X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404160404000

Well Details

Well ID: 0404160404000
Loading map...
Location: 00/04-04-040-16W4/0
Location Alias: 00/04-04-40-16 W4M
Location Alias 2: 00/04-04-040-16 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 16
Section: 04
County/Municipality: County of Paintearth No. 18
Well Name: CPEC REDWILOW 4-4-40-16
Operator Name: Crescent Point Energy Corp.
License Number: 0258082
License Date: 2001-07-31
License Status: Abandoned
Spud Date: 2001-08-21
Final Drill Date: 2001-08-25
Well Total Depth: 1206.00 m
Surface Hole Latitude: 52.408408
Surface Hole Longitude: -112.254838

For data sources see[1][2]

Well History

Date Event
2001-07-31 Obtained License
2001-08-22 Surface Casing Operation Performed
2001-08-22 Well Log Performed
2001-08-24 Well Log Performed
2001-08-25 Finished Drilling
2001-08-25 Production Casing Operation Performed
2001-08-25 Rig Released
2001-08-25 Well Mode changed to Drilled and Cased
2001-08-29 Well Log Performed
2001-08-30 Perforation Treatment Performed - Jet Perforation
2001-08-30 Well Log Performed
2001-10-25 Perforation Treatment Performed - Jet Perforation
2001-10-25 Well Log Performed
2001-10-27 Perforation Treatment Performed - Fractured
2002-04-09 Well Began Production
2002-04-09 Well Fluid changed to Gas
2002-04-09 Well Mode changed to Flowing
2006-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-09-08 Plug Back Performed
2006-09-08 Well Fluid changed to Gas
2006-09-08 Well Mode changed to Abandoned Zone
2015-04-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-04-20 Perforation Treatment Performed - Jet Perforation
2015-04-20 Plug Back Performed
2015-04-20 Well Log Performed
2015-04-22 Perforation Treatment Performed - Jet Perforation
2015-04-22 Well Log Performed
2015-04-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-04-24 Perforation Treatment Performed - Cement Squeeze
2015-04-24 Plug Back Performed
2015-04-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-04-25 Perforation Treatment Performed - Cement Squeeze
2015-04-25 Perforation Treatment Performed - Jet Perforation
2015-04-25 Plug Back Performed
2015-05-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-08-30 Perforation 1173.50 1174.50 17
2015-04-24 Cement Squeeze 285.00 286.00 0
2015-04-25 Perforation 240.00 241.00 17
2015-04-25 Packing Device Capped w/Cement 227.00 237.00 0
2015-04-25 Cement Squeeze 240.00 241.00 0
2001-08-30 Perforation 1176.00 1178.00 17
2001-10-25 Perforation 995.50 996.50 17
2001-10-27 Fracture 995.50 996.50 0
2006-09-08 Packing Device Capped w/Cement 1162.00 1170.50 0
2015-04-20 Packing Device Capped w/Cement 983.00 991.00 0
2015-04-20 Perforation 285.00 286.00 17
2015-04-22 Perforation 256.00 257.00 17
2015-04-24 Packing Device Capped w/Cement 247.00 282.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 5893 0.0 0.0 0.0
2003 7325 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-04-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References