X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414150614000

Well Details

Well ID: 0414150614000
Loading map...
Location: 00/14-06-041-15W4/0
Location Alias: 00/14-06-41-15 W4M
Location Alias 2: 00/14-06-041-15 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 15
Section: 06
County/Municipality: Flagstaff County
Well Name: CALPINE GALAHAD 14-6-41-15
Operator Name: Calpine Canada Resources Company
License Number: 0084145
License Date: 1980-07-14
License Status: RecCertified
Spud Date: 1980-07-15
Final Drill Date: 1980-07-19
Well Total Depth: 1115.00 m
Surface Hole Latitude: 52.503481
Surface Hole Longitude: -112.157442

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-14 Obtained License
1980-07-18 Drill Stem Test Performed
1980-07-19 Finished Drilling
1980-07-20 Drill Stem Test Performed
1980-07-21 Drill Stem Test Performed
1980-07-22 Drill Stem Test Performed
1980-07-23 Production Casing Operation Performed
1980-07-23 Well Mode changed to Drilled and Cased
1982-05-27 Perforation Treatment Performed - Jet Perforation
1982-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-29 Perforation Treatment Performed - Jet Perforation
1982-09-29 Well Mode changed to Drilled and Cased
1982-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-18 Well Began Production
1984-01-18 Well Fluid changed to Gas
1984-01-18 Well Mode changed to Flowing
1984-04-05 Well Fluid changed to Gas
1984-04-05 Well Mode changed to Suspended
1985-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-31 Well Fluid changed to Gas
1985-07-31 Well Mode changed to Flowing
1985-09-01 Well Fluid changed to Gas
1985-09-01 Well Mode changed to Suspended
1986-09-11 Perforation Treatment Performed - Fractured
1986-09-12 Well Fluid changed to Gas
1986-09-12 Well Mode changed to Flowing
1987-09-17 Well Fluid changed to Gas
1987-09-17 Well Mode changed to Suspended
1989-01-20 Perforation Treatment Performed - Jet Perforation
1989-01-21 Perforation Treatment Performed - Jet Perforation
1989-01-21 Well Log Performed
1992-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-10-02 Perforation Treatment Performed - Jet Perforation
1992-10-02 Plug Back Performed
1992-10-02 Well Fluid changed to Gas
1992-10-02 Well Log Performed
1992-10-02 Well Mode changed to Abandoned Zone
1992-10-03 Perforation Treatment Performed - Remedial Casing
1992-10-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-05-27 Perforation 1092.70 1093.80 7
1989-01-21 Perforation 1061.30 1063.20 13
1992-10-02 Packing Device Capped w/Cement 1069.00 1077.00 0
1992-10-02 Packing Device Capped w/Cement 1050.00 1058.00 0
1992-10-02 Perforation 245.50 246.20 13
1992-10-03 Remedial Casing Cementing 245.50 246.20 0
1982-05-27 Perforation 1094.80 1096.30 7
1982-06-11 Acid Treatment 1092.70 1096.30 0
1982-09-29 Perforation 1079.00 1080.50 7
1982-09-29 Perforation 1081.00 1082.20 7
1982-09-30 Acid Treatment 1079.00 1082.20 0
1985-07-27 Acid Treatment 1079.00 1082.20 0
1986-09-11 Fracture 1079.00 1082.20 0
1989-01-20 Perforation 1084.00 1085.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1759 0.0 0.0 0.0
1985 804 0.0 0.0 0.0
1986 1403 0.0 0.0 0.0
1987 312 0.0 0.0 0.0

For data sources see[5]

References