X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414131909003

Well Details

Well ID: 0414131909003
Loading map...
Location: 00/09-19-041-13W4/3
Location Alias: 00/09-19-41-13 W4M
Location Alias 2: 00/09-19-041-13 W4/03
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 13
Section: 19
County/Municipality: Flagstaff County
Well Name: CPEC KILLAM 9-19-41-13
Operator Name: Crescent Point Energy Corp.
License Number: 0221817
License Date: 1999-02-26
License Status: Abandoned
Spud Date: 1999-03-05
Final Drill Date: 1999-03-14
Well Total Depth: 1000.00 m
Surface Hole Latitude: 52.545186
Surface Hole Longitude: -111.853240

For data sources see[1][2]

Well History

Date Event
1999-02-26 Obtained License
1999-03-05 Surface Casing Operation Performed
1999-03-14 Finished Drilling
1999-03-14 Well Mode changed to Drilled and Cased
1999-03-15 Production Casing Operation Performed
1999-03-15 Well Log Performed
1999-03-16 Rig Released
1999-05-04 Perforation Treatment Performed - Jet Perforation
1999-05-05 Well Log Performed
2000-07-06 Perforation Treatment Performed - Jet Perforation
2000-07-07 Well Log Performed
2000-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-01 Plug Back Performed
2000-11-02 Perforation Treatment Performed - Jet Perforation
2000-11-03 Well Log Performed
2002-11-01 Perforation Treatment Performed - Jet Perforation
2002-11-01 Well Log Performed
2005-11-17 Perforation Treatment Performed - Jet Perforation
2005-11-22 Perforation Treatment Performed - Jet Perforation
2006-04-27 Well Began Production
2006-04-27 Well Fluid changed to Gas
2006-04-27 Well Mode changed to Flowing
2006-09-07 Perforation Treatment Performed - Cement Squeeze
2006-09-07 Plug Back Performed
2006-09-07 Well Fluid changed to Gas
2006-09-07 Well Mode changed to Abandoned Zone
2008-05-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-05-10 Plug Back Performed
2008-05-12 Well Abandoned
2008-05-12 Well Fluid changed to Gas
2008-05-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-05-04 Perforation 939.50 943.00 14
2008-05-10 Packing Device Capped w/Cement 917.00 938.00 0
2008-05-10 Packing Device Capped w/Cement 772.00 780.00 0
2000-07-06 Perforation 944.00 946.00 17
2000-11-01 Packing Device Capped w/Cement 915.00 925.00 0
2000-11-02 Perforation 797.00 800.00 17
2002-11-01 Perforation 790.00 797.00 20
2005-11-17 Perforation 939.50 943.00 20
2005-11-17 Perforation 944.00 946.00 20
2005-11-22 Perforation 932.00 933.50 20
2006-09-07 Cement Squeeze 932.00 933.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 1907 0.0 0.0 0.0

For data sources see[5]

References