X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415072302000

Well Details

Well ID: 0415072302000
Loading map...
Location: 00/02-23-041-07W5/0
Location Alias: 00/02-23-41-07 W5M
Location Alias 2: 00/02-23-041-07 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 07
Section: 23
County/Municipality: Clearwater County
Well Name: YANGARRA HZ WILLGR 2-23-41-7
Operator Name: Yangarra Resources Corp.
License Number: 0489488
License Date: 2018-06-06
License Status: Issued
Spud Date: 2018-07-09
Final Drill Date: 2018-07-16
Well Total Depth: 3705.00 m
Surface Hole Latitude: 52.554980
Surface Hole Longitude: -114.893061

For data sources see[1][2]

Well History

Date Event
2018-06-06 Obtained License
2018-07-10 Surface Casing Operation Performed
2018-07-12 Direction Drilling Operation Performed - Deviate
2018-07-13 Direction Drilling Operation Performed - Horizontal
2018-07-16 Finished Drilling
2018-07-16 Well Log Performed
2018-07-16 Well Mode changed to Drilled and Cased
2018-07-17 Production Casing Operation Performed
2018-07-17 Rig Released
2018-08-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-01 Well Began Production
2018-09-01 Well Fluid changed to Crude Oil
2018-09-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-09 Trinidad Drilling Ltd. 42 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-12 1642.60 Deviate (5 - 79 degrees)
2018-07-13 2233.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-12 Multi-Stage Fracture 3658.50 3658.60 0
2018-08-13 Multi-Stage Fracture 3491.40 3491.50 0
2018-08-13 Multi-Stage Fracture 3472.80 3472.90 0
2018-08-13 Multi-Stage Fracture 3454.30 3454.40 0
2018-08-13 Multi-Stage Fracture 3436.40 3436.50 0
2018-08-13 Multi-Stage Fracture 3417.90 3418.00 0
2018-08-13 Multi-Stage Fracture 3399.30 3399.40 0
2018-08-13 Multi-Stage Fracture 3381.00 3381.10 0
2018-08-13 Multi-Stage Fracture 3362.40 3362.50 0
2018-08-13 Multi-Stage Fracture 3343.80 3343.90 0
2018-08-13 Multi-Stage Fracture 3325.20 3325.30 0
2018-08-13 Multi-Stage Fracture 3640.00 3640.10 0
2018-08-13 Multi-Stage Fracture 3306.60 3306.70 0
2018-08-13 Multi-Stage Fracture 3288.30 3288.40 0
2018-08-13 Multi-Stage Fracture 3269.90 3270.00 0
2018-08-13 Multi-Stage Fracture 3251.50 3251.60 0
2018-08-13 Multi-Stage Fracture 3232.90 3233.00 0
2018-08-13 Multi-Stage Fracture 3214.30 3214.40 0
2018-08-13 Multi-Stage Fracture 3195.70 3195.80 0
2018-08-13 Multi-Stage Fracture 3177.20 3177.30 0
2018-08-13 Multi-Stage Fracture 3158.70 3158.80 0
2018-08-13 Multi-Stage Fracture 3140.20 3140.30 0
2018-08-13 Multi-Stage Fracture 3621.40 3621.50 0
2018-08-13 Multi-Stage Fracture 3121.60 3121.70 0
2018-08-13 Multi-Stage Fracture 3103.00 3103.10 0
2018-08-13 Multi-Stage Fracture 3084.60 3084.70 0
2018-08-13 Multi-Stage Fracture 3066.00 3066.10 0
2018-08-13 Multi-Stage Fracture 3047.50 3047.60 0
2018-08-13 Multi-Stage Fracture 3028.90 3029.00 0
2018-08-13 Multi-Stage Fracture 3010.40 3010.50 0
2018-08-13 Multi-Stage Fracture 2991.80 2991.90 0
2018-08-13 Multi-Stage Fracture 2974.60 2974.70 0
2018-08-13 Multi-Stage Fracture 2956.10 2956.20 0
2018-08-13 Multi-Stage Fracture 3602.80 3602.90 0
2018-08-13 Multi-Stage Fracture 2937.50 2937.60 0
2018-08-14 Multi-Stage Fracture 2918.90 2919.00 0
2018-08-14 Multi-Stage Fracture 2900.40 2900.50 0
2018-08-14 Multi-Stage Fracture 2881.80 2881.90 0
2018-08-14 Multi-Stage Fracture 2863.50 2863.60 0
2018-08-14 Multi-Stage Fracture 2844.90 2845.00 0
2018-08-14 Multi-Stage Fracture 2827.90 2828.00 0
2018-08-14 Multi-Stage Fracture 2810.10 2810.20 0
2018-08-14 Multi-Stage Fracture 2791.50 2791.60 0
2018-08-14 Multi-Stage Fracture 2773.60 2773.70 0
2018-08-13 Multi-Stage Fracture 3584.30 3584.40 0
2018-08-14 Multi-Stage Fracture 2755.00 2755.10 0
2018-08-14 Multi-Stage Fracture 2736.50 2736.60 0
2018-08-14 Multi-Stage Fracture 2718.00 2718.10 0
2018-08-14 Multi-Stage Fracture 2700.50 2700.60 0
2018-08-14 Multi-Stage Fracture 2683.00 2683.10 0
2018-08-14 Multi-Stage Fracture 2665.40 2665.50 0
2018-08-14 Multi-Stage Fracture 2646.80 2646.90 0
2018-08-14 Multi-Stage Fracture 2628.30 2628.40 0
2018-08-14 Multi-Stage Fracture 2609.70 2609.80 0
2018-08-14 Multi-Stage Fracture 2591.20 2591.30 0
2018-08-13 Multi-Stage Fracture 3565.70 3565.80 0
2018-08-14 Multi-Stage Fracture 2574.00 2574.10 0
2018-08-14 Multi-Stage Fracture 2555.50 2555.60 0
2018-08-14 Multi-Stage Fracture 2537.30 2537.40 0
2018-08-14 Multi-Stage Fracture 2518.20 2518.30 0
2018-08-14 Multi-Stage Fracture 2500.10 2500.20 0
2018-08-14 Multi-Stage Fracture 2481.50 2481.60 0
2018-08-14 Multi-Stage Fracture 2462.90 2463.00 0
2018-08-14 Multi-Stage Fracture 2444.40 2444.50 0
2018-08-14 Multi-Stage Fracture 2425.90 2426.00 0
2018-08-15 Multi-Stage Fracture 2407.40 2407.50 0
2018-08-13 Multi-Stage Fracture 3547.10 3547.20 0
2018-08-15 Multi-Stage Fracture 2389.20 2389.30 0
2018-08-15 Multi-Stage Fracture 2370.70 2370.80 0
2018-08-15 Multi-Stage Fracture 2352.10 2352.20 0
2018-08-15 Multi-Stage Fracture 2333.40 2333.50 0
2018-08-15 Multi-Stage Fracture 2315.50 2315.60 0
2018-08-15 Multi-Stage Fracture 2297.70 2297.80 0
2018-08-15 Multi-Stage Fracture 2279.60 2279.70 0
2018-08-15 Multi-Stage Fracture 2261.10 2261.20 0
2018-08-13 Multi-Stage Fracture 3528.60 3528.70 0
2018-08-13 Multi-Stage Fracture 3509.90 3510.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-12 2018-08-15 2,023 8,464 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 83.5078 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 11.3107 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 4.9665 N/A
X-CIDE 450 BJ Services Bactericide/Biocide Glutaraldehyde 111-30-8 100 0.0106 N/A
Methanol 67-56-1 100 0.0106 N/A
Water 7732-18-5 100 0.0106 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.0566 N/A
Non-hazardous Not Available 100 0.0566 N/A
Water 7732-18-5 100 0.0566 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0501 N/A
Isopropanol 67-63-0 100 0.0501 N/A
Methanol 67-56-1 100 0.0501 N/A
ThinFrac MP BJ Services Friction Reducer Anionic terpolymer 12054 100 0.114 N/A
Oxyalkylated alcohol 12054 100 0.114 N/A
Petroleum distillates 64742-47-8 100 0.114 N/A
Sodium chloride 7647-14-5 100 0.114 N/A
Water 7732-18-5 100 0.114 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-12 2018-08-15 Surface Water - River 8237

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2812 0.0 0.0 0.0
2019 7437 0.0 0.0 0.0
2020 2019 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-17 No Incident Encountered 0.00 0.00
2018-08-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References