If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415062613020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.543246,"lon":-114.76283,"icon":""}]} |
Location: 02/13-26-041-06W5/0 | |
Location Alias: 02/13-26-41-06 W5M | |
Location Alias 2: 02/13-26-041-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 06 | |
Section: 26 | |
County/Municipality: Clearwater County | |
Well Name: INPLAY OIL 102 HZ WILLGR 13-26-41-6 | |
Operator Name: InPlay Oil Corp. | |
License Number: 0492818 | |
License Date: 2018-12-17 | |
License Status: Issued | |
Spud Date: 2019-02-01 | |
Final Drill Date: 2019-02-10 | |
Well Total Depth: 4328.70 m | |
Surface Hole Latitude: 52.543246 | |
Surface Hole Longitude: -114.762830 |
Date | Event |
---|---|
2018-12-17 | Obtained License |
2019-02-03 | Surface Casing Operation Performed |
2019-02-04 | Direction Drilling Operation Performed - Deviate |
2019-02-06 | Direction Drilling Operation Performed - Horizontal |
2019-02-10 | Finished Drilling |
2019-02-10 | Well Mode changed to Drilled and Cased |
2019-02-11 | Production Casing Operation Performed |
2019-02-11 | Well Log Performed |
2019-02-12 | Rig Released |
2019-03-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-10 | Well Log Performed |
2019-03-12 | Well Began Production |
2019-03-12 | Well Fluid changed to Crude Oil |
2019-03-12 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-02-01 | Ironhand Drilling Inc. | 9 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-02-04 | 1546.20 | Deviate (5 - 79 degrees) |
2019-02-06 | 2024.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-03-06 | Multi-Stage Fracture | 4298.10 | 4298.70 | 0 |
2019-03-07 | Multi-Stage Fracture | 4041.10 | 4043.00 | 0 |
2019-03-07 | Multi-Stage Fracture | 4010.40 | 4012.30 | 0 |
2019-03-07 | Multi-Stage Fracture | 3980.10 | 3982.00 | 0 |
2019-03-07 | Multi-Stage Fracture | 3949.60 | 3951.50 | 0 |
2019-03-07 | Multi-Stage Fracture | 3919.20 | 3921.20 | 0 |
2019-03-07 | Multi-Stage Fracture | 3888.90 | 3890.80 | 0 |
2019-03-07 | Multi-Stage Fracture | 3858.60 | 3860.50 | 0 |
2019-03-07 | Multi-Stage Fracture | 3829.60 | 3831.50 | 0 |
2019-03-07 | Multi-Stage Fracture | 3799.00 | 3800.90 | 0 |
2019-03-07 | Multi-Stage Fracture | 3768.40 | 3770.30 | 0 |
2019-03-07 | Multi-Stage Fracture | 4281.70 | 4283.60 | 0 |
2019-03-07 | Multi-Stage Fracture | 3738.40 | 3740.30 | 0 |
2019-03-07 | Multi-Stage Fracture | 3708.80 | 3710.70 | 0 |
2019-03-07 | Multi-Stage Fracture | 3678.30 | 3680.20 | 0 |
2019-03-07 | Multi-Stage Fracture | 3648.40 | 3650.30 | 0 |
2019-03-07 | Multi-Stage Fracture | 3619.80 | 3621.70 | 0 |
2019-03-07 | Multi-Stage Fracture | 3589.10 | 3591.10 | 0 |
2019-03-07 | Multi-Stage Fracture | 3559.50 | 3561.50 | 0 |
2019-03-07 | Multi-Stage Fracture | 3529.10 | 3531.00 | 0 |
2019-03-07 | Multi-Stage Fracture | 3498.50 | 3500.40 | 0 |
2019-03-07 | Multi-Stage Fracture | 3468.30 | 3470.20 | 0 |
2019-03-07 | Multi-Stage Fracture | 4251.50 | 4253.40 | 0 |
2019-03-07 | Multi-Stage Fracture | 3437.20 | 3439.10 | 0 |
2019-03-07 | Multi-Stage Fracture | 3406.10 | 3408.00 | 0 |
2019-03-07 | Multi-Stage Fracture | 3374.80 | 3376.60 | 0 |
2019-03-07 | Multi-Stage Fracture | 3343.30 | 3345.20 | 0 |
2019-03-07 | Multi-Stage Fracture | 3311.70 | 3313.60 | 0 |
2019-03-07 | Multi-Stage Fracture | 3279.80 | 3281.70 | 0 |
2019-03-07 | Multi-Stage Fracture | 3248.50 | 3250.40 | 0 |
2019-03-07 | Multi-Stage Fracture | 3216.60 | 3218.60 | 0 |
2019-03-07 | Multi-Stage Fracture | 3185.10 | 3187.00 | 0 |
2019-03-07 | Multi-Stage Fracture | 3153.60 | 3155.50 | 0 |
2019-03-07 | Multi-Stage Fracture | 4220.20 | 4222.10 | 0 |
2019-03-07 | Multi-Stage Fracture | 3122.90 | 3124.90 | 0 |
2019-03-07 | Multi-Stage Fracture | 3091.70 | 3093.60 | 0 |
2019-03-08 | Multi-Stage Fracture | 3060.30 | 3062.20 | 0 |
2019-03-08 | Multi-Stage Fracture | 3030.30 | 3032.30 | 0 |
2019-03-08 | Multi-Stage Fracture | 2999.90 | 3001.80 | 0 |
2019-03-08 | Multi-Stage Fracture | 2970.20 | 2972.10 | 0 |
2019-03-08 | Multi-Stage Fracture | 2939.00 | 2940.90 | 0 |
2019-03-08 | Multi-Stage Fracture | 2907.60 | 2909.50 | 0 |
2019-03-08 | Multi-Stage Fracture | 2876.40 | 2878.30 | 0 |
2019-03-08 | Multi-Stage Fracture | 2844.50 | 2846.40 | 0 |
2019-03-07 | Multi-Stage Fracture | 4191.80 | 4193.70 | 0 |
2019-03-08 | Multi-Stage Fracture | 2813.30 | 2815.20 | 0 |
2019-03-08 | Multi-Stage Fracture | 2783.30 | 2785.20 | 0 |
2019-03-08 | Multi-Stage Fracture | 2754.00 | 2755.90 | 0 |
2019-03-08 | Multi-Stage Fracture | 2724.30 | 2726.20 | 0 |
2019-03-08 | Multi-Stage Fracture | 2694.80 | 2696.70 | 0 |
2019-03-08 | Multi-Stage Fracture | 2664.20 | 2666.20 | 0 |
2019-03-08 | Multi-Stage Fracture | 2634.40 | 2636.30 | 0 |
2019-03-08 | Multi-Stage Fracture | 2604.30 | 2606.20 | 0 |
2019-03-08 | Multi-Stage Fracture | 2573.20 | 2575.10 | 0 |
2019-03-08 | Multi-Stage Fracture | 2542.90 | 2544.80 | 0 |
2019-03-07 | Multi-Stage Fracture | 4161.80 | 4163.70 | 0 |
2019-03-08 | Multi-Stage Fracture | 2513.00 | 2514.90 | 0 |
2019-03-08 | Multi-Stage Fracture | 2484.20 | 2486.10 | 0 |
2019-03-08 | Multi-Stage Fracture | 2455.20 | 2457.10 | 0 |
2019-03-08 | Multi-Stage Fracture | 2424.80 | 2426.70 | 0 |
2019-03-08 | Multi-Stage Fracture | 2394.10 | 2396.00 | 0 |
2019-03-08 | Multi-Stage Fracture | 2363.40 | 2365.30 | 0 |
2019-03-08 | Multi-Stage Fracture | 2333.20 | 2335.20 | 0 |
2019-03-08 | Multi-Stage Fracture | 2302.40 | 2304.40 | 0 |
2019-03-08 | Multi-Stage Fracture | 2273.10 | 2275.00 | 0 |
2019-03-08 | Multi-Stage Fracture | 2243.50 | 2245.50 | 0 |
2019-03-07 | Multi-Stage Fracture | 4132.80 | 4134.70 | 0 |
2019-03-08 | Multi-Stage Fracture | 2214.30 | 2216.20 | 0 |
2019-03-08 | Multi-Stage Fracture | 2183.60 | 2185.50 | 0 |
2019-03-08 | Multi-Stage Fracture | 2152.50 | 2154.40 | 0 |
2019-03-08 | Multi-Stage Fracture | 2121.90 | 2123.80 | 0 |
2019-03-07 | Multi-Stage Fracture | 4101.30 | 4103.20 | 0 |
2019-03-07 | Multi-Stage Fracture | 4071.50 | 4073.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-03-06 | 2019-03-08 | 1,903 | 6,543 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid | 7647-01-0 | 100 | 0.6081 | N/A | |||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.605 | N/A | ||||
Water | 7732-18-5 | 100 | 94.1283 | N/A | ||||
20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.9844 | N/A | ||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 3.9688 | N/A | ||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0115 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0115 | N/A | ||||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.1012 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.1012 | N/A | ||||
ELEFR-3A | Element | Friction Reducer | Non-hazardous Ingredients | Not Available | 100 | 0.0565 | N/A | |
Tergitol 15-S-20 | 68131-40-8 | 100 | 0.0565 | N/A | ||||
ELESurf-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0934 | N/A | |
Methanol | 67-56-1 | 100 | 0.0934 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0934 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-02-23 | 2019-02-26 | Surface Water - Runoff | 677 |
2019-02-27 | 2019-03-04 | Surface Water - Runoff | 7992 |
2019-03-04 | 2019-03-05 | Surface Water - Runoff | 1428 |
2019-03-08 | 2019-03-08 | Surface Water - Runoff | 1404 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 6732 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-02-12 | No Incident Encountered | 0.00 | 0.00 |
2019-03-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]