X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404152107003

Well Details

Well ID: 0404152107003
Loading map...
Location: 00/07-21-040-15W4/3
Location Alias: 00/07-21-40-15 W4M
Location Alias 2: 00/07-21-040-15 W4/03
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 15
Section: 21
County/Municipality: County of Paintearth No. 18
Well Name: ARS GALAHAD 7-21-40-15
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0169769
License Date: 1994-08-22
License Status: Issued
Spud Date: 1994-09-24
Final Drill Date: 1994-09-28
Well Total Depth: 1146.00 m
Surface Hole Latitude: 52.455140
Surface Hole Longitude: -112.100057

For data sources see[1][2]

Well History

Date Event
1994-08-22 Obtained License
1994-09-25 Direction Drilling Operation Performed - Deviate
1994-09-25 Surface Casing Operation Performed
1994-09-28 Finished Drilling
1994-09-28 Well Log Performed
1994-09-28 Well Mode changed to Drilled and Cased
1994-10-01 Production Casing Operation Performed
1994-10-01 Rig Released
1994-11-01 Perforation Treatment Performed - Jet Perforation
1994-11-21 Well Log Performed
1995-07-11 Perforation Treatment Performed - Jet Perforation
1996-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-10 Perforation Treatment Performed - Jet Perforation
1996-10-10 Plug Back Performed
2002-05-08 Perforation Treatment Performed - Jet Perforation
2003-07-02 Well Began Production
2003-07-02 Well Fluid changed to Gas
2003-07-02 Well Mode changed to Flowing
2007-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-04-02 Well Fluid changed to Gas
2008-04-02 Well Mode changed to Suspended
2010-06-29 Perforation Treatment Performed - Jet Perforation
2010-06-30 Perforation Treatment Performed - Cement Squeeze
2010-06-30 Perforation Treatment Performed - Jet Perforation
2010-06-30 Plug Back Performed
2010-06-30 Well Fluid changed to Gas
2010-06-30 Well Mode changed to Abandoned Zone
2010-07-08 Perforation Treatment Performed - Jet Perforation
2010-07-09 Perforation Treatment Performed - Cement Squeeze
2010-07-09 Plug Back Performed
2010-07-10 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-09-25 238.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-11-01 Perforation 1059.50 1060.20 13
2010-06-30 Cement Squeeze 877.50 879.50 0
2010-06-30 Perforation 881.00 883.00 17
2010-06-30 Cement Squeeze 881.00 883.00 0
2010-07-08 Perforation 1019.50 1020.50 17
2010-07-09 Cement Squeeze 1019.50 1020.50 0
2010-07-10 Perforation 1053.00 1060.20 17
1995-07-11 Perforation 1057.00 1058.50 13
1996-10-10 Packing Device Capped w/Cement 1042.00 1050.00 0
1996-10-10 Perforation 1019.50 1020.50 14
2002-05-08 Perforation 877.50 879.50 20
2002-05-08 Perforation 881.00 883.00 20
2007-10-17 Packing Device Capped w/Cement 1008.00 1016.00 0
2007-10-17 Packing Device Capped w/Cement 862.00 870.00 0
2010-06-29 Perforation 877.50 879.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1276 0.0 0.0 0.0
2004 1199 0.0 0.0 0.0

For data sources see[6]

References