If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415062614020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.543246,"lon":-114.762535,"icon":""}]} |
Location: 02/14-26-041-06W5/0 | |
Location Alias: 02/14-26-41-06 W5M | |
Location Alias 2: 02/14-26-041-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 06 | |
Section: 26 | |
County/Municipality: Clearwater County | |
Well Name: INPLAY OIL 102 HZ WILLGR 14-26-41-6 | |
Operator Name: InPlay Oil Corp. | |
License Number: 0492819 | |
License Date: 2018-12-17 | |
License Status: Issued | |
Spud Date: 2019-06-01 | |
Final Drill Date: 2019-06-08 | |
Well Total Depth: 4274.00 m | |
Surface Hole Latitude: 52.543246 | |
Surface Hole Longitude: -114.762535 |
Date | Event |
---|---|
2018-12-17 | Obtained License |
2019-06-01 | Drill To LD |
2019-06-02 | Surface Casing Operation Performed |
2019-06-04 | Direction Drilling Operation Performed - Deviate |
2019-06-05 | Direction Drilling Operation Performed - Horizontal |
2019-06-08 | Finished Drilling |
2019-06-08 | Well Mode changed to Drilled and Cased |
2019-06-09 | Well Log Performed |
2019-06-10 | Production Casing Operation Performed |
2019-06-10 | Rig Released |
2019-07-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-27 | Well Began Production |
2019-07-27 | Well Fluid changed to Crude Oil |
2019-07-27 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-06-01 | Ironhand Drilling Inc. | 9 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-06-04 | 1584.50 | Deviate (5 - 79 degrees) |
2019-06-05 | 2024.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-07-15 | Multi-Stage Fracture | 4272.50 | 4273.00 | 0 |
2019-07-16 | Multi-Stage Fracture | 3982.00 | 3983.90 | 0 |
2019-07-16 | Multi-Stage Fracture | 3950.00 | 3951.90 | 0 |
2019-07-16 | Multi-Stage Fracture | 3918.00 | 3919.90 | 0 |
2019-07-16 | Multi-Stage Fracture | 3886.30 | 3888.20 | 0 |
2019-07-16 | Multi-Stage Fracture | 3854.20 | 3856.10 | 0 |
2019-07-16 | Multi-Stage Fracture | 3822.40 | 3824.30 | 0 |
2019-07-16 | Multi-Stage Fracture | 3790.90 | 3792.80 | 0 |
2019-07-16 | Multi-Stage Fracture | 3759.00 | 3760.90 | 0 |
2019-07-16 | Multi-Stage Fracture | 3729.40 | 3731.30 | 0 |
2019-07-16 | Multi-Stage Fracture | 3699.60 | 3701.50 | 0 |
2019-07-16 | Multi-Stage Fracture | 4232.10 | 4234.00 | 0 |
2019-07-16 | Multi-Stage Fracture | 3668.40 | 3670.30 | 0 |
2019-07-16 | Multi-Stage Fracture | 3636.90 | 3638.80 | 0 |
2019-07-16 | Multi-Stage Fracture | 3605.50 | 3607.50 | 0 |
2019-07-16 | Multi-Stage Fracture | 3574.10 | 3576.00 | 0 |
2019-07-16 | Multi-Stage Fracture | 3542.90 | 3544.80 | 0 |
2019-07-16 | Multi-Stage Fracture | 3512.50 | 3514.40 | 0 |
2019-07-16 | Multi-Stage Fracture | 3480.80 | 3482.70 | 0 |
2019-07-16 | Multi-Stage Fracture | 3448.80 | 3450.70 | 0 |
2019-07-17 | Multi-Stage Fracture | 3417.30 | 3419.20 | 0 |
2019-07-17 | Multi-Stage Fracture | 3385.30 | 3387.20 | 0 |
2019-07-16 | Multi-Stage Fracture | 4202.50 | 4204.40 | 0 |
2019-07-17 | Multi-Stage Fracture | 3354.20 | 3356.10 | 0 |
2019-07-17 | Multi-Stage Fracture | 3323.80 | 3325.70 | 0 |
2019-07-17 | Multi-Stage Fracture | 3292.40 | 3294.30 | 0 |
2019-07-17 | Multi-Stage Fracture | 3261.50 | 3263.40 | 0 |
2019-07-17 | Multi-Stage Fracture | 3230.90 | 3232.80 | 0 |
2019-07-17 | Multi-Stage Fracture | 3199.80 | 3201.70 | 0 |
2019-07-17 | Multi-Stage Fracture | 3167.90 | 3169.80 | 0 |
2019-07-17 | Multi-Stage Fracture | 3136.50 | 3138.40 | 0 |
2019-07-17 | Multi-Stage Fracture | 3105.40 | 3107.30 | 0 |
2019-07-17 | Multi-Stage Fracture | 3073.90 | 3075.80 | 0 |
2019-07-16 | Multi-Stage Fracture | 4170.50 | 4172.40 | 0 |
2019-07-17 | Multi-Stage Fracture | 3042.40 | 3044.30 | 0 |
2019-07-17 | Multi-Stage Fracture | 3011.30 | 3013.20 | 0 |
2019-07-17 | Multi-Stage Fracture | 2980.70 | 2982.60 | 0 |
2019-07-17 | Multi-Stage Fracture | 2948.90 | 2950.80 | 0 |
2019-07-17 | Multi-Stage Fracture | 2918.30 | 2920.20 | 0 |
2019-07-17 | Multi-Stage Fracture | 2887.40 | 2889.30 | 0 |
2019-07-17 | Multi-Stage Fracture | 2855.50 | 2857.40 | 0 |
2019-07-17 | Multi-Stage Fracture | 2824.30 | 2826.20 | 0 |
2019-07-17 | Multi-Stage Fracture | 2794.10 | 2796.00 | 0 |
2019-07-17 | Multi-Stage Fracture | 2764.60 | 2766.50 | 0 |
2019-07-16 | Multi-Stage Fracture | 4139.00 | 4140.90 | 0 |
2019-07-17 | Multi-Stage Fracture | 2733.60 | 2735.50 | 0 |
2019-07-18 | Multi-Stage Fracture | 2702.70 | 2704.60 | 0 |
2019-07-18 | Multi-Stage Fracture | 2671.80 | 2673.70 | 0 |
2019-07-18 | Multi-Stage Fracture | 2642.20 | 2644.10 | 0 |
2019-07-18 | Multi-Stage Fracture | 2611.00 | 2613.00 | 0 |
2019-07-18 | Multi-Stage Fracture | 2580.80 | 2582.70 | 0 |
2019-07-18 | Multi-Stage Fracture | 2550.60 | 2552.50 | 0 |
2019-07-18 | Multi-Stage Fracture | 2518.60 | 2520.50 | 0 |
2019-07-18 | Multi-Stage Fracture | 2488.40 | 2490.30 | 0 |
2019-07-18 | Multi-Stage Fracture | 2456.80 | 2458.70 | 0 |
2019-07-16 | Multi-Stage Fracture | 4108.30 | 4110.30 | 0 |
2019-07-18 | Multi-Stage Fracture | 2424.90 | 2426.80 | 0 |
2019-07-18 | Multi-Stage Fracture | 2392.90 | 2394.80 | 0 |
2019-07-18 | Multi-Stage Fracture | 2361.30 | 2363.20 | 0 |
2019-07-18 | Multi-Stage Fracture | 2330.30 | 2332.20 | 0 |
2019-07-18 | Multi-Stage Fracture | 2298.70 | 2300.60 | 0 |
2019-07-18 | Multi-Stage Fracture | 2267.50 | 2269.40 | 0 |
2019-07-18 | Multi-Stage Fracture | 2235.50 | 2237.40 | 0 |
2019-07-18 | Multi-Stage Fracture | 2203.60 | 2205.50 | 0 |
2019-07-18 | Multi-Stage Fracture | 2172.10 | 2174.00 | 0 |
2019-07-18 | Multi-Stage Fracture | 2140.20 | 2142.10 | 0 |
2019-07-16 | Multi-Stage Fracture | 4076.70 | 4078.60 | 0 |
2019-07-18 | Multi-Stage Fracture | 2111.50 | 2113.40 | 0 |
2019-07-18 | Multi-Stage Fracture | 2079.80 | 2081.70 | 0 |
2019-07-16 | Multi-Stage Fracture | 4045.20 | 4047.10 | 0 |
2019-07-16 | Multi-Stage Fracture | 4014.00 | 4015.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-07-15 | 2019-07-18 | 1,898 | 7,814 | N/A |
2 | 2019-07-16 | 2019-07-18 | 1,898 | 0 | N/A |
3 | 2019-07-17 | 2019-07-18 | 1,898 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid | 7647-01-0 | 100 | 0.4637 | N/A | |||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.4623 | N/A | ||||
Water | 7732-18-5 | 100 | 94.9798 | N/A | ||||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 3.3913 | N/A | ||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0005 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0083 | N/A | ||||
Unicide B100 | Kemko | Bactericide/Biocide | 2-BROMO-2-NITROPROPANE-1.3-DIOL - 99% | 52-51-7 | 100 | 0.0352 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0352 | N/A | ||||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0856 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0856 | N/A | ||||
ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.0364 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0364 | N/A | ||||
USC-100 | Kemko | Scale Inhibitor | Methanol | 67-56-1 | 100 | 0.0264 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0264 | N/A | ||||
ELESurf-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0863 | N/A | |
Methanol | 67-56-1 | 100 | 0.0863 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0863 | N/A | ||||
2 | 20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.726 | N/A | |
3 | HCL Acid | Element | Acid | 2-Propanol | 67-63-0 | 100 | 0.892 | N/A |
Hydrochloric Acid | 7647-01-0 | 100 | 0.5947 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-07-16 | 2019-07-20 | Surface Water - Runoff | 6421 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 3673 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-06-10 | No Incident Encountered | 0.00 | 0.00 |
2019-07-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]