If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0405060303000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.420333,"lon":-114.782298,"icon":""}]} |
Location: 00/03-03-040-06W5/0 | |
Location Alias: 00/03-03-40-06 W5M | |
Location Alias 2: 00/03-03-040-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 5 | |
Range: 06 | |
Section: 03 | |
County/Municipality: Clearwater County | |
Well Name: HARVEST HZ WILLGR 3-3-40-6 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0434472 | |
License Date: 2011-06-20 | |
License Status: Issued | |
Spud Date: 2011-10-27 | |
Final Drill Date: 2011-11-07 | |
Well Total Depth: 3459.00 m | |
Surface Hole Latitude: 52.420333 | |
Surface Hole Longitude: -114.782298 |
Date | Event |
---|---|
2011-06-20 | Obtained License |
2011-10-28 | Surface Casing Operation Performed |
2011-10-31 | Well Log Performed |
2011-11-01 | Direction Drilling Operation Performed - Deviate |
2011-11-03 | Direction Drilling Operation Performed - Horizontal |
2011-11-04 | Intermediate Casing Operation Performed |
2011-11-07 | Finished Drilling |
2011-11-07 | Well Log Performed |
2011-11-07 | Well Mode changed to Drilled and Cased |
2011-11-09 | Liner Casing Operation Performed |
2011-11-09 | Perforation Treatment Performed - Open-Hole Completion |
2011-11-09 | Rig Released |
2012-01-15 | Well Log Performed |
2012-01-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-23 | Well Began Production |
2012-03-23 | Well Fluid changed to Gas |
2012-03-23 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-01 | 2158.00 | Deviate (5 - 79 degrees) |
2011-11-03 | 2474.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-09 | Open Hole/Barefoot Completion | 3450.00 | 3459.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 2686.50 | 2686.60 | 0 |
2012-01-26 | Multi-Stage Fracture | 2572.40 | 2572.50 | 0 |
2012-01-19 | Multi-Stage Fracture | 3445.80 | 3445.90 | 0 |
2012-01-19 | Multi-Stage Fracture | 3384.90 | 3385.00 | 0 |
2012-01-19 | Multi-Stage Fracture | 3283.20 | 3283.30 | 0 |
2012-01-19 | Multi-Stage Fracture | 3181.40 | 3181.50 | 0 |
2012-01-21 | Multi-Stage Fracture | 3079.70 | 3079.80 | 0 |
2012-01-21 | Multi-Stage Fracture | 2991.80 | 2991.90 | 0 |
2012-01-21 | Multi-Stage Fracture | 2890.00 | 2890.10 | 0 |
2012-01-21 | Multi-Stage Fracture | 2788.20 | 2788.30 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6443 | 0.0 | 0.0 | 0.0 |
2013 | 7584 | 0.0 | 0.0 | 0.0 |
2014 | 8543 | 0.0 | 0.0 | 0.0 |
2015 | 7776 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8399 | 0.0 | 0.0 | 0.0 |
2018 | 8663 | 0.0 | 0.0 | 0.0 |
2019 | 8088 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]