X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404151111003

Well Details

Well ID: 0404151111003
Loading map...
Location: 00/11-11-040-15W4/3
Location Alias: 00/11-11-40-15 W4M
Location Alias 2: 00/11-11-040-15 W4/03
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 15
Section: 11
County/Municipality: County of Paintearth No. 18
Well Name: CPEC GALAHAD 11-11-40-15
Operator Name: Crescent Point Energy Corp.
License Number: 0187368
License Date: 1996-04-24
License Status: Suspension
Spud Date: 1996-07-23
Final Drill Date: 1996-07-26
Well Total Depth: 1146.00 m
Surface Hole Latitude: 52.427124
Surface Hole Longitude: -112.061175

For data sources see[1][2]

Well History

Date Event
1996-04-24 Obtained License
1996-07-23 Surface Casing Operation Performed
1996-07-26 Finished Drilling
1996-07-26 Production Casing Operation Performed
1996-07-26 Well Log Performed
1996-07-26 Well Mode changed to Drilled and Cased
1996-07-27 Rig Released
1996-08-19 Well Log Performed
1996-08-20 Perforation Treatment Performed - Jet Perforation
1996-08-20 Well Log Performed
1996-11-08 Well Log Performed
1996-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-09 Plug Back Performed
1996-11-09 Well Log Performed
1996-11-10 Perforation Treatment Performed - Jet Perforation
1997-06-03 Well Began Production
1997-06-03 Well Fluid changed to Gas
1997-06-03 Well Mode changed to Flowing
1998-04-01 Well Fluid changed to Gas
1998-04-01 Well Mode changed to Suspended
2005-06-07 Perforation Treatment Performed - Cement Squeeze
2005-06-07 Plug Back Performed
2005-06-07 Well Fluid changed to Gas
2005-06-07 Well Mode changed to Abandoned Zone
2005-06-10 Perforation Treatment Performed - Jet Perforation
2005-06-11 Perforation Treatment Performed - Bridge Plug No Cement Required
2005-06-12 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-20 Perforation 1095.00 1097.00 13
2005-06-07 Cement Squeeze 1080.00 1081.00 0
2005-06-07 Cement Squeeze 1082.00 1084.00 0
2005-06-07 Cement Squeeze 1085.00 1086.00 0
2005-06-10 Perforation 1098.50 1100.00 14
2005-06-11 Bridge Plug, No Cement 1098.50 1100.00 0
2005-06-12 Perforation 1095.00 1098.00 14
1996-11-09 Packing Device Capped w/Cement 1090.00 1093.50 0
1996-11-10 Perforation 1050.50 1052.50 13
1996-11-10 Perforation 1078.00 1079.00 13
1996-11-10 Perforation 1080.00 1081.00 13
1996-11-10 Perforation 1082.00 1084.00 13
1996-11-10 Perforation 1085.00 1086.00 13
2005-06-07 Cement Squeeze 1050.50 1052.50 0
2005-06-07 Cement Squeeze 1078.00 1079.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1609 0.0 0.0 0.0

For data sources see[5]

References