X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415062613020

Well Details

Well ID: 0415062613020
Loading map...
Location: 02/13-26-041-06W5/0
Location Alias: 02/13-26-41-06 W5M
Location Alias 2: 02/13-26-041-06 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 06
Section: 26
County/Municipality: Clearwater County
Well Name: INPLAY OIL 102 HZ WILLGR 13-26-41-6
Operator Name: InPlay Oil Corp.
License Number: 0492818
License Date: 2018-12-17
License Status: Issued
Spud Date: 2019-02-01
Final Drill Date: 2019-02-10
Well Total Depth: 4328.70 m
Surface Hole Latitude: 52.543246
Surface Hole Longitude: -114.762830

For data sources see[1][2]

Well History

Date Event
2018-12-17 Obtained License
2019-02-03 Surface Casing Operation Performed
2019-02-04 Direction Drilling Operation Performed - Deviate
2019-02-06 Direction Drilling Operation Performed - Horizontal
2019-02-10 Finished Drilling
2019-02-10 Well Mode changed to Drilled and Cased
2019-02-11 Production Casing Operation Performed
2019-02-11 Well Log Performed
2019-02-12 Rig Released
2019-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-10 Well Log Performed
2019-03-12 Well Began Production
2019-03-12 Well Fluid changed to Crude Oil
2019-03-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-02-01 Ironhand Drilling Inc. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-02-04 1546.20 Deviate (5 - 79 degrees)
2019-02-06 2024.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-06 Multi-Stage Fracture 4298.10 4298.70 0
2019-03-07 Multi-Stage Fracture 4041.10 4043.00 0
2019-03-07 Multi-Stage Fracture 4010.40 4012.30 0
2019-03-07 Multi-Stage Fracture 3980.10 3982.00 0
2019-03-07 Multi-Stage Fracture 3949.60 3951.50 0
2019-03-07 Multi-Stage Fracture 3919.20 3921.20 0
2019-03-07 Multi-Stage Fracture 3888.90 3890.80 0
2019-03-07 Multi-Stage Fracture 3858.60 3860.50 0
2019-03-07 Multi-Stage Fracture 3829.60 3831.50 0
2019-03-07 Multi-Stage Fracture 3799.00 3800.90 0
2019-03-07 Multi-Stage Fracture 3768.40 3770.30 0
2019-03-07 Multi-Stage Fracture 4281.70 4283.60 0
2019-03-07 Multi-Stage Fracture 3738.40 3740.30 0
2019-03-07 Multi-Stage Fracture 3708.80 3710.70 0
2019-03-07 Multi-Stage Fracture 3678.30 3680.20 0
2019-03-07 Multi-Stage Fracture 3648.40 3650.30 0
2019-03-07 Multi-Stage Fracture 3619.80 3621.70 0
2019-03-07 Multi-Stage Fracture 3589.10 3591.10 0
2019-03-07 Multi-Stage Fracture 3559.50 3561.50 0
2019-03-07 Multi-Stage Fracture 3529.10 3531.00 0
2019-03-07 Multi-Stage Fracture 3498.50 3500.40 0
2019-03-07 Multi-Stage Fracture 3468.30 3470.20 0
2019-03-07 Multi-Stage Fracture 4251.50 4253.40 0
2019-03-07 Multi-Stage Fracture 3437.20 3439.10 0
2019-03-07 Multi-Stage Fracture 3406.10 3408.00 0
2019-03-07 Multi-Stage Fracture 3374.80 3376.60 0
2019-03-07 Multi-Stage Fracture 3343.30 3345.20 0
2019-03-07 Multi-Stage Fracture 3311.70 3313.60 0
2019-03-07 Multi-Stage Fracture 3279.80 3281.70 0
2019-03-07 Multi-Stage Fracture 3248.50 3250.40 0
2019-03-07 Multi-Stage Fracture 3216.60 3218.60 0
2019-03-07 Multi-Stage Fracture 3185.10 3187.00 0
2019-03-07 Multi-Stage Fracture 3153.60 3155.50 0
2019-03-07 Multi-Stage Fracture 4220.20 4222.10 0
2019-03-07 Multi-Stage Fracture 3122.90 3124.90 0
2019-03-07 Multi-Stage Fracture 3091.70 3093.60 0
2019-03-08 Multi-Stage Fracture 3060.30 3062.20 0
2019-03-08 Multi-Stage Fracture 3030.30 3032.30 0
2019-03-08 Multi-Stage Fracture 2999.90 3001.80 0
2019-03-08 Multi-Stage Fracture 2970.20 2972.10 0
2019-03-08 Multi-Stage Fracture 2939.00 2940.90 0
2019-03-08 Multi-Stage Fracture 2907.60 2909.50 0
2019-03-08 Multi-Stage Fracture 2876.40 2878.30 0
2019-03-08 Multi-Stage Fracture 2844.50 2846.40 0
2019-03-07 Multi-Stage Fracture 4191.80 4193.70 0
2019-03-08 Multi-Stage Fracture 2813.30 2815.20 0
2019-03-08 Multi-Stage Fracture 2783.30 2785.20 0
2019-03-08 Multi-Stage Fracture 2754.00 2755.90 0
2019-03-08 Multi-Stage Fracture 2724.30 2726.20 0
2019-03-08 Multi-Stage Fracture 2694.80 2696.70 0
2019-03-08 Multi-Stage Fracture 2664.20 2666.20 0
2019-03-08 Multi-Stage Fracture 2634.40 2636.30 0
2019-03-08 Multi-Stage Fracture 2604.30 2606.20 0
2019-03-08 Multi-Stage Fracture 2573.20 2575.10 0
2019-03-08 Multi-Stage Fracture 2542.90 2544.80 0
2019-03-07 Multi-Stage Fracture 4161.80 4163.70 0
2019-03-08 Multi-Stage Fracture 2513.00 2514.90 0
2019-03-08 Multi-Stage Fracture 2484.20 2486.10 0
2019-03-08 Multi-Stage Fracture 2455.20 2457.10 0
2019-03-08 Multi-Stage Fracture 2424.80 2426.70 0
2019-03-08 Multi-Stage Fracture 2394.10 2396.00 0
2019-03-08 Multi-Stage Fracture 2363.40 2365.30 0
2019-03-08 Multi-Stage Fracture 2333.20 2335.20 0
2019-03-08 Multi-Stage Fracture 2302.40 2304.40 0
2019-03-08 Multi-Stage Fracture 2273.10 2275.00 0
2019-03-08 Multi-Stage Fracture 2243.50 2245.50 0
2019-03-07 Multi-Stage Fracture 4132.80 4134.70 0
2019-03-08 Multi-Stage Fracture 2214.30 2216.20 0
2019-03-08 Multi-Stage Fracture 2183.60 2185.50 0
2019-03-08 Multi-Stage Fracture 2152.50 2154.40 0
2019-03-08 Multi-Stage Fracture 2121.90 2123.80 0
2019-03-07 Multi-Stage Fracture 4101.30 4103.20 0
2019-03-07 Multi-Stage Fracture 4071.50 4073.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-06 2019-03-08 1,903 6,543 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid 7647-01-0 100 0.6081 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.605 N/A
Water 7732-18-5 100 94.1283 N/A
20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 1.9844 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 3.9688 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0115 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0115 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.1012 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.1012 N/A
ELEFR-3A Element Friction Reducer Non-hazardous Ingredients Not Available 100 0.0565 N/A
Tergitol 15-S-20 68131-40-8 100 0.0565 N/A
ELESurf-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0934 N/A
Methanol 67-56-1 100 0.0934 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0934 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-02-23 2019-02-26 Surface Water - Runoff 677
2019-02-27 2019-03-04 Surface Water - Runoff 7992
2019-03-04 2019-03-05 Surface Water - Runoff 1428
2019-03-08 2019-03-08 Surface Water - Runoff 1404

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 6732 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-12 No Incident Encountered 0.00 0.00
2019-03-13 No Incident Encountered 0.00 0.00

For data sources see[10]

References