X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405042006000

Well Details

Well ID: 0405042006000
Loading map...
Location: 00/06-20-040-04W5/0
Location Alias: 00/06-20-40-04 W5M
Location Alias 2: 00/06-20-040-04 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 04
Section: 20
County/Municipality: Clearwater County
Well Name: HARVEST GILBY 6-20-40-4
Operator Name: Harvest Operations Corp.
License Number: 0008282
License Date: 1954-07-27
License Status: Abandoned
Spud Date: 1954-07-30
Final Drill Date: 1954-09-26
Well Total Depth: 2414.00 m
Surface Hole Latitude: 52.456381
Surface Hole Longitude: -114.544424

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-07-27 Obtained License
1954-08-05 Drill Stem Test Performed
1954-08-15 Drill Stem Test Performed
1954-08-16 Drill Stem Test Performed
1954-08-18 Drill Stem Test Performed
1954-08-19 Drill Stem Test Performed
1954-08-28 Drill Stem Test Performed
1954-08-31 Drill Stem Test Performed
1954-09-01 Drill Stem Test Performed
1954-09-19 Drill Stem Test Performed
1954-09-20 Drill Stem Test Performed
1954-09-23 Drill Stem Test Performed
1954-09-24 Drill Stem Test Performed
1954-09-25 Drill Stem Test Performed
1954-09-26 Drill Stem Test Performed
1954-09-26 Finished Drilling
1954-09-30 Production Casing Operation Performed
1954-10-05 Perforation Treatment Performed - Bullet Perforation
1954-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-10-06 Perforation Treatment Performed - Acid Wash - No Pressure
1954-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1954-10-06 Perforation Treatment Performed - Bullet Perforation
1954-10-06 Perforation Treatment Performed - Jet Perforation
1954-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-10-12 Perforation Treatment Performed - Bullet Perforation
1954-10-12 Perforation Treatment Performed - Cement Squeeze
1954-10-12 Perforation Treatment Performed - Fractured
1954-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-10-25 Perforation Treatment Performed - Bullet Perforation
1954-10-25 Perforation Treatment Performed - Cement Squeeze
1954-10-27 Perforation Treatment Performed - Cement Squeeze
1954-10-28 Perforation Treatment Performed - Cement Squeeze
1954-10-31 Perforation Treatment Performed - Cement Squeeze
1954-11-10 Perforation Treatment Performed - Bullet Perforation
1954-11-10 Perforation Treatment Performed - Fractured
1954-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1955-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-01-08 Perforation Treatment Performed - Fractured
1955-01-08 Perforation Treatment Performed - Jet Perforation
1955-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-02-09 Well Mode changed to Drilled and Cased
1971-02-23 Perforation Treatment Performed - Jet Perforation
1971-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-24 Perforation Treatment Performed - Fractured
1971-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-21 Perforation Treatment Performed - Jet Perforation
1976-12-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-12-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-30 Perforation Treatment Performed - Jet Perforation
1977-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-11-05 Well Fluid changed to Gas
1985-11-05 Well Mode changed to Testing
1985-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-11-06 Plug Back Performed
1985-11-06 Well Fluid changed to Gas
1985-11-06 Well Log Performed
1985-11-06 Well Mode changed to Abandoned Zone
1985-11-07 Well Log Performed
1985-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-08 Perforation Treatment Performed - Jet Perforation
1985-11-09 Perforation Treatment Performed - Fractured
1996-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-03 Perforation Treatment Performed - Cement Plug
1996-07-03 Perforation Treatment Performed - Jet Perforation
1996-07-03 Perforation Treatment Performed - Remedial Casing
1996-07-03 Plug Back Performed
1999-12-22 Well Abandoned
2001-12-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-10-05 Bullet Perforation 2368.30 2386.60 20
1954-10-06 Packing Device Capped w/Cement 2324.40 2327.50 0
1954-10-06 Perforation 2315.90 2318.90 13
1954-10-06 Perforation 2314.00 2315.30 13
1954-10-06 Perforation 2311.60 2313.10 13
1954-10-06 Perforation 2305.20 2310.70 13
1954-10-12 Acid Treatment 2305.20 2318.90 0
1954-10-12 Cement Squeeze 2305.20 2318.90 0
1954-10-12 Bullet Perforation 1824.20 1830.30 20
1954-10-12 Acid Treatment 1824.20 1830.30 0
1954-10-12 Fracture 1824.20 1830.30 0
1954-10-06 Acid Wash 2368.30 2386.60 0
1954-10-12 Cement Squeeze 1822.10 1822.10 0
1954-10-12 Bullet Perforation 1817.80 1820.90 20
1954-10-12 Acid Treatment 1817.80 1820.90 0
1954-10-12 Fracture 1817.80 1820.90 0
1954-10-25 Cement Squeeze 1817.80 1820.90 0
1954-10-25 Bullet Perforation 1468.80 1470.10 20
1954-10-25 Bullet Perforation 1466.40 1468.20 20
1954-10-25 Bullet Perforation 1461.20 1465.50 20
1954-10-25 Acid Treatment 1461.20 1470.10 0
1954-10-27 Cement Squeeze 1461.20 1470.10 0
1954-10-06 Acid Treatment 2368.30 2386.60 0
1954-10-28 Cement Squeeze 1461.20 1470.10 0
1954-10-31 Cement Squeeze 1461.20 1470.10 0
1954-11-10 Bullet Perforation 2305.20 2317.10 13
1954-11-10 Fracture 2305.20 2317.10 0
1954-11-11 Acid Treatment 2305.20 2317.10 0
1955-01-06 Packing Device Capped w/Cement 1839.50 1844.00 0
1955-01-08 Perforation 1824.20 1830.30 13
1955-01-08 Acid Treatment 1824.20 1830.30 0
1955-01-08 Fracture 1824.20 1830.30 0
1955-01-15 Acid Treatment 1824.20 1830.30 0
1954-10-06 Packing Device Capped w/Cement 2359.20 2359.20 0
1971-02-23 Perforation 1817.80 1821.20 7
1971-02-23 Perforation 1831.20 1834.30 7
1971-02-23 Perforation 1834.90 1837.90 7
1971-02-24 Acid Treatment 1817.80 1837.90 0
1971-02-24 Fracture 1817.80 1837.90 0
1971-03-13 Acid Treatment 1817.80 1837.90 0
1976-12-21 Perforation 2305.20 2317.10 7
1976-12-29 Packing Device Capped w/Cement 2158.00 2158.00 0
1976-12-30 Perforation 2119.60 2121.40 7
1976-12-30 Acid Treatment 2119.60 2121.40 0
1954-10-06 Bullet Perforation 2350.00 2354.60 20
1977-01-05 Packing Device Capped w/Cement 2090.90 2100.10 0
1985-11-06 Packing Device Capped w/Cement 1810.00 1810.00 0
1985-11-06 Packing Device Capped w/Cement 1457.00 1457.00 0
1985-11-06 Packing Device Capped w/Cement 1429.00 1429.00 0
1985-11-08 Perforation 1386.60 1392.60 13
1985-11-08 Acid Treatment 1386.60 1392.60 0
1985-11-09 Fracture 1386.60 1392.60 0
1996-07-03 Packing Device Capped w/Cement 1365.00 1373.00 0
1996-07-03 Perforation 520.00 520.50 80
1996-07-03 Remedial Casing Cementing 520.00 520.50 0
1954-10-06 Bullet Perforation 2334.20 2339.60 20
1996-07-03 Cement Plug 471.00 520.50 0
1954-10-06 Bullet Perforation 2331.10 2334.50 20
1954-10-06 Acid Treatment 2331.10 2354.60 0
1954-10-06 Acid Treatment 2331.10 2354.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References