X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414121616030

Well Details

Well ID: 0414121616030
Loading map...
Location: 03/16-16-041-12W4/0
Location Alias: 03/16-16-41-12 W4M
Location Alias 2: 03/16-16-041-12 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 12
Section: 16
County/Municipality: Flagstaff County
Well Name: VIKING UNIT A3 BELL 16-16-41-12
Operator Name: Harvest Operations Corp.
License Number: 0154334
License Date: 1992-11-02
License Status: Issued
Spud Date: 1992-11-25
Final Drill Date: 1992-11-28
Well Total Depth: 988.00 m
Surface Hole Latitude: 52.533224
Surface Hole Longitude: -111.659302

For data sources see[1][2]

Well History

Date Event
1992-11-02 Obtained License
1992-11-26 Direction Drilling Operation Performed - Deviate
1992-11-26 Surface Casing Operation Performed
1992-11-26 Well Log Performed
1992-11-28 Finished Drilling
1992-11-28 Well Log Performed
1992-11-28 Well Mode changed to Drilled and Cased
1992-11-29 Production Casing Operation Performed
1992-11-29 Rig Released
1992-12-04 Well Log Performed
1992-12-07 Perforation Treatment Performed - Jet Perforation
1992-12-07 Well Log Performed
1993-01-01 Well Began Production
1993-01-01 Well Fluid changed to Crude Oil
1993-01-01 Well Mode changed to Pumping
2010-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-30 Perforation Treatment Performed - Jet Perforation
2010-06-30 Well Log Performed
2010-07-27 Plug Back Performed
2010-07-27 Well Fluid changed to Crude Oil
2010-07-27 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-11-26 185.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-12-07 Perforation 942.50 945.50 18
2010-06-30 Perforation 866.00 871.00 17
2010-06-30 Perforation 873.00 875.00 17
2010-06-30 Packing Device Capped w/Cement 923.80 933.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 8620 0.0 0.0 0.0
1994 8635 0.0 0.0 0.0
1995 8707 0.0 0.0 0.0
1996 8695 0.0 0.0 0.0
1997 8661 0.0 0.0 0.0
1998 8726 0.0 0.0 0.0
1999 8719 0.0 0.0 0.0
2000 8748 0.0 0.0 0.0
2001 8725 0.0 0.0 0.0
2002 8555 0.0 0.0 0.0
2003 8475 0.0 0.0 0.0
2004 8682 0.0 0.0 0.0
2005 8444 0.0 0.0 0.0
2006 8565 0.0 0.0 0.0
2007 8639 0.0 0.0 0.0
2008 8662 0.0 0.0 0.0
2009 8561 0.0 0.0 0.0
2010 4197 0.0 0.0 0.0

For data sources see[6]

References