X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414132109000

Well Details

Well ID: 0414132109000
Loading map...
Location: 00/09-21-041-13W4/0
Location Alias: 00/09-21-41-13 W4M
Location Alias 2: 00/09-21-041-13 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 13
Section: 21
County/Municipality: Flagstaff County
Well Name: SLE KILLAM 9-21-41-13
Operator Name: SanLing Energy Ltd.
License Number: 0202277
License Date: 1997-06-05
License Status: Suspension
Spud Date: 1997-07-21
Final Drill Date: 1997-07-26
Well Total Depth: 1105.00 m
Surface Hole Latitude: 52.547229
Surface Hole Longitude: -111.809156

For data sources see[1][2]

Well History

Date Event
1997-06-05 Obtained License
1997-07-22 Surface Casing Operation Performed
1997-07-23 Direction Drilling Operation Performed - Deviate
1997-07-26 Finished Drilling
1997-07-26 Well Log Performed
1997-07-26 Well Mode changed to Drilled and Cased
1997-07-27 Production Casing Operation Performed
1997-07-27 Rig Released
1997-09-26 Perforation Treatment Performed - Jet Perforation
1997-09-26 Well Log Performed
1997-12-27 Well Began Production
1997-12-27 Well Fluid changed to Gas
1997-12-27 Well Mode changed to Flowing
2001-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-30 Perforation Treatment Performed - Jet Perforation
2001-10-30 Plug Back Performed
2001-10-30 Well Fluid changed to Gas
2001-10-30 Well Mode changed to Abandoned Zone
2001-10-31 Well Log Performed
2004-12-17 Well Log Performed
2017-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-05-26 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-07-23 251.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-09-26 Perforation 997.00 999.00 14
1997-09-26 Perforation 1000.50 1002.50 14
2001-10-30 Packing Device Capped w/Cement 982.00 990.00 0
2001-10-30 Perforation 833.50 835.50 17
2017-05-26 Packing Device Capped w/Cement 817.00 825.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 170 0.0 0.0 0.0
1998 8255 0.0 0.0 0.0
1999 8655 0.0 0.0 0.0
2000 7649 0.0 0.0 0.0
2001 24 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-05-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References