X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415062614020

Well Details

Well ID: 0415062614020
Loading map...
Location: 02/14-26-041-06W5/0
Location Alias: 02/14-26-41-06 W5M
Location Alias 2: 02/14-26-041-06 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 06
Section: 26
County/Municipality: Clearwater County
Well Name: INPLAY OIL 102 HZ WILLGR 14-26-41-6
Operator Name: InPlay Oil Corp.
License Number: 0492819
License Date: 2018-12-17
License Status: Issued
Spud Date: 2019-06-01
Final Drill Date: 2019-06-08
Well Total Depth: 4274.00 m
Surface Hole Latitude: 52.543246
Surface Hole Longitude: -114.762535

For data sources see[1][2]

Well History

Date Event
2018-12-17 Obtained License
2019-06-01 Drill To LD
2019-06-02 Surface Casing Operation Performed
2019-06-04 Direction Drilling Operation Performed - Deviate
2019-06-05 Direction Drilling Operation Performed - Horizontal
2019-06-08 Finished Drilling
2019-06-08 Well Mode changed to Drilled and Cased
2019-06-09 Well Log Performed
2019-06-10 Production Casing Operation Performed
2019-06-10 Rig Released
2019-07-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-27 Well Began Production
2019-07-27 Well Fluid changed to Crude Oil
2019-07-27 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-06-01 Ironhand Drilling Inc. 9 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-06-04 1584.50 Deviate (5 - 79 degrees)
2019-06-05 2024.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-07-15 Multi-Stage Fracture 4272.50 4273.00 0
2019-07-16 Multi-Stage Fracture 3982.00 3983.90 0
2019-07-16 Multi-Stage Fracture 3950.00 3951.90 0
2019-07-16 Multi-Stage Fracture 3918.00 3919.90 0
2019-07-16 Multi-Stage Fracture 3886.30 3888.20 0
2019-07-16 Multi-Stage Fracture 3854.20 3856.10 0
2019-07-16 Multi-Stage Fracture 3822.40 3824.30 0
2019-07-16 Multi-Stage Fracture 3790.90 3792.80 0
2019-07-16 Multi-Stage Fracture 3759.00 3760.90 0
2019-07-16 Multi-Stage Fracture 3729.40 3731.30 0
2019-07-16 Multi-Stage Fracture 3699.60 3701.50 0
2019-07-16 Multi-Stage Fracture 4232.10 4234.00 0
2019-07-16 Multi-Stage Fracture 3668.40 3670.30 0
2019-07-16 Multi-Stage Fracture 3636.90 3638.80 0
2019-07-16 Multi-Stage Fracture 3605.50 3607.50 0
2019-07-16 Multi-Stage Fracture 3574.10 3576.00 0
2019-07-16 Multi-Stage Fracture 3542.90 3544.80 0
2019-07-16 Multi-Stage Fracture 3512.50 3514.40 0
2019-07-16 Multi-Stage Fracture 3480.80 3482.70 0
2019-07-16 Multi-Stage Fracture 3448.80 3450.70 0
2019-07-17 Multi-Stage Fracture 3417.30 3419.20 0
2019-07-17 Multi-Stage Fracture 3385.30 3387.20 0
2019-07-16 Multi-Stage Fracture 4202.50 4204.40 0
2019-07-17 Multi-Stage Fracture 3354.20 3356.10 0
2019-07-17 Multi-Stage Fracture 3323.80 3325.70 0
2019-07-17 Multi-Stage Fracture 3292.40 3294.30 0
2019-07-17 Multi-Stage Fracture 3261.50 3263.40 0
2019-07-17 Multi-Stage Fracture 3230.90 3232.80 0
2019-07-17 Multi-Stage Fracture 3199.80 3201.70 0
2019-07-17 Multi-Stage Fracture 3167.90 3169.80 0
2019-07-17 Multi-Stage Fracture 3136.50 3138.40 0
2019-07-17 Multi-Stage Fracture 3105.40 3107.30 0
2019-07-17 Multi-Stage Fracture 3073.90 3075.80 0
2019-07-16 Multi-Stage Fracture 4170.50 4172.40 0
2019-07-17 Multi-Stage Fracture 3042.40 3044.30 0
2019-07-17 Multi-Stage Fracture 3011.30 3013.20 0
2019-07-17 Multi-Stage Fracture 2980.70 2982.60 0
2019-07-17 Multi-Stage Fracture 2948.90 2950.80 0
2019-07-17 Multi-Stage Fracture 2918.30 2920.20 0
2019-07-17 Multi-Stage Fracture 2887.40 2889.30 0
2019-07-17 Multi-Stage Fracture 2855.50 2857.40 0
2019-07-17 Multi-Stage Fracture 2824.30 2826.20 0
2019-07-17 Multi-Stage Fracture 2794.10 2796.00 0
2019-07-17 Multi-Stage Fracture 2764.60 2766.50 0
2019-07-16 Multi-Stage Fracture 4139.00 4140.90 0
2019-07-17 Multi-Stage Fracture 2733.60 2735.50 0
2019-07-18 Multi-Stage Fracture 2702.70 2704.60 0
2019-07-18 Multi-Stage Fracture 2671.80 2673.70 0
2019-07-18 Multi-Stage Fracture 2642.20 2644.10 0
2019-07-18 Multi-Stage Fracture 2611.00 2613.00 0
2019-07-18 Multi-Stage Fracture 2580.80 2582.70 0
2019-07-18 Multi-Stage Fracture 2550.60 2552.50 0
2019-07-18 Multi-Stage Fracture 2518.60 2520.50 0
2019-07-18 Multi-Stage Fracture 2488.40 2490.30 0
2019-07-18 Multi-Stage Fracture 2456.80 2458.70 0
2019-07-16 Multi-Stage Fracture 4108.30 4110.30 0
2019-07-18 Multi-Stage Fracture 2424.90 2426.80 0
2019-07-18 Multi-Stage Fracture 2392.90 2394.80 0
2019-07-18 Multi-Stage Fracture 2361.30 2363.20 0
2019-07-18 Multi-Stage Fracture 2330.30 2332.20 0
2019-07-18 Multi-Stage Fracture 2298.70 2300.60 0
2019-07-18 Multi-Stage Fracture 2267.50 2269.40 0
2019-07-18 Multi-Stage Fracture 2235.50 2237.40 0
2019-07-18 Multi-Stage Fracture 2203.60 2205.50 0
2019-07-18 Multi-Stage Fracture 2172.10 2174.00 0
2019-07-18 Multi-Stage Fracture 2140.20 2142.10 0
2019-07-16 Multi-Stage Fracture 4076.70 4078.60 0
2019-07-18 Multi-Stage Fracture 2111.50 2113.40 0
2019-07-18 Multi-Stage Fracture 2079.80 2081.70 0
2019-07-16 Multi-Stage Fracture 4045.20 4047.10 0
2019-07-16 Multi-Stage Fracture 4014.00 4015.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-07-15 2019-07-18 1,898 7,814 N/A
2 2019-07-16 2019-07-18 1,898 0 N/A
3 2019-07-17 2019-07-18 1,898 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid 7647-01-0 100 0.4637 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.4623 N/A
Water 7732-18-5 100 94.9798 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 3.3913 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0005 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0083 N/A
Unicide B100 Kemko Bactericide/Biocide 2-BROMO-2-NITROPROPANE-1.3-DIOL - 99% 52-51-7 100 0.0352 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0352 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0856 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0856 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.0364 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0364 N/A
USC-100 Kemko Scale Inhibitor Methanol 67-56-1 100 0.0264 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0264 N/A
ELESurf-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0863 N/A
Methanol 67-56-1 100 0.0863 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0863 N/A
2 20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 1.726 N/A
3 HCL Acid Element Acid 2-Propanol 67-63-0 100 0.892 N/A
Hydrochloric Acid 7647-01-0 100 0.5947 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-07-16 2019-07-20 Surface Water - Runoff 6421

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 3673 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-06-10 No Incident Encountered 0.00 0.00
2019-07-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References