X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414012903D20

Well Details

Well ID: 0414012903D20
Loading map...
Location: D2/03-29-041-01W4/0
Location Alias: D2/03-29-41-01 W4M
Location Alias 2: D2/03-29-041-01 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 29
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HARVEST 3D DI HAYTER 3-29-41-1
Operator Name: Harvest Operations Corp.
License Number: 0153142
License Date: 1992-07-21
License Status: Suspension
Spud Date: 1992-07-24
Final Drill Date: 1992-07-27
Well Total Depth: 805.00 m
Surface Hole Latitude: 52.553893
Surface Hole Longitude: -110.114959

For data sources see[1][2]

Well History

Date Event
1992-07-21 Obtained License
1992-07-25 Direction Drilling Operation Performed - Deviate
1992-07-25 Surface Casing Operation Performed
1992-07-27 Finished Drilling
1992-07-27 Well Log Performed
1992-07-27 Well Mode changed to Drilled and Cased
1992-07-28 Production Casing Operation Performed
1992-07-28 Rig Released
1992-07-30 Perforation Treatment Performed - Jet Perforation
1992-08-01 Well Began Production
1992-08-01 Well Fluid changed to Crude Oil
1992-08-01 Well Mode changed to Pumping
1992-08-04 Well Log Performed
2001-07-20 Well Fluid changed to Crude Oil
2001-07-20 Well Mode changed to Suspended
2009-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-07 Perforation Treatment Performed - Jet Perforation
2009-01-07 Plug Back Performed
2009-01-07 Well Fluid changed to Crude Oil
2009-01-07 Well Log Performed
2009-01-07 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-07-25 233.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-07-30 Perforation 769.00 772.00 13
2009-01-07 Packing Device Capped w/Cement 752.00 760.00 0
2009-01-07 Perforation 725.00 726.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 3578 0.0 0.0 0.0
1993 8711 0.0 0.0 0.0
1994 8646 0.0 0.0 0.0
1995 8699 0.0 0.0 0.0
1996 8595 0.0 0.0 0.0
1997 8702 0.0 0.0 0.0
1998 8602 0.0 0.0 0.0
1999 8247 0.0 0.0 0.0
2000 8146 0.0 0.0 0.0
2001 3182 0.0 0.0 0.0

For data sources see[6]

References