X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404160410040

Well Details

Well ID: 0404160410040
Loading map...
Location: 04/10-04-040-16W4/0
Location Alias: 04/10-04-40-16 W4M
Location Alias 2: 04/10-04-040-16 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 16
Section: 04
County/Municipality: County of Paintearth No. 18
Well Name: COREXCAL ETAL RED WILLOW A10-4-40-16
Operator Name: Corexcal, Inc.
License Number: 0090927
License Date: 1981-06-25
License Status: RecCertified
Spud Date: 1981-06-25
Final Drill Date: 1981-07-04
Well Total Depth: 1338.00 m
Surface Hole Latitude: 52.414898
Surface Hole Longitude: -112.246586

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-06-25 Obtained License
1981-07-04 Finished Drilling
1981-07-04 Well Log Performed
1981-07-04 Well Mode changed to Drilled and Cased
1981-07-05 Drill Stem Test Performed
1981-07-07 Production Casing Operation Performed
1981-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-30 Perforation Treatment Performed - Jet Perforation
1981-08-06 Perforation Treatment Performed - Jet Perforation
1981-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-14 Well Began Production
1982-06-14 Well Fluid changed to Crude Oil
1982-06-14 Well Mode changed to Pumping
1982-09-16 Well Fluid changed to Crude Oil
1982-09-16 Well Mode changed to Suspended
1983-05-23 Well Fluid changed to Crude Oil
1983-05-23 Well Mode changed to Pumping
1984-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-07-08 Plug Back Performed
1984-07-08 Well Fluid changed to Crude Oil
1984-07-08 Well Log Performed
1984-07-08 Well Mode changed to Abandoned Zone
1984-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-26 Perforation Treatment Performed - Cement Squeeze
1986-02-26 Well Log Performed
1986-02-28 Perforation Treatment Performed - Jet Perforation
1986-02-28 Well Log Performed
1986-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-10-10 Plug Back Performed
1986-10-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-07-30 Perforation 1336.00 1337.50 7
1986-02-26 Cement Squeeze 1130.50 1132.00 0
1986-02-28 Perforation 1130.50 1131.50 13
1986-03-01 Acid Treatment 1130.50 1131.50 0
1986-10-10 Packing Device Capped w/Cement 1117.00 1125.00 0
1981-07-30 Acid Treatment 1336.00 1337.50 0
1981-08-06 Perforation 1130.50 1132.00 7
1981-09-25 Acid Treatment 1130.50 1132.00 0
1984-07-08 Packing Device Capped w/Cement 1322.00 1330.00 0
1984-07-09 Acid Treatment 1130.50 1132.00 0
1985-01-04 Acid Treatment 1130.50 1132.00 0
1985-08-11 Acid Treatment 1130.50 1132.00 0
1985-10-19 Acid Treatment 1130.50 1132.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1703 0.0 0.0 0.0
1983 2182 0.0 0.0 0.0

For data sources see[5]

References