X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415063214000

Well Details

Well ID: 0415063214000
Loading map...
Location: 00/14-32-041-06W5/0
Location Alias: 00/14-32-41-06 W5M
Location Alias 2: 00/14-32-041-06 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 06
Section: 32
County/Municipality: Clearwater County
Well Name: ESSO ALHAMBRA 14-32-41-6
Operator Name: Imperial Oil Resources Limited
License Number: 0020406
License Date: 1961-02-10
License Status: RecCertified
Spud Date: 1961-02-11
Final Drill Date: 1961-02-23
Well Total Depth: 2008.60 m
Surface Hole Latitude: 52.579430
Surface Hole Longitude: -114.832100

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-02-10 Obtained License
1961-02-23 Finished Drilling
1961-02-23 Production Casing Operation Performed
1961-02-23 Well Mode changed to Drilled and Cased
1961-03-20 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-03-21 Perforation Treatment Performed - Fractured
1961-05-01 Well Began Production
1961-05-01 Well Fluid changed to Crude Oil
1961-05-01 Well Mode changed to Flowing
1961-06-06 Well Fluid changed to Crude Oil
1961-06-06 Well Mode changed to Pumping
1962-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-03-19 Perforation Treatment Performed - Fractured
1962-03-19 Perforation Treatment Performed - Jet Perforation
1969-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-04-01 Perforation Treatment Performed - Fractured
1992-11-17 Well Fluid changed to Crude Oil
1992-11-17 Well Mode changed to Suspended
1994-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-08 Perforation Treatment Performed - Jet Perforation
1994-11-08 Plug Back Performed
1994-11-08 Well Log Performed
1994-12-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-12-23 Perforation Treatment Performed - Remedial Casing
1994-12-23 Well Fluid changed to Crude Oil
1994-12-23 Well Mode changed to Abandoned
1995-04-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-03-20 Hydra Jet Perforation 1988.50 1990.00 0
1994-11-08 Perforation 557.00 558.00 14
1994-12-23 Remedial Casing Cementing 557.00 558.00 0
1994-12-23 Packing Device Capped w/Cement 234.00 560.00 0
1961-03-21 Fracture 1988.50 1990.00 0
1962-03-19 Perforation 1986.70 1987.60 13
1962-03-19 Acid Treatment 1986.70 1987.60 0
1962-03-19 Fracture 1986.70 1987.60 0
1969-06-10 Acid Treatment 1986.70 1987.60 0
1970-04-01 Acid Treatment 1986.70 1987.60 0
1970-04-01 Fracture 1986.70 1987.60 0
1994-11-08 Packing Device Capped w/Cement 1971.00 1979.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8079 0.0 0.0 0.0
1968 8711 0.0 0.0 0.0
1969 7761 0.0 0.0 0.0
1970 7124 0.0 0.0 0.0
1971 2860 0.0 0.0 0.0
1972 8373 0.0 0.0 0.0
1973 8376 0.0 0.0 0.0
1974 7943 0.0 0.0 0.0
1975 8573 0.0 0.0 0.0
1976 8399 0.0 0.0 0.0
1977 7374 0.0 0.0 0.0
1978 8572 0.0 0.0 0.0
1979 7379 0.0 0.0 0.0
1980 4230 0.0 0.0 0.0
1981 6166 0.0 0.0 0.0
1982 6680 0.0 0.0 0.0
1983 8015 0.0 0.0 0.0
1984 8219 0.0 0.0 0.0
1985 7241 0.0 0.0 0.0
1986 8207 0.0 0.0 0.0
1987 6351 0.0 0.0 0.0
1988 6602 0.0 0.0 0.0
1989 8592 0.0 0.0 0.0
1990 8278 0.0 0.0 0.0
1991 3591 0.0 0.0 0.0

For data sources see[5]

References