If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414012013D00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.549782,"lon":-110.12145,"icon":""}]} |
Location: D0/13-20-041-01W4/0 | |
Location Alias: D0/13-20-41-01 W4M | |
Location Alias 2: D0/13-20-041-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 01 | |
Section: 20 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: HARVEST 13D DI HAYTER 13-20-41-1 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0145351 | |
License Date: 1990-09-11 | |
License Status: Suspension | |
Spud Date: 1990-10-04 | |
Final Drill Date: 1990-10-05 | |
Well Total Depth: 805.00 m | |
Surface Hole Latitude: 52.549782 | |
Surface Hole Longitude: -110.121450 |
Date | Event |
---|---|
1990-09-11 | Obtained License |
1990-10-04 | Surface Casing Operation Performed |
1990-10-05 | Finished Drilling |
1990-10-05 | Well Mode changed to Drilled and Cased |
1990-10-06 | Production Casing Operation Performed |
1990-10-06 | Rig Released |
1990-10-06 | Well Log Performed |
1990-10-10 | Perforation Treatment Performed - Jet Perforation |
1990-10-13 | Well Began Production |
1990-10-13 | Well Fluid changed to Crude Oil |
1990-10-13 | Well Mode changed to Pumping |
2000-08-29 | Well Fluid changed to Crude Oil |
2000-08-29 | Well Mode changed to Suspended |
2011-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-09 | Plug Back Performed |
2011-03-09 | Well Fluid changed to Crude Oil |
2011-03-09 | Well Log Performed |
2011-03-09 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-10-10 | Perforation | 745.00 | 747.00 | 13 |
2011-03-09 | Packing Device Capped w/Cement | 728.00 | 738.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 1901 | 0.0 | 0.0 | 0.0 |
1991 | 8591 | 0.0 | 0.0 | 0.0 |
1992 | 8689 | 0.0 | 0.0 | 0.0 |
1993 | 8651 | 0.0 | 0.0 | 0.0 |
1994 | 8700 | 0.0 | 0.0 | 0.0 |
1995 | 8713 | 0.0 | 0.0 | 0.0 |
1996 | 8661 | 0.0 | 0.0 | 0.0 |
1997 | 8684 | 0.0 | 0.0 | 0.0 |
1998 | 8672 | 0.0 | 0.0 | 0.0 |
1999 | 8583 | 0.0 | 0.0 | 0.0 |
2000 | 3705 | 0.0 | 0.0 | 0.0 |
For data sources see[5]