X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405033012000

Well Details

Well ID: 0405033012000
Loading map...
Location: 00/12-30-040-03W5/0
Location Alias: 00/12-30-40-03 W5M
Location Alias 2: 00/12-30-040-03 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 03
Section: 30
County/Municipality: Lacombe County
Well Name: OMERS ENERGY GILBY 12-30-40-3
Operator Name: Gain Energy Ltd.
License Number: 0022729
License Date: 1962-07-16
License Status: Issued
Spud Date: 1962-07-16
Final Drill Date: 1962-07-30
Well Total Depth: 2195.20 m
Surface Hole Latitude: 52.474064
Surface Hole Longitude: -114.430365

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-07-16 Obtained License
1962-07-30 Drill Stem Test Performed
1962-07-30 Finished Drilling
1962-07-30 Well Mode changed to Drilled and Cased
1962-07-31 Production Casing Operation Performed
1962-08-04 Perforation Treatment Performed - Cement Squeeze
1962-08-04 Perforation Treatment Performed - Jet Perforation
1962-08-05 Perforation Treatment Performed - Cement Squeeze
1962-08-05 Perforation Treatment Performed - Jet Perforation
1962-08-07 Perforation Treatment Performed - Jet Perforation
1962-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-08-10 Perforation Treatment Performed - Fractured
1962-08-15 Perforation Treatment Performed - Cement Squeeze
1962-08-18 Perforation Treatment Performed - Jet Perforation
1962-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-08-27 Well Began Production
1962-08-27 Well Fluid changed to Crude Oil
1962-08-27 Well Mode changed to Pumping
1971-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-06-07 Perforation Treatment Performed - Jet Perforation
1972-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-09-27 Perforation Treatment Performed - Fractured
1975-06-19 Well Fluid changed to Crude Oil
1975-06-19 Well Mode changed to Flowing
1988-09-15 Well Fluid changed to Crude Oil
1988-09-15 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-08-04 Perforation 1656.60 1657.20 13
1962-08-18 Perforation 2147.60 2149.10 13
1962-08-19 Acid Treatment 2142.70 2149.10 0
1971-06-07 Perforation 1645.30 1649.00 7
1971-06-07 Acid Treatment 1645.30 1649.00 0
1972-09-26 Acid Treatment 2142.70 2149.10 0
1972-09-27 Fracture 2142.70 2149.10 0
1962-08-04 Cement Squeeze 1656.60 1657.20 0
1962-08-05 Perforation 1642.30 1642.90 13
1962-08-05 Cement Squeeze 1642.30 1642.90 0
1962-08-07 Perforation 1645.90 1649.00 13
1962-08-08 Acid Treatment 1645.90 1649.00 0
1962-08-10 Fracture 1645.90 1649.00 0
1962-08-15 Cement Squeeze 1645.90 1649.00 0
1962-08-18 Perforation 2142.70 2144.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2569 0.0 0.0 0.0
1968 7025 0.0 0.0 0.0
1969 128 0.0 0.0 0.0
1972 2136 0.0 0.0 0.0
1973 1208 0.0 0.0 0.0
1975 1888 0.0 0.0 0.0
1976 8386 0.0 0.0 0.0
1977 8299 0.0 0.0 0.0
1978 8063 0.0 0.0 0.0
1979 4227 0.0 0.0 0.0
1980 7333 0.0 0.0 0.0
1981 7310 0.0 0.0 0.0
1982 7231 0.0 0.0 0.0
1983 7447 0.0 0.0 0.0
1984 8356 0.0 0.0 0.0
1985 8027 0.0 0.0 0.0
1986 8258 0.0 0.0 0.0
1987 8530 0.0 0.0 0.0
1988 8189 0.0 0.0 0.0
1989 8608 0.0 0.0 0.0
1990 8350 0.0 0.0 0.0
1991 8394 0.0 0.0 0.0
1992 8145 0.0 0.0 0.0
1993 7868 0.0 0.0 0.0
1994 7694 0.0 0.0 0.0
1995 8208 0.0 0.0 0.0
1996 8225 0.0 0.0 0.0
1997 8417 0.0 0.0 0.0
1998 8628 0.0 0.0 0.0
1999 8535 0.0 0.0 0.0
2000 8639 0.0 0.0 0.0
2001 8497 0.0 0.0 0.0
2002 8143 0.0 0.0 0.0
2003 8415 0.0 0.0 0.0
2004 8235 0.0 0.0 0.0
2005 7583 0.0 0.0 0.0
2006 8683 0.0 0.0 0.0
2007 8331 0.0 0.0 0.0
2008 8470 0.0 0.0 0.0
2009 7770 0.0 0.0 0.0
2010 8359 0.0 0.0 0.0
2011 8394 0.0 0.0 0.0
2012 6907 0.0 0.0 0.0
2013 8397 0.0 0.0 0.0
2014 8068 0.0 0.0 0.0
2015 8676 0.0 0.0 0.0
2016 8522 0.0 0.0 0.0
2017 7908 0.0 0.0 0.0
2018 8450 0.0 0.0 0.0
2019 8640 0.0 0.0 0.0
2020 2170 0.0 0.0 0.0

For data sources see[5]

References