X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414232310002

Well Details

Well ID: 0414232310002
Loading map...
Location: 00/10-23-041-23W4/2
Location Alias: 00/10-23-41-23 W4M
Location Alias 2: 00/10-23-041-23 W4/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 23
Section: 23
County/Municipality: Lacombe County
Well Name: DEKALB ET AL BASHAW 10-23-41-23
Operator Name: Paramount Resources Ltd.
License Number: 0086012
License Date: 1980-10-01
License Status: RecCertified
Spud Date: 1980-11-12
Final Drill Date: 1980-11-15
Well Total Depth: 797.00 m
Surface Hole Latitude: 52.543596
Surface Hole Longitude: -113.204456

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-01 Obtained License
1980-11-15 Finished Drilling
1980-11-15 Well Mode changed to Drilled and Cased
1980-11-16 Production Casing Operation Performed
1980-12-15 Perforation Treatment Performed - Jet Perforation
1980-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-06-19 Perforation Treatment Performed - Jet Perforation
1981-06-26 Perforation Treatment Performed - Fractured
1981-07-21 Perforation Treatment Performed - Jet Perforation
1981-07-22 Perforation Treatment Performed - Jet Perforation
1981-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-08-08 Perforation Treatment Performed - Fractured
1983-01-19 Well Began Production
1983-01-19 Well Fluid changed to Gas
1983-01-19 Well Mode changed to Flowing
1986-07-21 Well Log Performed
1987-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-09-25 Plug Back Performed
1987-09-25 Well Fluid changed to Gas
1987-09-25 Well Mode changed to Abandoned
1987-09-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-12-15 Perforation 725.50 729.00 1
1981-06-26 Fracture 588.00 670.00 0
1981-07-21 Perforation 544.00 552.00 3
1981-07-22 Perforation 525.00 526.50 3
1981-07-22 Perforation 490.00 492.00 3
1981-07-22 Perforation 487.00 488.50 3
1981-08-07 Acid Treatment 487.00 552.00 0
1981-08-08 Fracture 487.00 552.00 0
1987-09-25 Packing Device Capped w/Cement 469.00 477.00 0
1980-12-15 Perforation 730.00 738.00 1
1980-12-15 Perforation 748.00 749.00 1
1980-12-19 Acid Treatment 725.50 749.00 0
1981-06-19 Packing Device Capped w/Cement 700.00 710.00 0
1981-06-19 Perforation 668.00 670.00 3
1981-06-19 Perforation 660.00 662.00 3
1981-06-19 Perforation 612.50 614.50 3
1981-06-19 Perforation 588.00 589.50 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 2975 0.0 0.0 0.0
1984 886 0.0 0.0 0.0
1985 1275 0.0 0.0 0.0
1986 1516 0.0 0.0 0.0

For data sources see[5]

References