X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415043613000

Well Details

Well ID: 0415043613000
Loading map...
Location: 00/13-36-041-04W5/0
Location Alias: 00/13-36-41-04 W5M
Location Alias 2: 00/13-36-041-04 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 04
Section: 36
County/Municipality: Ponoka County
Well Name: CVE GILBY 13-36-41-4
Operator Name: Cenovus Energy Inc.
License Number: 0434904
License Date: 2011-07-05
License Status: Issued
Spud Date: 2011-09-11
Final Drill Date: 2011-09-23
Well Total Depth: 3427.00 m
Surface Hole Latitude: 52.568025
Surface Hole Longitude: -114.453869

For data sources see[1][2]

Well History

Date Event
2011-07-05 Obtained License
2011-09-12 Surface Casing Operation Performed
2011-09-14 Direction Drilling Operation Performed - Horizontal
2011-09-17 Well Log Performed
2011-09-19 Intermediate Casing Operation Performed
2011-09-19 Well Log Performed
2011-09-23 Finished Drilling
2011-09-23 Well Log Performed
2011-09-23 Well Mode changed to Drilled and Cased
2011-09-24 Liner Casing Operation Performed
2011-09-24 Perforation Treatment Performed - Open-Hole Completion
2011-09-25 Well Log Performed
2011-09-26 Rig Released
2011-10-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-14 Well Fluid changed to Gas
2011-10-14 Well Mode changed to Testing
2011-10-19 Well Fluid changed to Gas
2011-10-19 Well Mode changed to Test Completed
2012-01-31 Well Began Production
2012-01-31 Well Fluid changed to Gas
2012-01-31 Well Mode changed to Flowing
2013-07-03 Well Fluid changed to Gas
2013-07-03 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-14 1740.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-24 Open Hole/Barefoot Completion 3347.00 3427.00 0
2011-10-14 Multi-Stage Fracture 2426.10 2426.60 0
2011-10-14 Multi-Stage Fracture 2309.30 2309.80 0
2011-10-13 Multi-Stage Fracture 3335.50 3336.00 0
2011-10-13 Multi-Stage Fracture 3243.80 3244.20 0
2011-10-13 Multi-Stage Fracture 3125.50 3126.00 0
2011-10-13 Multi-Stage Fracture 3008.20 3008.70 0
2011-10-13 Multi-Stage Fracture 2892.90 2893.40 0
2011-10-13 Multi-Stage Fracture 2776.80 2777.30 0
2011-10-13 Multi-Stage Fracture 2674.00 2674.50 0
2011-10-14 Multi-Stage Fracture 2542.50 2543.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 62 0.0 0.0 0.0
2012 7209 0.0 0.0 0.0
2013 4314 0.0 0.0 0.0
2014 8285 0.0 0.0 0.0
2015 8446 0.0 0.0 0.0
2016 8495 0.0 0.0 0.0
2017 8365 0.0 0.0 0.0
2018 8083 0.0 0.0 0.0
2019 8231 0.0 0.0 0.0
2020 2087 0.0 0.0 0.0

For data sources see[6]

References