X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414121511000

Well Details

Well ID: 0414121511000
Loading map...
Location: 00/11-15-041-12W4/0
Location Alias: 00/11-15-41-12 W4M
Location Alias 2: 00/11-15-041-12 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 12
Section: 15
County/Municipality: Flagstaff County
Well Name: VIKING BELL 11-15-41-12
Operator Name: Harvest Operations Corp.
License Number: 0015628
License Date: 1958-07-23
License Status: Suspension
Spud Date: 1958-07-23
Final Drill Date: 1958-07-27
Well Total Depth: 963.20 m
Surface Hole Latitude: 52.530695
Surface Hole Longitude: -111.650963

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-07-23 Obtained License
1958-07-27 Finished Drilling
1958-07-27 Well Mode changed to Drilled and Cased
1958-07-28 Production Casing Operation Performed
1958-07-31 Perforation Treatment Performed - Bullet Perforation
1958-08-08 Well Began Production
1958-08-08 Well Fluid changed to Crude Oil
1958-08-08 Well Mode changed to Pumping
1959-08-26 Perforation Treatment Performed - Cement Squeeze
1959-08-28 Perforation Treatment Performed - Jet Perforation
1990-09-01 Well Fluid changed to Crude Oil
1990-09-01 Well Mode changed to Suspended
2007-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-19 Plug Back Performed
2007-11-19 Well Fluid changed to Crude Oil
2007-11-19 Well Log Performed
2007-11-19 Well Mode changed to Abandoned Zone
2007-12-06 Well Log Performed
2008-04-19 Perforation Treatment Performed - Jet Perforation
2008-04-19 Well Log Performed
2008-04-20 Perforation Treatment Performed - Remedial Casing
2008-04-21 Perforation Treatment Performed - Jet Perforation
2008-04-21 Well Log Performed
2008-04-22 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-07-31 Bullet Perforation 937.60 940.60 3
1959-08-26 Cement Squeeze 937.60 940.60 0
1959-08-28 Perforation 941.20 942.40 13
2007-11-19 Packing Device Capped w/Cement 926.00 934.00 0
2008-04-19 Perforation 367.00 368.00 14
2008-04-20 Remedial Casing Cementing 367.00 368.00 0
2008-04-21 Perforation 239.00 240.00 14
2008-04-22 Remedial Casing Cementing 239.00 240.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5639 0.0 0.0 0.0
1968 2352 0.0 0.0 0.0
1969 2700 0.0 0.0 0.0
1970 6767 0.0 0.0 0.0
1971 6701 0.0 0.0 0.0
1972 24 0.0 0.0 0.0
1974 7308 0.0 0.0 0.0
1975 7490 0.0 0.0 0.0
1976 7814 0.0 0.0 0.0
1977 8423 0.0 0.0 0.0
1978 8246 0.0 0.0 0.0
1979 8612 0.0 0.0 0.0
1980 8580 0.0 0.0 0.0
1981 8377 0.0 0.0 0.0
1982 7888 0.0 0.0 0.0
1983 8315 0.0 0.0 0.0
1984 8606 0.0 0.0 0.0
1985 7823 0.0 0.0 0.0
1986 8649 0.0 0.0 0.0
1987 8256 0.0 0.0 0.0
1988 8749 0.0 0.0 0.0
1989 8717 0.0 0.0 0.0
1990 5547 0.0 0.0 0.0

For data sources see[5]

References