If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0405091210000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.430912,"lon":-115.161016,"icon":""}]} |
Location: 00/10-12-040-09W5/0 | |
Location Alias: 00/10-12-40-09 W5M | |
Location Alias 2: 00/10-12-040-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 5 | |
Range: 09 | |
Section: 12 | |
County/Municipality: Clearwater County | |
Well Name: AMOCO FERRIER 10-12-40-9 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0056151 | |
License Date: 1975-12-09 | |
License Status: RecCertified | |
Spud Date: 1975-12-13 | |
Final Drill Date: 1976-01-24 | |
Well Total Depth: 2657.90 m | |
Surface Hole Latitude: 52.430912 | |
Surface Hole Longitude: -115.161016 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-12-09 | Obtained License |
1976-01-12 | Drill Stem Test Performed |
1976-01-16 | Drill Stem Test Performed |
1976-01-23 | Drill Stem Test Performed |
1976-01-24 | Finished Drilling |
1976-01-27 | Production Casing Operation Performed |
1976-01-28 | Well Mode changed to Drilled and Cased |
1976-03-04 | Perforation Treatment Performed - Jet Perforation |
1976-03-04 | Well Log Performed |
1976-03-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-03-05 | Perforation Treatment Performed - Fractured |
1982-01-06 | Well Began Production |
1982-01-06 | Well Fluid changed to Crude Oil |
1982-01-06 | Well Mode changed to Flowing |
1982-06-21 | Well Fluid changed to Crude Oil |
1982-06-21 | Well Mode changed to Suspended |
1991-12-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-12-22 | Plug Back Performed |
1991-12-22 | Well Fluid changed to Crude Oil |
1991-12-22 | Well Log Performed |
1991-12-22 | Well Mode changed to Abandoned |
1992-01-04 | Perforation Treatment Performed - Jet Perforation |
1992-01-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-01-05 | Perforation Treatment Performed - Remedial Casing |
1992-01-06 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-03-04 | Perforation | 2301.80 | 2306.40 | 3 |
1976-03-05 | Acid Treatment | 2301.80 | 2306.40 | 0 |
1976-03-05 | Fracture | 2301.80 | 2306.40 | 0 |
1991-12-22 | Packing Device Capped w/Cement | 2289.00 | 2297.00 | 0 |
1992-01-04 | Perforation | 315.00 | 315.30 | 54 |
1992-01-05 | Remedial Casing Cementing | 315.00 | 315.30 | 0 |
1992-01-05 | Packing Device Capped w/Cement | 298.00 | 310.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 3905 | 0.0 | 0.0 | 0.0 |
1991 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]