X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405031908000

Well Details

Well ID: 0405031908000
Loading map...
Location: 00/08-19-040-03W5/0
Location Alias: 00/08-19-40-03 W5M
Location Alias 2: 00/08-19-040-03 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 03
Section: 19
County/Municipality: Lacombe County
Well Name: OMERS ENERGY GILBY 8-19-40-3
Operator Name: Gain Energy Ltd.
License Number: 0022087
License Date: 1962-02-09
License Status: Suspension
Spud Date: 1962-02-10
Final Drill Date: 1962-02-24
Well Total Depth: 2161.60 m
Surface Hole Latitude: 52.455682
Surface Hole Longitude: -114.412804

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-02-09 Obtained License
1962-02-24 Finished Drilling
1962-02-24 Well Mode changed to Drilled and Cased
1962-02-25 Drill Stem Test Performed
1962-02-26 Production Casing Operation Performed
1962-02-28 Perforation Treatment Performed - Jet Perforation
1962-03-05 Well Began Production
1962-03-05 Well Fluid changed to Crude Oil
1962-03-05 Well Mode changed to Flowing
1962-03-19 Well Fluid changed to Crude Oil
1962-03-19 Well Mode changed to Pumping
1977-07-14 Perforation Treatment Performed - Condensate Squeeze
1987-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-27 Perforation Treatment Performed - Jet Perforation
1988-07-27 Well Log Performed
1988-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-05 Well Log Performed
2003-02-06 Well Log Performed
2003-02-08 Perforation Treatment Performed - Jet Perforation
2003-02-08 Well Log Performed
2003-02-09 Perforation Treatment Performed - Remedial Casing
2013-07-01 Well Fluid changed to Crude Oil
2013-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-02-28 Perforation 2136.60 2139.10 13
1977-07-14 Condensate Squeeze 2136.60 2139.10 0
1987-05-11 Acid Treatment 2136.60 2139.10 0
1988-07-27 Perforation 2137.90 2140.90 26
1988-07-28 Acid Treatment 2136.60 2140.90 0
2003-02-08 Perforation 1018.00 1019.00 14
2003-02-09 Remedial Casing Cementing 1018.00 1019.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8017 0.0 0.0 0.0
1968 8469 0.0 0.0 0.0
1969 7009 0.0 0.0 0.0
1970 2810 0.0 0.0 0.0
1971 6513 0.0 0.0 0.0
1972 5517 0.0 0.0 0.0
1973 7933 0.0 0.0 0.0
1975 4221 0.0 0.0 0.0
1976 8185 0.0 0.0 0.0
1977 5396 0.0 0.0 0.0
1978 7942 0.0 0.0 0.0
1979 7205 0.0 0.0 0.0
1980 7562 0.0 0.0 0.0
1981 7037 0.0 0.0 0.0
1982 7882 0.0 0.0 0.0
1983 7804 0.0 0.0 0.0
1984 7883 0.0 0.0 0.0
1985 8168 0.0 0.0 0.0
1986 8392 0.0 0.0 0.0
1987 8173 0.0 0.0 0.0
1988 7915 0.0 0.0 0.0
1989 8275 0.0 0.0 0.0
1990 8420 0.0 0.0 0.0
1991 8539 0.0 0.0 0.0
1992 8759 0.0 0.0 0.0
1993 8507 0.0 0.0 0.0
1994 7968 0.0 0.0 0.0
1995 8357 0.0 0.0 0.0
1996 7610 0.0 0.0 0.0
1997 8273 0.0 0.0 0.0
1998 8247 0.0 0.0 0.0
1999 8300 0.0 0.0 0.0
2000 8690 0.0 0.0 0.0
2001 8211 0.0 0.0 0.0
2002 8522 0.0 0.0 0.0
2003 7821 0.0 0.0 0.0
2004 8386 0.0 0.0 0.0
2005 6285 0.0 0.0 0.0
2006 5699 0.0 0.0 0.0
2007 6491 0.0 0.0 0.0
2008 1174 0.0 0.0 0.0
2009 6445 0.0 0.0 0.0
2010 6379 0.0 0.0 0.0
2011 8394 0.0 0.0 0.0
2012 552 0.0 0.0 0.0

For data sources see[5]

References