X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404213108002

Well Details

Well ID: 0404213108002
Loading map...
Location: 00/08-31-040-21W4/2
Location Alias: 00/08-31-40-21 W4M
Location Alias 2: 00/08-31-040-21 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 21
Section: 31
County/Municipality: Lacombe County
Well Name: EMBER BASHAW 8-31-40-21
Operator Name: Ember Resources Inc.
License Number: 0135641
License Date: 1988-08-18
License Status: Issued
Spud Date: 1988-08-24
Final Drill Date: 1988-08-27
Well Total Depth: 710.00 m
Surface Hole Latitude: 52.481543
Surface Hole Longitude: -113.008815

For data sources see[1][2]

Well History

Date Event
1988-08-18 Obtained License
1988-08-25 Surface Casing Operation Performed
1988-08-27 Finished Drilling
1988-08-27 Well Log Performed
1988-08-27 Well Mode changed to Drilled and Cased
1988-08-28 Production Casing Operation Performed
1988-08-28 Rig Released
1988-08-31 Well Log Performed
1988-09-02 Perforation Treatment Performed - Jet Perforation
1988-09-04 Perforation Treatment Performed - Fractured
1988-09-05 Well Log Performed
1989-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-12-20 Plug Back Performed
1989-12-21 Perforation Treatment Performed - Jet Perforation
1989-12-21 Well Log Performed
1989-12-23 Well Type changed to Observation
2009-01-07 Perforation Treatment Performed - Jet Perforation
2009-01-07 Well Log Performed
2009-01-21 Perforation Treatment Performed - Fractured
2009-07-22 Well Began Production
2009-07-22 Well Fluid changed to Coalbed Methane-Coals and Other
2009-07-22 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-02 Perforation 329.00 331.00 13
2009-01-07 Perforation 213.00 213.50 14
2009-01-07 Perforation 219.00 220.00 14
2009-01-07 Perforation 221.00 222.00 14
2009-01-07 Perforation 224.00 226.00 14
2009-01-07 Perforation 235.00 236.50 14
2009-01-07 Perforation 247.50 249.00 14
2009-01-07 Perforation 259.50 261.50 14
2009-01-07 Perforation 269.00 270.00 14
2009-01-07 Perforation 295.00 295.50 14
2009-01-07 Perforation 307.00 308.00 14
1988-09-02 Perforation 367.50 368.50 13
2009-01-07 Perforation 312.00 313.00 14
2009-01-21 Fracture 154.00 270.00 0
1988-09-02 Perforation 377.50 379.00 13
1988-09-02 Perforation 404.50 405.50 13
1988-09-04 Fracture 329.00 405.50 0
1989-12-20 Packing Device Capped w/Cement 312.00 320.00 0
1989-12-21 Perforation 277.00 280.00 7
2009-01-07 Perforation 154.00 155.00 14
2009-01-07 Perforation 170.00 171.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 3757 0.0 0.0 0.0
2010 8751 0.0 0.0 0.0
2011 8714 0.0 0.0 0.0
2012 8601 0.0 0.0 0.0
2013 8693 0.0 0.0 0.0
2014 8163 0.0 0.0 0.0
2015 8704 0.0 0.0 0.0
2016 8635 0.0 0.0 0.0
2017 8564 0.0 0.0 0.0
2018 8499 0.0 0.0 0.0
2019 8496 0.0 0.0 0.0
2020 2084 0.0 0.0 0.0

For data sources see[5]

References