X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404162506002

Well Details

Well ID: 0404162506002
Loading map...
Location: 00/06-25-040-16W4/2
Location Alias: 00/06-25-40-16 W4M
Location Alias 2: 00/06-25-040-16 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 16
Section: 25
County/Municipality: County of Paintearth No. 18
Well Name: CPEC REDWILOW 6-25-40-16
Operator Name: Crescent Point Energy Corp.
License Number: 0143053
License Date: 1990-01-31
License Status: RecCertified
Spud Date: 1990-02-02
Final Drill Date: 1990-02-08
Well Total Depth: 1310.00 m
Surface Hole Latitude: 52.469700
Surface Hole Longitude: -112.181668

For data sources see[1][2]

Well History

Date Event
1990-01-09 Well Log Performed
1990-01-31 Obtained License
1990-02-03 Surface Casing Operation Performed
1990-02-08 Finished Drilling
1990-02-08 Well Log Performed
1990-02-09 Well Log Performed
1990-02-10 Production Casing Operation Performed
1990-02-10 Rig Released
1990-02-21 Well Log Performed
1990-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-23 Perforation Treatment Performed - Jet Perforation
1990-02-23 Well Log Performed
1990-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-20 Perforation Treatment Performed - Cement Squeeze
1990-07-20 Perforation Treatment Performed - Jet Perforation
1990-07-20 Well Log Performed
1990-07-20 Well Mode changed to Drilled and Cased
1990-07-21 Perforation Treatment Performed - Cement Squeeze
1990-07-21 Perforation Treatment Performed - Jet Perforation
1990-07-25 Perforation Treatment Performed - Jet Perforation
1990-07-25 Well Log Performed
2000-09-29 Well Began Production
2000-09-29 Well Fluid changed to Gas
2000-09-29 Well Mode changed to Flowing
2001-09-02 Well Fluid changed to Gas
2001-09-02 Well Mode changed to Suspended
2002-10-25 Well Fluid changed to Gas
2002-10-25 Well Mode changed to Flowing
2011-09-01 Well Fluid changed to Gas
2011-09-01 Well Mode changed to Suspended
2014-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-09-23 Plug Back Performed
2014-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-09-24 Plug Back Performed
2014-09-24 Well Log Performed
2014-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-10-02 Plug Back Performed
2014-10-02 Well Fluid changed to Gas
2014-10-02 Well Log Performed
2014-10-02 Well Mode changed to Abandoned Zone
2014-10-17 Well Abandoned
2014-10-17 Well Fluid changed to Gas
2014-10-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-02-23 Perforation 1226.00 1229.00 10
2014-09-24 Packing Device Capped w/Cement 1035.00 1091.00 0
2014-10-02 Packing Device Capped w/Cement 405.30 414.80 0
1990-02-23 Acid Treatment 1226.00 1229.00 0
1990-02-24 Acid Treatment 1226.00 1229.00 0
1990-07-20 Perforation 1117.00 1117.60 26
1990-07-20 Cement Squeeze 1117.00 1117.60 0
1990-07-21 Perforation 1093.00 1093.60 26
1990-07-21 Cement Squeeze 1093.00 1093.60 0
1990-07-25 Perforation 1106.00 1110.00 14
2014-09-23 Packing Device Capped w/Cement 1212.00 1220.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1995 0.0 0.0 0.0
2001 1136 0.0 0.0 0.0
2002 184 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References