X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414012009030

Well Details

Well ID: 0414012009030
Loading map...
Location: 03/09-20-041-01W4/0
Location Alias: 03/09-20-41-01 W4M
Location Alias 2: 03/09-20-041-01 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 20
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HARVEST ET AL 9C HAYTER 9-20-41-1
Operator Name: Harvest Operations Corp.
License Number: 0110087
License Date: 1984-10-19
License Status: Suspension
Spud Date: 1984-11-13
Final Drill Date: 1984-11-16
Well Total Depth: 850.00 m
Surface Hole Latitude: 52.546357
Surface Hole Longitude: -110.105693

For data sources see[1][2]

Well History

Date Event
1984-10-19 Obtained License
1984-11-14 Surface Casing Operation Performed
1984-11-16 Finished Drilling
1984-11-16 Production Casing Operation Performed
1984-11-16 Well Log Performed
1984-11-16 Well Mode changed to Drilled and Cased
1984-11-17 Rig Released
1984-11-25 Well Began Production
1984-11-25 Well Fluid changed to Crude Oil
1984-11-25 Well Mode changed to Pumping
1984-12-06 Perforation Treatment Performed - Jet Perforation
1988-10-01 Well Fluid changed to Crude Oil
1988-10-01 Well Mode changed to Suspended
1990-03-01 Well Began Injection
1990-03-01 Well Fluid changed to Water
1990-03-01 Well Type changed to Injection
1990-03-23 Perforation Treatment Performed - Cement Squeeze
1990-03-25 Perforation Treatment Performed - Jet Perforation
1990-03-25 Well Log Performed
1990-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-13 Well Log Performed
2001-06-18 Perforation Treatment Performed - Jet Perforation
2001-06-18 Well Log Performed
2001-06-21 Well Log Performed
2019-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-19 Plug Back Performed
2019-10-19 Well Fluid changed to Water
2019-10-19 Well Mode changed to Abandoned Zone
2019-10-19 Well Type changed to Injection
2019-10-20 Perforation Treatment Performed - Jet Perforation
2019-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-21 Perforation Treatment Performed - Cement Squeeze
2019-10-21 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-12-06 Perforation 819.00 823.00 13
1990-03-23 Cement Squeeze 819.00 823.00 0
1990-03-25 Perforation 839.00 844.00 20
1990-03-26 Acid Treatment 839.00 844.00 0
2001-06-18 Perforation 840.50 846.50 20
2019-10-19 Packing Device Capped w/Cement 800.00 810.00 0
2019-10-20 Perforation 301.00 302.00 17
2019-10-21 Cement Squeeze 301.00 302.00 0
2019-10-21 Packing Device Capped w/Cement 262.00 297.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 880 0.0 0.0 0.0
1985 8413 0.0 0.0 0.0
1986 8677 0.0 0.0 0.0
1987 6923 0.0 0.0 0.0
1988 1350 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References