X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414281206000

Well Details

Well ID: 0414281206000
Loading map...
Location: 00/06-12-041-28W4/0
Location Alias: 00/06-12-41-28 W4M
Location Alias 2: 00/06-12-041-28 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 28
Section: 12
County/Municipality: Lacombe County
Well Name: ESSO GULL LAKE 6-12-41-28
Operator Name: Imperial Oil Resources Limited
License Number: 0046810
License Date: 1973-08-07
License Status: RecCertified
Spud Date: 1973-09-15
Final Drill Date: 1973-09-29
Well Total Depth: 1859.30 m
Surface Hole Latitude: 52.511684
Surface Hole Longitude: -113.907914

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-08-07 Obtained License
1973-09-19 Drill Stem Test Performed
1973-09-21 Drill Stem Test Performed
1973-09-25 Drill Stem Test Performed
1973-09-29 Finished Drilling
1973-09-29 Well Mode changed to Drilled and Cased
1973-09-30 Drill Stem Test Performed
1973-10-01 Drill Stem Test Performed
1973-10-04 Drill Stem Test Performed
1973-10-04 Production Casing Operation Performed
1973-10-17 Perforation Treatment Performed - Jet Perforation
1973-10-18 Well Began Production
1973-10-18 Well Fluid changed to Crude Oil
1973-10-18 Well Mode changed to Flowing
1973-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-11-08 Well Fluid changed to Crude Oil
1973-11-08 Well Mode changed to Pumping
1973-11-09 Perforation Treatment Performed - Fractured
1973-11-23 Well Fluid changed to Crude Oil
1973-11-23 Well Mode changed to Suspended
1987-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-09-30 Plug Back Performed
1987-09-30 Well Abandoned
1987-09-30 Well Fluid changed to Crude Oil
1987-09-30 Well Log Performed
1987-09-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-10-17 Perforation 1016.80 1017.70 7
1973-10-17 Perforation 1018.60 1019.90 7
1973-10-19 Acid Treatment 1016.80 1019.90 0
1973-11-09 Fracture 1016.80 1019.90 0
1987-09-30 Packing Device Capped w/Cement 1002.00 1010.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 26 0.0 0.0 0.0

For data sources see[5]

References