
2007 8626 0.0 0.0 0.0
2008 8739 0.0 0.0 0.0
2009 8674 0.0 0.0 0.0
2010 8367 0.0 0.0 0.0
2011 8629 0.0 0.0 0.0
2012 8584 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8591 0.0 0.0 0.0
2015 8721 0.0 0.0 0.0
2016 6566 0.0 0.0 0.0
2017 7899 0.0 0.0 0.0
2018 7694 0.0 0.0 0.0
2019 7931 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-03-23 Lost Circulation 72.00 72.00
2020-01-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References