X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414012015000

Well Details

Well ID: 0414012015000
Loading map...
Location: 00/15-20-041-01W4/0
Location Alias: 00/15-20-41-01 W4M
Location Alias 2: 00/15-20-041-01 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 20
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HARVEST ET AL HAYTER 15-20-41-1
Operator Name: Harvest Operations Corp.
License Number: 0094864
License Date: 1982-02-01
License Status: Suspension
Spud Date: 1982-02-03
Final Drill Date: 1982-02-13
Well Total Depth: 860.00 m
Surface Hole Latitude: 52.548545
Surface Hole Longitude: -110.110581

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-02-01 Obtained License
1982-02-06 Lost Circulation Occurred
1982-02-13 Finished Drilling
1982-02-13 Well Mode changed to Drilled and Cased
1982-02-14 Production Casing Operation Performed
1982-02-18 Perforation Treatment Performed - Jet Perforation
1982-02-20 Perforation Treatment Performed - Cement Squeeze
1982-02-20 Perforation Treatment Performed - Jet Perforation
1982-02-25 Perforation Treatment Performed - Jet Perforation
1982-02-26 Perforation Treatment Performed - Cement Squeeze
1982-03-03 Perforation Treatment Performed - Jet Perforation
1982-03-06 Perforation Treatment Performed - Jet Perforation
1982-04-28 Well Began Production
1982-04-28 Well Fluid changed to Crude Oil
1982-04-28 Well Mode changed to Pumping
2011-07-01 Well Fluid changed to Crude Oil
2011-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-02-18 Perforation 798.00 800.50 13
1982-02-20 Perforation 809.00 810.50 13
1982-02-20 Perforation 807.50 808.00 13
1982-02-20 Cement Squeeze 807.50 810.50 0
1982-02-25 Perforation 805.00 806.00 13
1982-02-26 Cement Squeeze 805.00 806.00 0
1982-03-03 Perforation 798.00 800.50 13
1982-03-06 Perforation 710.50 711.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 5716 0.0 0.0 0.0
1983 5921 0.0 0.0 0.0
1984 7928 0.0 0.0 0.0
1985 8480 0.0 0.0 0.0
1986 8714 0.0 0.0 0.0
1987 8436 0.0 0.0 0.0
1988 8680 0.0 0.0 0.0
1989 8624 0.0 0.0 0.0
1990 8493 0.0 0.0 0.0
1991 8645 0.0 0.0 0.0
1992 8668 0.0 0.0 0.0
1993 8687 0.0 0.0 0.0
1994 8578 0.0 0.0 0.0
1995 8662 0.0 0.0 0.0
1996 8700 0.0 0.0 0.0
1997 8704 0.0 0.0 0.0
1998 8653 0.0 0.0 0.0
1999 8729 0.0 0.0 0.0
2000 8711 0.0 0.0 0.0
2001 8724 0.0 0.0 0.0
2002 8687 0.0 0.0 0.0
2003 8703 0.0 0.0 0.0
2004 8774 0.0 0.0 0.0
2005 8725 0.0 0.0 0.0
2006 3006 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-02-06 Lost Circulation 620.00 620.00

For data sources see[6]

References