X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415053601000

Well Details

Well ID: 0415053601000
Loading map...
Location: 00/01-36-041-05W5/0
Location Alias: 00/01-36-41-05 W5M
Location Alias 2: 00/01-36-041-05 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 05
Section: 36
County/Municipality: Clearwater County
Well Name: HARVEST ET AL HZ GILBY 1-36-41-5
Operator Name: Harvest Operations Corp.
License Number: 0434717
License Date: 2011-06-29
License Status: Amended
Spud Date: 2011-09-12
Final Drill Date: 2011-09-24
Well Total Depth: 3428.00 m
Surface Hole Latitude: 52.581990
Surface Hole Longitude: -114.581306

For data sources see[1][2]

Well History

Date Event
2011-06-29 Obtained License
2011-09-14 Surface Casing Operation Performed
2011-09-16 Direction Drilling Operation Performed - Deviate
2011-09-16 Well Log Performed
2011-09-19 Direction Drilling Operation Performed - Horizontal
2011-09-20 Intermediate Casing Operation Performed
2011-09-20 Well Log Performed
2011-09-24 Finished Drilling
2011-09-24 Well Log Performed
2011-09-24 Well Mode changed to Drilled and Cased
2011-09-26 Liner Casing Operation Performed
2011-09-26 Perforation Treatment Performed - Open-Hole Completion
2011-09-26 Rig Released
2011-10-18 Well Log Performed
2011-10-24 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-21 Well Began Production
2011-12-21 Well Fluid changed to Gas
2011-12-21 Well Mode changed to Flowing
2017-01-01 Well Fluid changed to Gas
2017-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-16 1832.70 Deviate (5 - 79 degrees)
2011-09-19 2282.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-26 Open Hole/Barefoot Completion 3418.00 3428.00 0
2011-10-31 Multi-Stage Fracture 2455.10 2455.20 0
2011-10-24 Multi-Stage Fracture 3399.60 3399.70 0
2011-10-30 Multi-Stage Fracture 3149.30 3149.40 0
2011-10-30 Multi-Stage Fracture 3047.60 3047.70 0
2011-10-30 Multi-Stage Fracture 2945.90 2946.00 0
2011-10-31 Multi-Stage Fracture 2844.20 2844.30 0
2011-10-31 Multi-Stage Fracture 2756.40 2756.50 0
2011-10-31 Multi-Stage Fracture 2654.70 2654.80 0
2011-10-31 Multi-Stage Fracture 2539.10 2539.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 264 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8485 0.0 0.0 0.0
2014 8598 0.0 0.0 0.0
2015 8231 0.0 0.0 0.0
2016 8351 0.0 0.0 0.0
2017 8495 0.0 0.0 0.0
2018 8447 0.0 0.0 0.0
2019 7560 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References