If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415061416030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.533831,"lon":-114.782279,"icon":""}]} |
Location: 03/16-14-041-06W5/0 | |
Location Alias: 03/16-14-41-06 W5M | |
Location Alias 2: 03/16-14-041-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 06 | |
Section: 14 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ 103 WILLGR 16-14-41-6 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0491348 | |
License Date: 2018-10-09 | |
License Status: Issued | |
Spud Date: 2018-11-11 | |
Final Drill Date: 2018-11-18 | |
Well Total Depth: 4348.00 m | |
Surface Hole Latitude: 52.533831 | |
Surface Hole Longitude: -114.782279 |
Date | Event |
---|---|
2018-10-09 | Obtained License |
2018-11-12 | Surface Casing Operation Performed |
2018-11-13 | Direction Drilling Operation Performed - Deviate |
2018-11-14 | Direction Drilling Operation Performed - Horizontal |
2018-11-18 | Finished Drilling |
2018-11-18 | Well Log Performed |
2018-11-18 | Well Mode changed to Drilled and Cased |
2018-11-20 | Production Casing Operation Performed |
2018-11-20 | Rig Released |
2018-12-18 | Well Log Performed |
2018-12-19 | Well Log Performed |
2019-01-01 | Well Began Production |
2019-01-01 | Well Fluid changed to Crude Oil |
2019-01-01 | Well Mode changed to Flowing |
2019-01-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-20 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-11-11 | Stampede Drilling A Division Of Matrix Energy Technologi | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-11-13 | 1660.40 | Deviate (5 - 79 degrees) |
2018-11-14 | 2021.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-01-16 | Multi-Stage Fracture | 4304.20 | 4304.30 | 0 |
2019-01-17 | Multi-Stage Fracture | 4144.90 | 4145.00 | 0 |
2019-01-20 | Multi-Stage Fracture | 2550.50 | 2550.60 | 0 |
2019-01-20 | Multi-Stage Fracture | 2532.70 | 2532.80 | 0 |
2019-01-20 | Multi-Stage Fracture | 2515.10 | 2515.20 | 0 |
2019-01-20 | Multi-Stage Fracture | 2497.40 | 2497.50 | 0 |
2019-01-20 | Multi-Stage Fracture | 2479.60 | 2479.70 | 0 |
2019-01-20 | Multi-Stage Fracture | 2461.90 | 2462.00 | 0 |
2019-01-20 | Multi-Stage Fracture | 2444.00 | 2444.10 | 0 |
2019-01-20 | Multi-Stage Fracture | 2426.30 | 2426.40 | 0 |
2019-01-20 | Multi-Stage Fracture | 2409.20 | 2409.30 | 0 |
2019-01-20 | Multi-Stage Fracture | 2391.60 | 2391.70 | 0 |
2019-01-17 | Multi-Stage Fracture | 4127.20 | 4127.30 | 0 |
2019-01-20 | Multi-Stage Fracture | 2373.80 | 2373.90 | 0 |
2019-01-20 | Multi-Stage Fracture | 2356.00 | 2356.10 | 0 |
2019-01-20 | Multi-Stage Fracture | 2338.30 | 2338.40 | 0 |
2019-01-20 | Multi-Stage Fracture | 2320.50 | 2320.60 | 0 |
2019-01-20 | Multi-Stage Fracture | 2302.70 | 2302.80 | 0 |
2019-01-20 | Multi-Stage Fracture | 2284.90 | 2285.00 | 0 |
2019-01-20 | Multi-Stage Fracture | 2267.20 | 2267.30 | 0 |
2019-01-20 | Multi-Stage Fracture | 2249.60 | 2249.70 | 0 |
2019-01-20 | Multi-Stage Fracture | 2232.00 | 2232.10 | 0 |
2019-01-20 | Multi-Stage Fracture | 2214.20 | 2214.30 | 0 |
2019-01-17 | Multi-Stage Fracture | 4109.40 | 4109.50 | 0 |
2019-01-20 | Multi-Stage Fracture | 2196.40 | 2196.50 | 0 |
2019-01-20 | Multi-Stage Fracture | 2178.70 | 2178.80 | 0 |
2019-01-20 | Multi-Stage Fracture | 2160.90 | 2161.00 | 0 |
2019-01-20 | Multi-Stage Fracture | 2143.10 | 2143.20 | 0 |
2019-01-20 | Multi-Stage Fracture | 2125.30 | 2125.40 | 0 |
2019-01-20 | Multi-Stage Fracture | 2107.50 | 2107.60 | 0 |
2019-01-20 | Multi-Stage Fracture | 2089.70 | 2089.80 | 0 |
2019-01-17 | Multi-Stage Fracture | 4091.60 | 4091.70 | 0 |
2019-01-17 | Multi-Stage Fracture | 4073.70 | 4073.80 | 0 |
2019-01-17 | Multi-Stage Fracture | 4055.90 | 4056.00 | 0 |
2019-01-17 | Multi-Stage Fracture | 4038.10 | 4038.20 | 0 |
2019-01-17 | Multi-Stage Fracture | 4020.40 | 4020.50 | 0 |
2019-01-17 | Multi-Stage Fracture | 4002.50 | 4002.60 | 0 |
2019-01-17 | Multi-Stage Fracture | 3984.70 | 3984.80 | 0 |
2019-01-17 | Multi-Stage Fracture | 4286.50 | 4286.60 | 0 |
2019-01-17 | Multi-Stage Fracture | 3967.00 | 3967.10 | 0 |
2019-01-17 | Multi-Stage Fracture | 3949.30 | 3949.40 | 0 |
2019-01-17 | Multi-Stage Fracture | 3931.50 | 3931.60 | 0 |
2019-01-17 | Multi-Stage Fracture | 3913.80 | 3913.90 | 0 |
2019-01-17 | Multi-Stage Fracture | 3896.00 | 3896.10 | 0 |
2019-01-17 | Multi-Stage Fracture | 3878.30 | 3878.40 | 0 |
2019-01-17 | Multi-Stage Fracture | 3860.60 | 3860.70 | 0 |
2019-01-17 | Multi-Stage Fracture | 3843.00 | 3843.10 | 0 |
2019-01-17 | Multi-Stage Fracture | 3825.20 | 3825.30 | 0 |
2019-01-17 | Multi-Stage Fracture | 3807.40 | 3807.50 | 0 |
2019-01-17 | Multi-Stage Fracture | 4268.70 | 4268.80 | 0 |
2019-01-17 | Multi-Stage Fracture | 3789.60 | 3789.70 | 0 |
2019-01-17 | Multi-Stage Fracture | 3771.90 | 3772.00 | 0 |
2019-01-17 | Multi-Stage Fracture | 3754.20 | 3754.30 | 0 |
2019-01-17 | Multi-Stage Fracture | 3736.70 | 3736.80 | 0 |
2019-01-18 | Multi-Stage Fracture | 3719.20 | 3719.30 | 0 |
2019-01-18 | Multi-Stage Fracture | 3701.60 | 3701.70 | 0 |
2019-01-18 | Multi-Stage Fracture | 3684.30 | 3684.40 | 0 |
2019-01-18 | Multi-Stage Fracture | 3666.90 | 3667.00 | 0 |
2019-01-18 | Multi-Stage Fracture | 3649.10 | 3649.20 | 0 |
2019-01-18 | Multi-Stage Fracture | 3631.50 | 3631.60 | 0 |
2019-01-17 | Multi-Stage Fracture | 4251.20 | 4251.30 | 0 |
2019-01-18 | Multi-Stage Fracture | 3613.70 | 3613.80 | 0 |
2019-01-18 | Multi-Stage Fracture | 3595.90 | 3596.00 | 0 |
2019-01-18 | Multi-Stage Fracture | 3578.20 | 3578.30 | 0 |
2019-01-18 | Multi-Stage Fracture | 3560.60 | 3560.70 | 0 |
2019-01-18 | Multi-Stage Fracture | 3542.80 | 3542.90 | 0 |
2019-01-18 | Multi-Stage Fracture | 3524.90 | 3525.00 | 0 |
2019-01-18 | Multi-Stage Fracture | 3507.20 | 3507.30 | 0 |
2019-01-18 | Multi-Stage Fracture | 3489.50 | 3489.60 | 0 |
2019-01-18 | Multi-Stage Fracture | 3471.70 | 3471.80 | 0 |
2019-01-18 | Multi-Stage Fracture | 3453.90 | 3454.00 | 0 |
2019-01-17 | Multi-Stage Fracture | 4233.60 | 4233.70 | 0 |
2019-01-18 | Multi-Stage Fracture | 3436.20 | 3436.30 | 0 |
2019-01-18 | Multi-Stage Fracture | 3418.40 | 3418.50 | 0 |
2019-01-18 | Multi-Stage Fracture | 3400.60 | 3400.70 | 0 |
2019-01-18 | Multi-Stage Fracture | 3382.90 | 3383.00 | 0 |
2019-01-18 | Multi-Stage Fracture | 3365.00 | 3365.10 | 0 |
2019-01-18 | Multi-Stage Fracture | 3347.50 | 3347.60 | 0 |
2019-01-18 | Multi-Stage Fracture | 3329.70 | 3329.80 | 0 |
2019-01-18 | Multi-Stage Fracture | 3311.90 | 3312.00 | 0 |
2019-01-18 | Multi-Stage Fracture | 3294.20 | 3294.30 | 0 |
2019-01-18 | Multi-Stage Fracture | 3276.30 | 3276.40 | 0 |
2019-01-17 | Multi-Stage Fracture | 4215.90 | 4216.00 | 0 |
2019-01-18 | Multi-Stage Fracture | 3258.60 | 3258.70 | 0 |
2019-01-18 | Multi-Stage Fracture | 3241.00 | 3241.10 | 0 |
2019-01-18 | Multi-Stage Fracture | 3223.20 | 3223.30 | 0 |
2019-01-18 | Multi-Stage Fracture | 3205.40 | 3205.50 | 0 |
2019-01-18 | Multi-Stage Fracture | 3187.70 | 3187.80 | 0 |
2019-01-18 | Multi-Stage Fracture | 3169.90 | 3170.00 | 0 |
2019-01-18 | Multi-Stage Fracture | 3152.20 | 3152.30 | 0 |
2019-01-18 | Multi-Stage Fracture | 3134.90 | 3135.00 | 0 |
2019-01-18 | Multi-Stage Fracture | 3117.10 | 3117.20 | 0 |
2019-01-18 | Multi-Stage Fracture | 3099.40 | 3099.50 | 0 |
2019-01-17 | Multi-Stage Fracture | 4198.10 | 4198.20 | 0 |
2019-01-18 | Multi-Stage Fracture | 3081.70 | 3081.80 | 0 |
2019-01-18 | Multi-Stage Fracture | 3064.10 | 3064.20 | 0 |
2019-01-18 | Multi-Stage Fracture | 3046.20 | 3046.30 | 0 |
2019-01-18 | Multi-Stage Fracture | 3028.40 | 3028.50 | 0 |
2019-01-18 | Multi-Stage Fracture | 3010.60 | 3010.70 | 0 |
2019-01-18 | Multi-Stage Fracture | 2992.90 | 2993.00 | 0 |
2019-01-18 | Multi-Stage Fracture | 2975.20 | 2975.30 | 0 |
2019-01-18 | Multi-Stage Fracture | 2957.40 | 2957.50 | 0 |
2019-01-18 | Multi-Stage Fracture | 2939.70 | 2939.80 | 0 |
2019-01-18 | Multi-Stage Fracture | 2922.00 | 2922.10 | 0 |
2019-01-17 | Multi-Stage Fracture | 4180.40 | 4180.50 | 0 |
2019-01-18 | Multi-Stage Fracture | 2904.30 | 2904.40 | 0 |
2019-01-19 | Multi-Stage Fracture | 2886.90 | 2887.00 | 0 |
2019-01-19 | Multi-Stage Fracture | 2869.10 | 2869.20 | 0 |
2019-01-19 | Multi-Stage Fracture | 2851.30 | 2851.40 | 0 |
2019-01-19 | Multi-Stage Fracture | 2833.50 | 2833.60 | 0 |
2019-01-19 | Multi-Stage Fracture | 2815.70 | 2815.80 | 0 |
2019-01-19 | Multi-Stage Fracture | 2798.00 | 2798.10 | 0 |
2019-01-19 | Multi-Stage Fracture | 2780.20 | 2780.30 | 0 |
2019-01-19 | Multi-Stage Fracture | 2762.50 | 2762.60 | 0 |
2019-01-19 | Multi-Stage Fracture | 2744.70 | 2744.80 | 0 |
2019-01-17 | Multi-Stage Fracture | 4162.70 | 4162.80 | 0 |
2019-01-19 | Multi-Stage Fracture | 2726.90 | 2727.00 | 0 |
2019-01-20 | Multi-Stage Fracture | 2709.20 | 2709.30 | 0 |
2019-01-20 | Multi-Stage Fracture | 2691.30 | 2691.40 | 0 |
2019-01-20 | Multi-Stage Fracture | 2673.60 | 2673.70 | 0 |
2019-01-20 | Multi-Stage Fracture | 2656.20 | 2656.30 | 0 |
2019-01-20 | Multi-Stage Fracture | 2638.50 | 2638.60 | 0 |
2019-01-20 | Multi-Stage Fracture | 2620.90 | 2621.00 | 0 |
2019-01-20 | Multi-Stage Fracture | 2603.40 | 2603.50 | 0 |
2019-01-20 | Multi-Stage Fracture | 2585.70 | 2585.80 | 0 |
2019-01-20 | Multi-Stage Fracture | 2567.90 | 2568.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-01-16 | 2019-01-20 | 1,933 | 11,633 | N/A |
2 | 2019-01-17 | 2019-01-20 | 1,933 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 94.5814 | N/A | |||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.8491 | N/A | ||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0082 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0082 | N/A | ||||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0087 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0087 | N/A | ||||
ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.0687 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0687 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0642 | N/A | |
Methanol | 67-56-1 | 100 | 0.0642 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0642 | N/A | ||||
2 | 20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 5.1784 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-01-16 | 2019-01-19 | Surface Water - Runoff | 4233 |
2019-01-16 | 2019-01-17 | Surface Water - Runoff | 2150 |
2019-01-17 | 2019-01-21 | Municipal Water | 1109 |
2019-01-17 | 2019-01-18 | Oilfield Produced Water | 105 |
2019-01-17 | 2019-01-18 | Oilfield Produced Water | 203 |
2019-01-17 | 2019-01-18 | Oilfield Produced Water | 60 |
2019-01-18 | 2019-01-18 | Oilfield Produced Water | 27 |
2019-01-18 | 2019-01-19 | Surface Water - Runoff | 4876 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 6874 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-11-20 | No Incident Encountered | 0.00 | 0.00 |
2019-01-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]