X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404153012003

Well Details

Well ID: 0404153012003
Loading map...
Location: 00/12-30-040-15W4/3
Location Alias: 00/12-30-40-15 W4M
Location Alias 2: 00/12-30-040-15 W4/03
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 15
Section: 30
County/Municipality: County of Paintearth No. 18
Well Name: CPEC REDWILOW 12-30-40-15
Operator Name: Crescent Point Energy Corp.
License Number: 0140765
License Date: 1989-08-30
License Status: Abandoned
Spud Date: 1989-09-05
Final Drill Date: 1989-09-13
Well Total Depth: 1289.00 m
Surface Hole Latitude: 52.471416
Surface Hole Longitude: -112.163785

For data sources see[1][2]

Well History

Date Event
1989-08-30 Obtained License
1989-09-06 Surface Casing Operation Performed
1989-09-08 Direction Drilling Operation Performed - Deviate
1989-09-12 Well Log Performed
1989-09-13 Drill Stem Test Performed
1989-09-13 Finished Drilling
1989-09-13 Well Log Performed
1989-09-13 Well Mode changed to Drilled and Cased
1989-09-14 Production Casing Operation Performed
1989-09-14 Well Log Performed
1989-09-15 Rig Released
1989-09-15 Well Log Performed
1989-09-29 Well Log Performed
1989-09-30 Well Log Performed
1989-10-01 Perforation Treatment Performed - Jet Perforation
1989-10-03 Well Log Performed
1989-10-04 Perforation Treatment Performed - Jet Perforation
1989-10-12 Well Log Performed
2000-12-10 Well Log Performed
2000-12-11 Perforation Treatment Performed - Jet Perforation
2007-09-07 Perforation Treatment Performed - Cement Squeeze
2007-09-07 Plug Back Performed
2007-09-10 Perforation Treatment Performed - Jet Perforation
2007-09-29 Well Began Production
2007-09-29 Well Fluid changed to Gas
2007-09-29 Well Mode changed to Flowing
2008-12-14 Perforation Treatment Performed - Jet Perforation
2008-12-15 Perforation Treatment Performed - Jet Perforation
2009-01-10 Perforation Treatment Performed - Cement Squeeze
2009-01-10 Plug Back Performed
2009-01-10 Well Fluid changed to Gas
2009-01-10 Well Mode changed to Abandoned Zone
2018-01-16 Perforation Treatment Performed - Cement Plug
2018-01-16 Plug Back Performed
2018-01-16 Well Log Performed
2018-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-01-17 Plug Back Performed
2018-01-17 Well Log Performed
2018-01-18 Perforation Treatment Performed - Jet Perforation
2018-01-18 Well Log Performed
2018-01-22 Perforation Treatment Performed - Cement Plug
2018-01-22 Perforation Treatment Performed - Cement Squeeze
2018-01-22 Plug Back Performed
2018-01-23 Well Abandoned
2018-01-23 Well Fluid changed to Gas
2018-01-23 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-09-08 910.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-10-01 Perforation 1208.50 1212.00 10
2018-01-17 Packing Device Capped w/Cement 1088.00 1096.00 0
2018-01-17 Packing Device Capped w/Cement 1034.00 1042.00 0
2018-01-18 Perforation 361.00 362.00 17
2018-01-22 Cement Squeeze 361.00 362.00 0
2018-01-22 Cement Plug 348.00 356.00 0
1989-10-04 Perforation 1198.00 1204.00 7
2000-12-11 Perforation 1099.00 1101.00 17
2007-09-07 Cement Squeeze 1198.00 1212.00 0
2007-09-10 Perforation 1045.00 1046.00 17
2008-12-14 Perforation 1099.00 1101.00 17
2008-12-15 Perforation 1099.00 1101.00 17
2009-01-10 Cement Squeeze 1045.00 1046.00 0
2018-01-16 Cement Plug 1101.80 1105.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 1903 0.0 0.0 0.0
2008 5229 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References