If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0405042006030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.456958,"lon":-114.544481,"icon":""}]} |
Location: 03/06-20-040-04W5/0 | |
Location Alias: 03/06-20-40-04 W5M | |
Location Alias 2: 03/06-20-040-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 5 | |
Range: 04 | |
Section: 20 | |
County/Municipality: Clearwater County | |
Well Name: HARVEST GILBY 6-20-40-4 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0159468 | |
License Date: 1993-06-25 | |
License Status: Abandoned | |
Spud Date: 1993-07-14 | |
Final Drill Date: 1993-07-19 | |
Well Total Depth: 1850.00 m | |
Surface Hole Latitude: 52.456958 | |
Surface Hole Longitude: -114.544481 |
Date | Event |
---|---|
1993-06-25 | Obtained License |
1993-07-16 | Surface Casing Operation Performed |
1993-07-19 | Finished Drilling |
1993-07-19 | Well Mode changed to Drilled and Cased |
1993-07-20 | Well Log Performed |
1993-07-21 | Drill Stem Test Performed |
1993-07-22 | Production Casing Operation Performed |
1993-07-22 | Rig Released |
1993-08-11 | Well Log Performed |
1993-08-12 | Perforation Treatment Performed - Jet Perforation |
1993-08-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-08-13 | Perforation Treatment Performed - Fractured |
1993-09-21 | Well Began Production |
1993-09-21 | Well Fluid changed to Gas |
1993-09-21 | Well Mode changed to Flowing |
2004-08-10 | Perforation Treatment Performed - Fractured |
2004-12-07 | Perforation Treatment Performed - Chemical Squeeze |
2005-01-01 | Well Fluid changed to Gas |
2005-01-01 | Well Mode changed to Suspended |
2016-10-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-10-16 | Plug Back Performed |
2016-10-16 | Well Fluid changed to Gas |
2016-10-16 | Well Mode changed to Abandoned Zone |
2016-10-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-10-19 | Perforation Treatment Performed - Jet Perforation |
2016-10-19 | Perforation Treatment Performed - Remedial Casing |
2016-10-19 | Plug Back Performed |
2016-10-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-10-22 | Perforation Treatment Performed - Jet Perforation |
2016-10-22 | Perforation Treatment Performed - Remedial Casing |
2016-10-22 | Plug Back Performed |
2016-10-27 | Well Abandoned |
2016-10-27 | Well Fluid changed to Gas |
2016-10-27 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-08-12 | Perforation | 1820.00 | 1821.40 | 13 |
2016-10-22 | Perforation | 594.00 | 595.00 | 17 |
2016-10-22 | Remedial Casing Cementing | 594.00 | 595.00 | 0 |
2016-10-22 | Packing Device Capped w/Cement | 562.70 | 592.70 | 0 |
1993-08-13 | Acid Treatment | 1820.00 | 1821.40 | 0 |
1993-08-13 | Fracture | 1820.00 | 1821.40 | 0 |
2004-08-10 | Fracture | 1820.00 | 1821.40 | 0 |
2004-12-07 | Chemical Squeeze | 1820.00 | 1821.40 | 0 |
2016-10-16 | Packing Device Capped w/Cement | 1799.70 | 1809.70 | 0 |
2016-10-19 | Perforation | 682.00 | 683.00 | 17 |
2016-10-19 | Remedial Casing Cementing | 682.00 | 683.00 | 0 |
2016-10-19 | Packing Device Capped w/Cement | 661.70 | 679.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 2387 | 0.0 | 0.0 | 0.0 |
1994 | 8602 | 0.0 | 0.0 | 0.0 |
1995 | 8631 | 0.0 | 0.0 | 0.0 |
1996 | 8552 | 0.0 | 0.0 | 0.0 |
1997 | 8642 | 0.0 | 0.0 | 0.0 |
1998 | 8658 | 0.0 | 0.0 | 0.0 |
1999 | 8458 | 0.0 | 0.0 | 0.0 |
2000 | 8554 | 0.0 | 0.0 | 0.0 |
2001 | 8172 | 0.0 | 0.0 | 0.0 |
2002 | 8669 | 0.0 | 0.0 | 0.0 |
2003 | 8717 | 0.0 | 0.0 | 0.0 |
2004 | 6799 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-10-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]