If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414010414000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.506458,"lon":-110.094504,"icon":""}]} |
Location: 00/14-04-041-01W4/0 | |
Location Alias: 00/14-04-41-01 W4M | |
Location Alias 2: 00/14-04-041-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 01 | |
Section: 04 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: ALTAVISTA ET AL HAYTER 14-4-41-1 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0117749 | |
License Date: 1985-09-19 | |
License Status: RecCertified | |
Spud Date: 1985-10-25 | |
Final Drill Date: 1985-10-27 | |
Well Total Depth: 871.00 m | |
Surface Hole Latitude: 52.506458 | |
Surface Hole Longitude: -110.094504 |
Date | Event |
---|---|
1985-09-19 | Obtained License |
1985-10-25 | Surface Casing Operation Performed |
1985-10-27 | Finished Drilling |
1985-10-27 | Well Log Performed |
1985-10-27 | Well Mode changed to Drilled and Cased |
1985-10-28 | Production Casing Operation Performed |
1985-10-28 | Rig Released |
1985-11-07 | Perforation Treatment Performed - Jet Perforation |
1985-11-15 | Well Began Production |
1985-11-15 | Well Fluid changed to Crude Oil |
1985-11-15 | Well Mode changed to Pumping |
1986-12-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-12-10 | Plug Back Performed |
1986-12-10 | Well Fluid changed to Crude Oil |
1986-12-10 | Well Log Performed |
1986-12-10 | Well Mode changed to Abandoned Zone |
1986-12-11 | Perforation Treatment Performed - Jet Perforation |
1986-12-12 | Perforation Treatment Performed - Fractured |
1990-05-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-05-01 | Plug Back Performed |
1990-05-02 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-11-07 | Perforation | 854.00 | 855.00 | 13 |
1985-11-07 | Perforation | 855.80 | 856.80 | 13 |
1985-11-07 | Perforation | 857.50 | 858.50 | 13 |
1986-12-10 | Packing Device Capped w/Cement | 837.00 | 845.00 | 0 |
1986-12-11 | Perforation | 806.50 | 809.00 | 13 |
1986-12-12 | Fracture | 806.50 | 809.00 | 0 |
1990-05-01 | Packing Device Capped w/Cement | 791.00 | 800.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 1148 | 0.0 | 0.0 | 0.0 |
1986 | 6379 | 0.0 | 0.0 | 0.0 |
For data sources see[5]