X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405031910000

Well Details

Well ID: 0405031910000
Loading map...
Location: 00/10-19-040-03W5/0
Location Alias: 00/10-19-40-03 W5M
Location Alias 2: 00/10-19-040-03 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 03
Section: 19
County/Municipality: Lacombe County
Well Name: OMERS ENERGY GILBY 10-19-40-3
Operator Name: Gain Energy Ltd.
License Number: 0019728
License Date: 1960-09-20
License Status: Suspension
Spud Date: 1960-09-23
Final Drill Date: 1960-10-11
Well Total Depth: 2200.70 m
Surface Hole Latitude: 52.459324
Surface Hole Longitude: -114.418009

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-09-20 Obtained License
1960-10-07 Drill Stem Test Performed
1960-10-09 Drill Stem Test Performed
1960-10-10 Drill Stem Test Performed
1960-10-11 Finished Drilling
1960-10-11 Well Mode changed to Drilled and Cased
1960-10-12 Production Casing Operation Performed
1960-10-15 Perforation Treatment Performed - Bullet Perforation
1960-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-10-17 Perforation Treatment Performed - Jet Perforation
1960-10-18 Perforation Treatment Performed - Cement Squeeze
1960-10-20 Perforation Treatment Performed - Jet Perforation
1960-11-01 Well Began Production
1960-11-01 Well Fluid changed to Crude Oil
1960-11-01 Well Mode changed to Pumping
1972-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-10-27 Perforation Treatment Performed - Jet Perforation
1972-10-28 Perforation Treatment Performed - Fractured
1985-06-01 Well Log Performed
1992-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-11-01 Well Fluid changed to Crude Oil
2014-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-10-15 Bullet Perforation 2173.20 2179.30 3
1972-10-27 Perforation 2155.50 2156.50 7
1972-10-27 Acid Treatment 2147.60 2161.90 0
1972-10-28 Fracture 2147.60 2161.90 0
1992-02-06 Acid Treatment 2147.60 2161.90 0
1960-10-17 Packing Device Capped w/Cement 2170.20 2170.20 0
1960-10-17 Perforation 1656.30 1660.90 13
1960-10-17 Acid Treatment 1656.30 1660.90 0
1960-10-18 Cement Squeeze 1656.30 1660.90 0
1960-10-20 Perforation 2156.50 2159.50 13
1960-10-20 Perforation 2160.40 2161.90 13
1972-10-27 Perforation 2147.60 2149.10 7
1972-10-27 Perforation 2149.80 2151.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7894 0.0 0.0 0.0
1968 8559 0.0 0.0 0.0
1969 8001 0.0 0.0 0.0
1970 5454 0.0 0.0 0.0
1971 928 0.0 0.0 0.0
1972 4327 0.0 0.0 0.0
1973 1320 0.0 0.0 0.0
1974 6086 0.0 0.0 0.0
1976 4029 0.0 0.0 0.0
1977 8141 0.0 0.0 0.0
1978 8169 0.0 0.0 0.0
1979 7712 0.0 0.0 0.0
1980 7829 0.0 0.0 0.0
1981 7575 0.0 0.0 0.0
1982 8110 0.0 0.0 0.0
1983 7596 0.0 0.0 0.0
1984 8201 0.0 0.0 0.0
1985 8132 0.0 0.0 0.0
1986 7922 0.0 0.0 0.0
1987 8459 0.0 0.0 0.0
1988 7766 0.0 0.0 0.0
1989 8506 0.0 0.0 0.0
1990 8468 0.0 0.0 0.0
1991 8374 0.0 0.0 0.0
1992 8681 0.0 0.0 0.0
1993 8251 0.0 0.0 0.0
1994 8260 0.0 0.0 0.0
1995 8496 0.0 0.0 0.0
1996 8348 0.0 0.0 0.0
1997 8646 0.0 0.0 0.0
1998 8638 0.0 0.0 0.0
1999 8545 0.0 0.0 0.0
2000 8609 0.0 0.0 0.0
2001 8395 0.0 0.0 0.0
2002 8115 0.0 0.0 0.0
2003 8309 0.0 0.0 0.0
2004 8310 0.0 0.0 0.0
2005 8109 0.0 0.0 0.0
2006 8437 0.0 0.0 0.0
2007 7969 0.0 0.0 0.0
2008 8032 0.0 0.0 0.0
2009 8284 0.0 0.0 0.0
2010 8263 0.0 0.0 0.0
2011 8624 0.0 0.0 0.0
2012 7824 0.0 0.0 0.0
2013 5726 0.0 0.0 0.0

For data sources see[5]

References