X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414012813000

Well Details

Well ID: 0414012813000
Loading map...
Location: 00/13-28-041-01W4/0
Location Alias: 00/13-28-41-01 W4M
Location Alias 2: 00/13-28-041-01 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 28
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HARVEST ET AL 13B HAYTER 13-28-41-1
Operator Name: Harvest Operations Corp.
License Number: 0093362
License Date: 1981-11-17
License Status: Suspension
Spud Date: 1981-12-02
Final Drill Date: 1981-12-05
Well Total Depth: 830.00 m
Surface Hole Latitude: 52.562476
Surface Hole Longitude: -110.098956

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-11-17 Obtained License
1981-12-05 Finished Drilling
1981-12-05 Well Log Performed
1981-12-05 Well Mode changed to Drilled and Cased
1981-12-06 Drill Stem Test Performed
1981-12-07 Production Casing Operation Performed
1981-12-11 Perforation Treatment Performed - Jet Perforation
1981-12-14 Well Began Production
1981-12-14 Well Fluid changed to Crude Oil
1981-12-14 Well Mode changed to Pumping
1982-01-12 Perforation Treatment Performed - Jet Perforation
1990-11-09 Well Log Performed
1990-11-16 Perforation Treatment Performed - Cement Squeeze
1990-11-16 Plug Back Performed
1990-11-16 Well Fluid changed to Crude Oil
1990-11-16 Well Mode changed to Abandoned Zone
1990-11-19 Well Log Performed
1990-11-20 Perforation Treatment Performed - Jet Perforation
1990-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-03 Perforation Treatment Performed - Fractured
1991-09-13 Perforation Treatment Performed - Acid Wash - No Pressure
1991-09-17 Perforation Treatment Performed - Acid Wash - No Pressure
1992-01-02 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-12-11 Perforation 757.00 760.00 14
1982-01-12 Perforation 756.50 760.50 13
1990-11-16 Cement Squeeze 756.50 760.50 0
1990-11-20 Perforation 770.00 799.00 13
1990-12-31 Acid Treatment 770.00 799.00 0
1991-06-03 Fracture 770.00 799.00 0
1991-09-13 Acid Wash 770.00 799.00 0
1991-09-17 Acid Wash 770.00 799.00 0
1992-01-02 Chemical Squeeze 770.00 799.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 432 0.0 0.0 0.0
1982 6288 0.0 0.0 0.0
1983 8757 0.0 0.0 0.0
1984 8687 0.0 0.0 0.0
1985 7560 0.0 0.0 0.0
1986 1488 0.0 0.0 0.0
1987 3292 0.0 0.0 0.0
1988 312 0.0 0.0 0.0

For data sources see[5]

References