X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414012016000

Well Details

Well ID: 0414012016000
Loading map...
Location: 00/16-20-041-01W4/0
Location Alias: 00/16-20-41-01 W4M
Location Alias 2: 00/16-20-041-01 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 20
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HARVEST PETMT HAYTER 16-20-41-1
Operator Name: Harvest Operations Corp.
License Number: 0087478
License Date: 1980-12-05
License Status: Suspension
Spud Date: 1980-12-11
Final Drill Date: 1980-12-14
Well Total Depth: 888.00 m
Surface Hole Latitude: 52.548278
Surface Hole Longitude: -110.104182

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-12-05 Obtained License
1980-12-14 Finished Drilling
1980-12-14 Well Mode changed to Drilled and Cased
1980-12-15 Drill Stem Test Performed
1980-12-16 Drill Stem Test Performed
1980-12-17 Production Casing Operation Performed
1981-02-16 Perforation Treatment Performed - Cement Squeeze
1981-02-16 Perforation Treatment Performed - Jet Perforation
1981-02-17 Perforation Treatment Performed - Jet Perforation
1981-05-13 Well Began Production
1981-05-13 Well Fluid changed to Crude Oil
1981-05-13 Well Mode changed to Pumping
1990-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-11-15 Plug Back Performed
1990-11-15 Well Fluid changed to Crude Oil
1990-11-15 Well Mode changed to Abandoned and Re-entered
1990-11-16 Well Log Performed
1992-05-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-06 Perforation Treatment Performed - Jet Perforation
1994-02-14 Perforation Treatment Performed - Jet Perforation
1994-02-19 Perforation Treatment Performed - Jet Perforation
1994-02-21 Perforation Treatment Performed - Cement Squeeze
1994-02-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-02-16 Perforation 816.00 817.00 7
1992-05-06 Perforation 285.00 286.00 13
1992-05-06 Packing Device Capped w/Cement 270.00 278.00 0
1994-02-14 Perforation 285.00 286.00 13
1994-02-19 Perforation 816.00 817.00 7
1994-02-19 Perforation 818.00 821.50 7
1994-02-19 Perforation 822.00 824.00 7
1994-02-21 Cement Squeeze 285.00 824.00 0
1981-02-16 Perforation 818.00 821.50 7
1981-02-16 Perforation 822.00 824.00 7
1981-02-16 Perforation 825.50 827.50 7
1981-02-16 Cement Squeeze 816.00 827.50 0
1981-02-17 Perforation 816.00 817.00 7
1981-02-17 Perforation 818.00 821.50 7
1981-02-17 Perforation 822.00 824.00 7
1990-11-15 Packing Device Capped w/Cement 810.00 818.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 4831 0.0 0.0 0.0
1982 4663 0.0 0.0 0.0
1983 5230 0.0 0.0 0.0
1984 8142 0.0 0.0 0.0
1985 7429 0.0 0.0 0.0
1986 7597 0.0 0.0 0.0
1988 96 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References