X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414022215030

Well Details

Well ID: 0414022215030
Loading map...
Location: 03/15-22-041-02W4/0
Location Alias: 03/15-22-41-02 W4M
Location Alias 2: 03/15-22-041-02 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 02
Section: 22
County/Municipality: Municipal District of Wainwright No. 61
Well Name: PIONEER CANADA 15D HAYTER 15-22-41-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0162783
License Date: 1993-12-02
License Status: RecCertified
Spud Date: 1993-12-09
Final Drill Date: 1993-12-11
Well Total Depth: 804.00 m
Surface Hole Latitude: 52.549375
Surface Hole Longitude: -110.205011

For data sources see[1][2]

Well History

Date Event
1993-12-02 Obtained License
1993-12-10 Surface Casing Operation Performed
1993-12-11 Finished Drilling
1993-12-11 Well Log Performed
1993-12-11 Well Mode changed to Drilled and Cased
1993-12-12 Production Casing Operation Performed
1993-12-12 Rig Released
1993-12-17 Well Log Performed
1993-12-18 Perforation Treatment Performed - Jet Perforation
1993-12-18 Well Log Performed
1993-12-19 Perforation Treatment Performed - Jet Perforation
1993-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-19 Perforation Treatment Performed - Jet Perforation
1994-05-31 Well Began Production
1994-05-31 Well Fluid changed to Crude Oil
1994-05-31 Well Mode changed to Pumping
1998-05-15 Well Fluid changed to Crude Oil
1998-05-15 Well Log Performed
1998-05-15 Well Mode changed to Abandoned Zone
1998-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-16 Plug Back Performed
1998-05-16 Well Log Performed
1998-10-26 Well Log Performed
1998-11-12 Well Log Performed
1998-11-16 Well Abandoned
1998-11-16 Well Fluid changed to Crude Oil
1998-11-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-12-18 Perforation 726.50 730.00 13
1993-12-19 Perforation 732.00 734.50 13
1993-12-22 Acid Treatment 726.50 734.50 0
1994-05-19 Perforation 737.00 738.00 13
1994-05-19 Perforation 737.50 738.50 13
1998-05-16 Packing Device Capped w/Cement 715.00 723.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 3372 0.0 0.0 0.0

For data sources see[5]

References