X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414230906000

Well Details

Well ID: 0414230906000
Loading map...
Location: 00/06-09-041-23W4/0
Location Alias: 00/06-09-41-23 W4M
Location Alias 2: 00/06-09-041-23 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 23
Section: 09
County/Municipality: Lacombe County
Well Name: BVE ET AL CHIGWELL 6-9-41-23
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0052207
License Date: 1974-12-13
License Status: RecCertified
Spud Date: 1974-12-14
Final Drill Date: 1974-12-21
Well Total Depth: 1615.40 m
Surface Hole Latitude: 52.510986
Surface Hole Longitude: -113.260234

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-12-13 Obtained License
1974-12-21 Finished Drilling
1974-12-22 Drill Stem Test Performed
1974-12-23 Production Casing Operation Performed
1975-02-07 Perforation Treatment Performed - Jet Perforation
1975-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-02-15 Perforation Treatment Performed - Jet Perforation
1975-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-18 Well Mode changed to Drilled and Cased
1976-06-09 Well Began Production
1976-06-09 Well Fluid changed to Gas
1976-06-09 Well Mode changed to Flowing
1978-07-01 Well Fluid changed to Gas
1978-07-01 Well Mode changed to Suspended
1995-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-12 Perforation Treatment Performed - Jet Perforation
1995-11-12 Plug Back Performed
1995-11-12 Well Log Performed
1995-11-13 Perforation Treatment Performed - Remedial Casing
1995-11-13 Well Fluid changed to Gas
1995-11-13 Well Mode changed to Abandoned
1995-11-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-02-07 Perforation 1547.80 1548.40 7
1975-02-08 Acid Treatment 1547.80 1548.40 0
1975-02-15 Perforation 1536.80 1538.60 7
1975-02-15 Perforation 1541.70 1545.30 7
1975-02-16 Acid Treatment 1536.80 1545.30 0
1995-11-12 Packing Device Capped w/Cement 1519.00 1527.00 0
1995-11-12 Perforation 422.50 423.50 13
1995-11-13 Remedial Casing Cementing 422.50 423.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 590 0.0 0.0 0.0
1977 2228 0.0 0.0 0.0

For data sources see[5]

References