X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415030312000

Well Details

Well ID: 0415030312000
Loading map...
Location: 00/12-03-041-03W5/0
Location Alias: 00/12-03-41-03 W5M
Location Alias 2: 00/12-03-041-03 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 03
Section: 03
County/Municipality: Lacombe County
Well Name: ESSO ET AL GILBY IN 12-3-41-3
Operator Name: Imperial Oil Resources Limited
License Number: 0010409
License Date: 1955-11-01
License Status: RecCertified
Spud Date: 1955-11-04
Final Drill Date: 1955-11-24
Well Total Depth: 1962.90 m
Surface Hole Latitude: 52.503244
Surface Hole Longitude: -114.358407

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-11-01 Obtained License
1955-11-24 Finished Drilling
1955-11-24 Well Mode changed to Drilled and Cased
1955-11-26 Production Casing Operation Performed
1955-12-23 Perforation Treatment Performed - Jet Perforation
1956-01-21 Well Began Production
1956-01-21 Well Fluid changed to Crude Oil
1956-01-21 Well Mode changed to Pumping
1963-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-02-09 Well Began Injection
1963-02-09 Well Fluid changed to Water
1963-02-09 Well Type changed to Injection
1984-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-08-11 Well Fluid changed to Water
1986-08-11 Well Mode changed to Suspended
1986-08-11 Well Type changed to Injection
1988-04-01 Well Fluid changed to Water
1988-04-01 Well Type changed to Injection
1990-12-01 Well Fluid changed to Water
1990-12-01 Well Mode changed to Suspended
1990-12-01 Well Type changed to Injection
1991-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-08-28 Perforation Treatment Performed - Jet Perforation
1991-08-28 Plug Back Performed
1991-08-28 Well Fluid changed to Water
1991-08-28 Well Mode changed to Abandoned
1991-08-28 Well Type changed to Injection
1991-08-29 Perforation Treatment Performed - Jet Perforation
1991-08-29 Perforation Treatment Performed - Remedial Casing
1991-08-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-12-23 Perforation 1904.70 1909.00 13
1991-08-29 Remedial Casing Cementing 198.00 198.30 0
1963-01-13 Acid Treatment 1904.70 1909.00 0
1984-07-05 Acid Treatment 1904.70 1909.00 0
1986-08-07 Acid Treatment 1904.70 1909.00 0
1991-08-28 Packing Device Capped w/Cement 1887.00 1895.00 0
1991-08-28 Perforation 434.60 434.90 13
1991-08-28 Perforation 429.00 429.30 13
1991-08-29 Remedial Casing Cementing 429.00 434.90 0
1991-08-29 Perforation 198.00 198.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0

For data sources see[5]

References