X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415061401000

Well Details

Well ID: 0415061401000
Loading map...
Location: 00/01-14-041-06W5/0
Location Alias: 00/01-14-41-06 W5M
Location Alias 2: 00/01-14-041-06 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 06
Section: 14
County/Municipality: Clearwater County
Well Name: YANGARRA WILLGR 1-14-41-6
Operator Name: Yangarra Resources Corp.
License Number: 0480050
License Date: 2016-08-05
License Status: Issued
Spud Date: 2016-09-14
Final Drill Date: 2016-09-24
Well Total Depth: 4990.00 m
Surface Hole Latitude: 52.526911
Surface Hole Longitude: -114.794263

For data sources see[1][2]

Well History

Date Event
2016-08-05 Obtained License
2016-09-15 Surface Casing Operation Performed
2016-09-18 Direction Drilling Operation Performed - Deviate
2016-09-18 Direction Drilling Operation Performed - Horizontal
2016-09-24 Finished Drilling
2016-09-24 Well Log Performed
2016-09-24 Well Mode changed to Drilled and Cased
2016-09-26 Production Casing Operation Performed
2016-09-27 Rig Released
2016-09-29 Well Log Performed
2016-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-13 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-14 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-25 Well Began Production
2016-10-25 Well Fluid changed to Crude Oil
2016-10-25 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-09-14 Trinidad Drilling Ltd. 53 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-09-18 1620.30 Deviate (5 - 79 degrees)
2016-09-18 2065.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-10-06 Multi-Stage Fracture 4966.10 4966.70 0
2016-10-06 Multi-Stage Fracture 4668.20 4670.10 0
2016-10-06 Multi-Stage Fracture 4628.30 4630.20 0
2016-10-06 Multi-Stage Fracture 4600.10 4602.10 0
2016-10-06 Multi-Stage Fracture 4560.30 4562.20 0
2016-10-06 Multi-Stage Fracture 4532.10 4534.00 0
2016-10-06 Multi-Stage Fracture 4492.20 4494.10 0
2016-10-06 Multi-Stage Fracture 4464.10 4466.10 0
2016-10-06 Multi-Stage Fracture 4424.20 4426.20 0
2016-10-06 Multi-Stage Fracture 4396.10 4398.00 0
2016-10-06 Multi-Stage Fracture 4356.20 4358.10 0
2016-10-06 Multi-Stage Fracture 4939.70 4941.70 0
2016-10-06 Multi-Stage Fracture 4328.10 4330.10 0
2016-10-06 Multi-Stage Fracture 4288.40 4290.30 0
2016-10-06 Multi-Stage Fracture 4260.20 4262.10 0
2016-10-06 Multi-Stage Fracture 4220.40 4222.40 0
2016-10-06 Multi-Stage Fracture 4192.60 4194.50 0
2016-10-06 Multi-Stage Fracture 4152.70 4154.70 0
2016-10-06 Multi-Stage Fracture 4124.70 4126.70 0
2016-10-06 Multi-Stage Fracture 4085.50 4087.40 0
2016-10-07 Multi-Stage Fracture 4057.40 4059.30 0
2016-10-07 Multi-Stage Fracture 4017.50 4019.40 0
2016-10-06 Multi-Stage Fracture 4900.10 4902.00 0
2016-10-07 Multi-Stage Fracture 3989.40 3991.30 0
2016-10-07 Multi-Stage Fracture 3950.00 3951.90 0
2016-10-07 Multi-Stage Fracture 3922.10 3924.00 0
2016-10-07 Multi-Stage Fracture 3883.20 3885.20 0
2016-10-08 Multi-Stage Fracture 3855.50 3857.40 0
2016-10-08 Multi-Stage Fracture 3816.30 3818.20 0
2016-10-08 Multi-Stage Fracture 3788.40 3790.30 0
2016-10-08 Multi-Stage Fracture 3749.10 3751.00 0
2016-10-08 Multi-Stage Fracture 3721.40 3723.30 0
2016-10-08 Multi-Stage Fracture 3682.20 3684.10 0
2016-10-06 Multi-Stage Fracture 4872.20 4874.10 0
2016-10-08 Multi-Stage Fracture 3654.60 3656.50 0
2016-10-13 Multi-Stage Fracture 3615.60 3617.50 0
2016-10-13 Multi-Stage Fracture 3182.40 3184.40 0
2016-10-13 Multi-Stage Fracture 3142.60 3144.50 0
2016-10-13 Multi-Stage Fracture 3114.80 3116.70 0
2016-10-13 Multi-Stage Fracture 3074.90 3076.80 0
2016-10-13 Multi-Stage Fracture 3046.80 3048.70 0
2016-10-13 Multi-Stage Fracture 3007.40 3009.30 0
2016-10-13 Multi-Stage Fracture 2979.20 2981.20 0
2016-10-13 Multi-Stage Fracture 2939.80 2941.80 0
2016-10-06 Multi-Stage Fracture 4832.30 4834.20 0
2016-10-13 Multi-Stage Fracture 2911.90 2913.80 0
2016-10-13 Multi-Stage Fracture 2872.30 2874.20 0
2016-10-13 Multi-Stage Fracture 2844.70 2846.60 0
2016-10-13 Multi-Stage Fracture 2805.10 2807.00 0
2016-10-13 Multi-Stage Fracture 2776.90 2778.90 0
2016-10-13 Multi-Stage Fracture 2737.30 2739.20 0
2016-10-13 Multi-Stage Fracture 2709.40 2711.40 0
2016-10-13 Multi-Stage Fracture 2669.60 2671.50 0
2016-10-13 Multi-Stage Fracture 2641.50 2643.50 0
2016-10-13 Multi-Stage Fracture 2601.70 2603.60 0
2016-10-06 Multi-Stage Fracture 4804.10 4806.00 0
2016-10-13 Multi-Stage Fracture 2573.50 2575.40 0
2016-10-13 Multi-Stage Fracture 2533.70 2535.60 0
2016-10-13 Multi-Stage Fracture 2505.40 2507.40 0
2016-10-13 Multi-Stage Fracture 2465.50 2467.50 0
2016-10-13 Multi-Stage Fracture 2437.40 2439.30 0
2016-10-13 Multi-Stage Fracture 2397.50 2399.40 0
2016-10-13 Multi-Stage Fracture 2369.30 2371.20 0
2016-10-13 Multi-Stage Fracture 2329.40 2331.30 0
2016-10-13 Multi-Stage Fracture 2301.20 2303.10 0
2016-10-13 Multi-Stage Fracture 2261.30 2263.30 0
2016-10-06 Multi-Stage Fracture 4764.30 4766.20 0
2016-10-13 Multi-Stage Fracture 2233.20 2235.10 0
2016-10-13 Multi-Stage Fracture 2193.30 2195.20 0
2016-10-14 Multi-Stage Fracture 2165.10 2167.00 0
2016-10-14 Multi-Stage Fracture 2125.20 2127.10 0
2016-10-14 Multi-Stage Fracture 2097.10 2099.00 0
2016-10-06 Multi-Stage Fracture 4736.10 4738.00 0
2016-10-06 Multi-Stage Fracture 4696.30 4698.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-10-06 2016-10-14 1,924 7,690 N/A
2 2016-10-06 2016-10-06 1,924 0 N/A
3 2016-10-08 2016-10-13 1,924 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.1216 N/A
Sand (20/40) Canyon Technical Services Aluminum Oxide 1344-28-1 100 9.5578 N/A
Crystalline silica. quartz 14808-60-7 100 9.5578 N/A
Iron Oxide 1309-37-1 100 9.5578 N/A
Titanium Oxide 13463-67-7 100 9.5578 N/A
Sand (30/50) Canyon Technical Services Aluminum Oxide 1344-28-1 100 4.5271 N/A
Crystalline silica. quartz 14808-60-7 100 4.5271 N/A
Iron Oxide 1309-37-1 100 4.5271 N/A
Titanium Oxide 13463-67-7 100 4.5271 N/A
Chemcide PT Canyon Technical Services Bactericide/Biocide Methyl Alcohol 67-56-1 100 0.024 N/A
N-Coco Alkyltrimethylenediamine diacetates 61791-64-8 100 0.024 N/A
CAN-1911 Clay Stabilizer Canyon Technical Services Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.0604 N/A
Water 7732-18-5 100 0.0604 N/A
CAN-2413 Non-emulsifier Canyon Technical Services Demulsifier Isopropyl Alcohol 67-63-0 100 0.0734 N/A
Methanol 67-56-1 100 0.0734 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0734 N/A
Sulfonic Acids (Petroleum) 61789-85-3 100 0.0734 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Technical Services Gelling Agent Ammonium Chloride 12125-02-9 100 0.0986 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0986 N/A
Water 7732-18-5 100 0.0986 N/A
2 Sand (20/40) Third Party Aluminum Oxide 1344-28-1 100 8.2325 N/A
Crystalline silica. quartz 14808-60-7 100 8.2325 N/A
Iron Oxide 1309-37-1 100 8.2325 N/A
Titanium Oxide 13463-67-7 100 8.2324 N/A
Sand (40/70) Canyon Technical Services Aluminum Oxide 1344-28-1 100 0.1274 N/A
Crystalline silica. quartz 14808-60-7 100 0.1274 N/A
Iron Oxide 1309-37-1 100 0.1274 N/A
Titanium Oxide 13463-67-7 100 0.1277 N/A
3 CAN-4005 Tubular Lubricant Canyon Technical Services Friction Reducer Fatty Acids. Tall Oil. Sulfurized Methyl Esters 68440-27-7 100 0.0013 N/A
Sweetened Middle Distillate 64742-47-8 100 0.0013 N/A
Water 7732-18-5 100 0.0013 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-10-09 2016-10-10 Surface Water - Runoff 3048
2016-10-06 2016-10-09 Surface Water - Runoff 3539

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 1618 0.0 0.0 0.0
2017 8290 0.0 0.0 0.0
2018 7943 0.0 0.0 0.0
2019 8107 0.0 0.0 0.0
2020 2136 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-28 No Incident Encountered 0.00 0.00
2016-10-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References