X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405023504000

Well Details

Well ID: 0405023504000
Loading map...
Location: 00/04-35-040-02W5/0
Location Alias: 00/04-35-40-02 W5M
Location Alias 2: 00/04-35-040-02 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 02
Section: 35
County/Municipality: Lacombe County
Well Name: CHEVRON GILBY IN 4-35-40-2
Operator Name: Chevron Canada Limited
License Number: 0017067
License Date: 1959-05-15
License Status: RecCertified
Spud Date: 1959-05-25
Final Drill Date: 1959-06-02
Well Total Depth: 1821.20 m
Surface Hole Latitude: 52.481430
Surface Hole Longitude: -114.190938

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-05-15 Obtained License
1959-06-02 Finished Drilling
1959-06-02 Well Mode changed to Drilled and Cased
1959-06-03 Drill Stem Test Performed
1959-06-04 Production Casing Operation Performed
1959-06-05 Perforation Treatment Performed - Bullet Perforation
1959-06-05 Perforation Treatment Performed - Jet Perforation
1959-07-01 Well Began Production
1959-07-01 Well Fluid changed to Crude Oil
1959-07-01 Well Mode changed to Pumping
1959-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-07-23 Perforation Treatment Performed - Acid Wash - No Pressure
1959-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-08-08 Perforation Treatment Performed - Acid Wash - No Pressure
1959-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-08-14 Perforation Treatment Performed - Fractured
1962-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-15 Well Began Injection
1963-01-15 Well Fluid changed to Water
1963-01-15 Well Type changed to Injection
1972-11-01 Well Fluid changed to Water
1972-11-01 Well Mode changed to Suspended
1972-11-01 Well Type changed to Injection
1990-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-20 Plug Back Performed
1990-09-20 Well Fluid changed to Water
1990-09-20 Well Mode changed to Abandoned
1990-09-20 Well Type changed to Injection
1990-09-22 Perforation Treatment Performed - Jet Perforation
1990-09-24 Perforation Treatment Performed - Remedial Casing
1990-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-03 Perforation Treatment Performed - Jet Perforation
1990-10-04 Perforation Treatment Performed - Remedial Casing
1990-10-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-06-05 Bullet Perforation 1800.80 1805.90 13
1990-09-20 Packing Device Capped w/Cement 1772.00 1790.00 0
1990-09-22 Perforation 419.00 419.50 56
1990-09-24 Remedial Casing Cementing 419.00 419.50 0
1990-10-03 Perforation 205.00 205.40 13
1990-10-03 Acid Treatment 205.00 205.40 0
1990-10-04 Remedial Casing Cementing 205.00 205.40 0
1959-06-05 Perforation 1800.80 1805.90 13
1959-07-23 Acid Wash 1800.80 1805.90 0
1959-07-23 Acid Treatment 1800.80 1805.90 0
1959-08-08 Acid Wash 1800.80 1805.90 0
1959-08-08 Acid Treatment 1800.80 1805.90 0
1959-08-09 Acid Treatment 1800.80 1805.90 0
1959-08-14 Fracture 1800.80 1805.90 0
1962-12-21 Acid Treatment 1800.80 1805.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0

For data sources see[5]

References