X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414141107C02

Well Details

Well ID: 0414141107C02
Loading map...
Location: C0/07-11-041-14W4/2
Location Alias: C0/07-11-41-14 W4M
Location Alias 2: C0/07-11-041-14 W4/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 14
Section: 11
County/Municipality: Flagstaff County
Well Name: RENAISSANCE HALKIRK EAST 7C-11-41-14
Operator Name: Husky Oil Operations Limited
License Number: 0149671
License Date: 1991-08-08
License Status: RecCertified
Spud Date: 1991-08-24
Final Drill Date: 1991-08-28
Well Total Depth: 1088.00 m
Surface Hole Latitude: 52.514492
Surface Hole Longitude: -111.911351

For data sources see[1][2]

Well History

Date Event
1991-08-08 Obtained License
1991-08-25 Surface Casing Operation Performed
1991-08-26 Direction Drilling Operation Performed - Deviate
1991-08-28 Finished Drilling
1991-08-28 Well Log Performed
1991-08-28 Well Mode changed to Drilled and Cased
1991-08-29 Well Log Performed
1991-08-30 Production Casing Operation Performed
1991-08-30 Rig Released
1991-09-05 Perforation Treatment Performed - Jet Perforation
1994-05-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-09 Perforation Treatment Performed - Jet Perforation
1994-05-09 Plug Back Performed
1994-07-06 Well Began Production
1994-07-06 Well Fluid changed to Gas
1994-07-06 Well Mode changed to Flowing
1994-11-16 Perforation Treatment Performed - Jet Perforation
1995-05-09 Perforation Treatment Performed - Jet Perforation
1995-05-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-05-10 Plug Back Performed
1995-05-10 Well Abandoned
1995-05-10 Well Fluid changed to Gas
1995-05-10 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-08-26 580.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-09-05 Perforation 1000.00 1002.00 13
1994-05-09 Packing Device Capped w/Cement 996.00 999.00 0
1994-05-09 Perforation 992.50 993.50 17
1994-11-16 Perforation 977.00 978.50 13
1994-11-16 Perforation 988.00 989.00 13
1994-11-16 Perforation 993.50 994.50 13
1995-05-09 Perforation 968.00 969.00 13
1995-05-10 Packing Device Capped w/Cement 973.00 975.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 4026 0.0 0.0 0.0
1995 2968 0.0 0.0 0.0

For data sources see[6]

References